1.Peningkatan/Rehabllltasl Jalaa Lebar 3 Meter (Datar) Satuatr: Km tro. KODE I'RAIAN KODE SATUAIT KOEFIAIEIT AXALIAA VOLT'fE IIARGA AATUIIN (Rpl JI'ULAIT IIARGA (Rpl I 2 o 4 5 6 7 t 9 I 1.2 lLs Mobitiesi r,oooo 1,0000 Sewa Direksi 14691 + gudmg (sewa stmd) m2 56,0000 56,0000 4l.700,00 2.335.200,00 Demobilisasi ls 0,3000 0,3ooo 623.O40,00 186.9r2,00 Mobilissi alat (swa truck dobel) EO6 ls 1,0000 1,0000 6.230.400,00 6.230.400,O0 2 1.8.1 1Ls Mmajemen dan Keselamatan lilu Lintas r,0000 1,0000 Pekeda (Flagman) OH 130,0000 149,0000 90.000,oo 9.295.000,O0 Koordinator / Pengatur OK 90.000,00 J 1.17 { tal 1bh Pengujim PH buah 9,0000 9,0000 74.OO0,00 666.000,00 4 1,19 lLs Keslmatan dan Kesehatan Kerja 1,0000 1,0000 Penyiapm RKK (biaya jilidl ls r,0000 1,0000 10.400,00 lo.400,oo Personel K3 Konstruksi bulan 5,O000 5,O000 5.132.750,00 25.663.750,00 Fasilitas ffia kesehatff ls 1,0000 1,0000 spatu boot kerja buah 15,0000 r5,0000 162.000,00 2.430.000,00 topi proyek buah 15,0000 15,0000 193.000,00 2.895.O00,00 smng tangan buah r5,0000 l5,oo00 30. r00,00 451.500,oo masker pemafas pak 2,OO00 2,OOO0 40.500,oo 8l.ooo,oo 5 t,2t lLs Manajemen Mutu 1,OO00 l,oooo Laporan Kendali Mutu (biaya jilid) unit 4,0000 4,0000 50.400,00 201.600,00 6 2.3.( 1s) lm' Gorong-gorong Kotak Beton Bertulmg, ukum dalm lO0 cm x 100 cm 33,0000 Pekerja (Lo 1) hari 0,0410 1,3530 90.000,00 121.770,OO Tukang (w2l hari o,0246 0,8118 130.000,00 105.534,00 Mandor (L03) hari 0,004 r 0,1353 145.000,00 19.6 18,50 Beton 30 Mpa (Ms9) M3 o,4622 ts,2526 3.574.294,49 54.5t7.284,t9 Baja Tulangan (M39) btg 7,2633 239,690s 15.o98,00 3.618.A44,37 pasir urug (EI- 24t) M3 o,2940 9,7020 269.OOO,00 2.609.838,00 Mat. Pilihan (M09) M3 3,1400 103,6200 413.O00,OO 42.795.060,OO Cetakm ukuran 100 x 100 bh/M' 1,0000 33,0000 313.500,00 10.345.s00,00 Lantai Keda Fc' 10 mpa m47 m3 0,1300 4,2900 1.528.635,69 54.517.284,19 Tmper (E2s) Jam 3,8540 t27,t820 44.900,00 5.710.471,80 Flat Bed Truck (E111 Jam o,0287 0,947 L 470.000,00 445.137,00 7 2.3.(22'l 1m' Saluran berbentuk U Tipe DS I 1.100,0000 Pekerja (1011 hari o,5737 63 1,0700 90.000,00 56.796.300,00 Tukang lw2l hari o,2869 315,5900 r30.000,00 41.026.700,OO Mandor (L03) hari o,0574 63,1 400 l45.OOO,O0 Semen (M12) zak o,9239 1.016,3010 90.300,00 9t.77t.980,30 Pasir Beton (M0ll M3 0,091s 100,6500 413.000,00 41.568.450,00 Aggregat Ka$r (Mo3l M3 o,1192 13 1,1200 s12.000,00 67.133.440,00 Fomworks (M1esl M2 1,0000 1.100,0000 313.500,00 344.850.000,00 Air (M170) Ltr 27,7500 30.525,0000 7,80 238.095,00 Lmtai Keda Beton Fc' 10 mPa M47 m3 0,0600 66,0000 1.528.635,69 100.889.955,s4 Plastik Cor rotl o,0560 61,6000 391.000,00 24.08s.600,00 Besi Beton (M57al ke 26,7232 29.395,5243 15.098,00 443.a13.626,15 Kawat beton (M14) Kg 0,0r50 r6,5000 30. r00,00 496.650,00 Beton Mixer (E06) Jam 0,4016 44t,7600 86.400,00 38.168.064,00 Water Tanker (E23) Jam 0,05s7 61,2700 308.900,00 18.926,303,OO Concrete vibmtor (E20) Jam 0,4016 44t,7600 61.300,00 27.O79.884,OO Exavator (El0) jam o,0240 26,4000 712.300,OO 18.804.720,00 8 3. 1.( 1l 1m3 Galian Biasa 165,0000 Pekeda (L011 hari 0,0011 0,1815 90.000,00 16.335,OO Mandor (103) hari 0,0006 0,0990 145.000,00 14.355,00 Excavator lEl0) Jam 0,0038 o,6270 7 12.300,00 l0 Dump Truck (Eoel bulan 0,0007 0, I20l 15.434 1.854.096,16 9 3.1.(e) 1m3 Galian Perkemsan berbutir 495,0000 Pekeda (L0 1) hari 0,0060 2,9700 7 t.775,OO Mandor (Lo3l hari o,0010 0,4950 I Excavator (Elol Jam 0,0070 3,4650 71 5.755.394,35 Dump Truck (E0e) bulan o,0008 o,3729 I 10 3.2.12a1 1m3 Timbunan Pilihan dari sumber galian 222,6023 )ekerja (rou hari 0,0023 0,5120 a ASB Konstruksi Jalan dan Jembatan - Halaman 64 9.155.300,00 90.000,00 90.000,00 NO. KODE I'RAI,AIT KODE AATUAT KOEFIAIEIT ATTALTSA voLt ur IIARGA AATUAI| lRpl JT'TIAII IIARGA (Rpl I 2 3 4 5 6 7 a 9 Mandor hari 0,0006 o,1336 14s.O00,00 19.366,40 Bahan pilihan urug (M09l/pasir (Ml6l M3 1,2000 267,122A 399.OO0,00 106.581.986,03 wheel Loader (E15) Jm 0,o085 L,a92t 295.500,00 559.12 1,35 ump Truck bulm o,oooa o,1725 15.434.900,00 2.661.835,49 Motor Grader {E l3l Jm 0,0040 0,8904 688.900,00 613.402,93 Tmdem (El7l Jm o,ol l2 2,4931 400.100,00 997.507,66 water Tanker (E23) Jam 0,034r 7,5907 308.900,00 2.344.779,21 l1 3.3.(1) lm2 Penyiapan Badan Jalan 4.400,0000 Pekeda (L0l) hili o,0005 2,163a 90.000,oo 194.738,t4 Mandor (L031 htri 0,0002 1,0819 145.000,oo 156.872,39 Motor Grader (E13) Jam o,0017 7,4800 688.900,00 5.t52.972,W Tandem / Vibro Roller (E171 Jam o,0244 107,3600 400. l00,oo 42.954.736,OO 12 s. r.( I) 1m3 Iapis Pondasi Agregat Kelas A 330,0000 Pekerja (Lol) hari o,0111 3,6630 90.000,00 329.670,00 Mandor (L03) hafi 0,0014 o,4620 14s.000,00 66.990,00 Agregat A M26 M3 1,2890 425,3700 494.OO0,00 2to.132.780,OO wheel lrader (E1s) JM o,0087 2,A7tO 29s.500,oo 848.391,70 )ump Truck (E0e) bulan 0,0013 0,4 188 15.434.900,00 6.464.75A,28 Motor Orader (El3) jam 0,0009 0,3045 688.900,OO 209.743,24 vibmtory Roller (El9al Jm o,oo97 3,2133 544.700,00 t.750.275,89 l3 6.1 (rl I liter Lapis Resp Pengikat - Aspal Cair/Emulsi l.320,oooo Pekefa (LOU hari 0,0002 0,2640 90.000,00 23.760,OO Mandor (r,o3) hari 0,0001 0, l 320 145.000,00 I9.140,00 Aspal Emulsi CSS-1 (M3la) Liter t,7167 2.266,0440 16.900,00 38.296.143,60 Asp. Distributor/aspalt spmyer E41 Jam 0,0002 o,2640 15s.000,00 40.920,OO ompressor EO5 Jm o,o007 o,9240 343.300,O0 3t7.209,20 t4 6.t l2al I titer Lapis Perekat Ca.ir/Emulsi Aspal 990,OOO0 Pekerja (L0 1) hari 0,0002 0,1980 90.000,00 t7.820,OO Mandor (L03) hari o,oo01 0,0990 145.000,00 14.355,00 Aspal Emulsi CRS-l (M31a) Liter 1,7167 1 699,5330 16.900,00 28.722.1O7,70 Asp. Distributor E4l Jam o,ooo2 0,1980 3s l.863,00 69.664,47 Compressor EO5 Jm o,00lo 0,9900 343.300,00 339.867,00 Power Broom E03 Jm 0,0008 o,7920 15 6.3l7al 1 ton Laston Lapis Antan {AC-BC) 459,3600 Pekeda (mll hali 0,2410 I 10,6892 90.000,00 9.962.O24,1O Mandor (1031 hili o,o24r l r,0689 145.000,00 t.604.992,77 Agr Pch Mesin 5-10 & 10-20 (Me2l M3 o,3720 170,8610 527.000,00 90.043.768,08 ,gr Pch Mesin 0 - 5 (Mell M3 o,3719 170,8245 225.000,00 38.435.512,50 Semen (Ml2l ak 0, l9r8 56,6r00 88,0869 26.OO4,3696 300,00 16.900,00 .954.244,69 439.473.846,24 wheel lrader E15 Jam 0,0054 2,4663 295.500,00 728.802,27 AMP E0l Jm o,o24t 1 1,0689 9.788.900,00 108.352.508,53 Genset 812 Jam o,o241 I 1,0689 57.t42,86 632.509,47 Dump Truck E09 bulm 0,0006 o,2723 15.434.900,00 4.203.427,35 Asphalt Finisher EO2 Jam 0,0083 3,8030 380.800,00 1.448.169,82 Tandem Roller ElTa Jam 0,0084 3,8726 400.100,00 t.549.440,62 P.'IYre Roller El8 Jm 0,00s6 2,5527 534.200,00 1.363.639,76 Alat Bantu Ls 1,OO00 4s9,3600 16 6.3(6a) I ton Laston Lapis Aus (AC-WCI 382,8000 Pekerja (10 1) hari o,0287 10,9825 90.000,00 988.427,48 Mandor (103) hari o,oo29 I, I 101 145.000,00 160.967,40 Agr Pch Mesin 5-10 & f0-15 (M921 M3 0,3206 122,7t35 527.000,00 64.670.014,50 Agr Pch Mesin 0 - 5 (M9l) M3 0,4193 160,5020 225.O00,O0 36. l 12.938,75 Scmen (Ml2l ak 0,1936 74,t254 90.300,00 6.693.522,90 Aspal (Ml0l Ks 62,3150 23.854,t820 16.900,00 403.135.675,80 Wheel lrader El5 Jm 0,0054 2,O553 295.500,00 607.335,22 AMP E0l Jam 0,0201 7,6867 9.788.900,00 75.244.797,59 Genset Et2 Jam o,0201 7,6467 57.t42,86 439.242,69 Dump Truck E09 bulan 0,0004 o,t42a 1s.434.900,00 2.203.957,53 Asp. Finisher EO2 Jam o,ol25 4,7952 380.800,00 r.826.O21,99 Tandem Roller ElTa Jam o,ol28 4,8831 400.100,00 1.953.716,07 P. Tyre Roller El8 Jam 0,0084 3,218? 534.200,00 1.719.436,60 17 7.1 lTal 1m3 Beton strukur, fczo MPa r65,0000 ekeda (Lo 1) hili 0,4590 75,7315 90.000,00 6.815.834,77 Tukang (w2l hari 0,6885 113,5972 130.000,00 t4.767.642,00 Mandor (103) hari 0,0574 9,4664 145.000,00 1.372.633,39 Semen (M12) ak 5,4590 900,7350 90.300,oo 81.336.370,50 Pasir Beton M01a M3 o,6343 104,6669 413.000,00 43.227.428,28 Agregat Kasar M3 o,7922 130,7 14 I 512.000,oo 66.92s.63A,62 Kalru Perancah lmbr 4,4444 733,3333 40.r00,00 29.406.666,67 Paku Kg 0,2305 34,0292 30.600,00 r.163.693,s2 Air Ltr 190,5500 31.440,7500 7,80 245.237,85 Plastizier Kg 0,8 189 135, r 103 69.400,00 9.376.651,35 4 ASB Konstruksi Jalan dan Jembatan - Halaman 65 AsDal (Mlol KS NO. KODE URAIAIT KODE SATUAIf KOEFIAIEf, AXALISA VOLI'fE IIARGA AATT'AIT (Rpl JT'UIAH IIAR,GA lRpl I 2 3 4 5 6 7 8 9 Concrete Mixer lm 0,4016 66,265t 86.400,00 5.725.30r,20 Concrete Vibmtor jam 2,4096 397,5904 6 1.300,00 24.372.2A9,16 Water TmKIruck lE23l JM o,o3E2 6,2952 308.900,oo 1.944.58 r,33 18 7.9.(Ll lm3 esangm Batu 544,5000 Pekeda Bias (Lol) hari 0,4s90 249,9177 90.000,00 22.492.594,93 Tukang (r,o2l hili o,t147 62,4775 130.000,00 8.r22.O73,14 Mmdor hari o,o574 31,2387 145.000,00 4.529.617,7 | Batu Kali (M02) M3 1,0238 557,4319 231.O00,OO 128.766.763,13 Semen (PC) (M12) nk 3,4600 1.883,9700 90.300,oo t70.122.491,OO Pasir MOla M3 o,4562 244,4047 4l3.OOO,OO 1O2.591.t22,59 Conc. Mixer (E06) jam o,4016 214,6747 86.400,00 18.893.493,98 water Tmker (E23) Jm 0,ool4 o,7654 308.900,00 236.420,t5 t9 e.2.(s) I buah Patok Pengarah 146,OOOO Pekerja Bias (1011 hili 0,1795 26,2096 90.000,00 2.358.467,47 Tukang (w2l hari 0,0239 3,4946 r30.000,00 4s4.300,40 Mmdor (ro3) hari 0,0120 1,7473 145.O00,00 253.359,84 Beton fc 20 Mpa M186) M3 0,0338 4,9275 1.654.0I9,26 8.150.179,90 Baja Tulmgm (Ms7al btnc o,7260 105,992 I 15.098,00 1.600.268,O3 Cat Im42l Ks, 0,1000 14,6000 78.300,OO 1.143. 180,00 Dump Truck EOE bulm o,0005 o,0672 15.434.900,00 1.O37.290,13 .rrmlah Totd 4.069.t4{).O92,04 PeEbuletu 4.069.ErtO.OOO,OO
2.Penlagkatan/Rehabllltasi Jalaa Lebar 4 Meter (Datarl Satuan: Km NO. KODE T'RAIAN KODE SATUAII KOEFISIEIT AITALIAA voLuuE IIAROA SATUAI| (npl JT'UIAH IIARGA lRPl 1 2 3 4 5 6 7 t 9 I 1.2 lLs Mobilisasi r,0000 I,0000 Sewa Direksi 14ssg + gudang (swa stand) m2 56,0000 56,0000 4l.700,00 2.335.200,00 Demobilisasi ls 0,3000 o,3000 623.040,00 lE6.9l2,OO Mobilisasi alat (swa truck dobel) E06 ls l,oo00 1,0000 6.230.400,00 6.230.400,00 2 1.8.I lLs Manajemen dm Keslmatm IiIu Lintas 1,0000 l,oooo Pekerja (Flagmml OH 130,0000 143,OO00 90.ooo,o0 9.295.000,00 Kmrdinator / Pengatur OK 90.000,00 3 l.u.llal lbh Pengujian PH buah 9,0000 9,0000 74.000,o0 666.OOO,00 4 1,19 lLs Ke slamatan dan Kesehatan Kefa 1,0000 1,0000 Penlapan RKK (biaya jilid) ls 1,0000 1,0000 10.400,00 10.400,00 Personel K3 Konstruksi bulan 5,0000 5,0000 5.132.750,00 25.663.750,00 Fasilitas sarana keshatan ls r,0000 r,0000 sepatu boot keda buah 15,0000 1s,0000 162.000,00 2.430.000,00 topi proyek buah 15,0000 15,0000 193.000,00 2.895.000,00 sarung tangm buah 15,0000 15,0000 30.100,00 451.500,00 masker pemafasm par 2,0000 2,0000 40.500,00 8l.000,00 5 r,2t lLs Mmajemen Mutu 1,0000 1,0000 I2poran Kendali Mutu (biaya iilidl unit 4,OOO0 4,OOO0 50.400,oo 201.600,00 6 2.3.(1s) 1m' Gomn8-gorong Kotak Beton Bertulmg, ukuran dalam 100 cm x 1O0 cm 26,4000 Pekeda LOI htri 0,0410 L,OA24 90.000,00 97.4t6,OO Tukang hri o,0246 o,6494 130.000,00 a4.427,20 Mandor lr3 hri 0,0041 0,1082 145.000,00 15.694,80 Beton 30 Mpa M3 o,4622 12,2021 3.574.294,49 43.6t3.427,35 Baja Tulangan (M3e) btg 7,2633 t9t,7523 15.098,00 2.495.O75,49 pasir urug (EI- 24tl M3 o,2940 7,7616 269.000,00 2.Oa7.870,40 Mat. Pilihan M3 3,1400 82,8960 413.000,00 34.236.048,O0 Cetakan ukuran 100 x 100 bh/M' 1,0000 26,4000 3r3.500,00 8.276.400,OO Lantai Keda Fc' l0 mpa m47 m3 Jam 0,1300 3,4320 l.528.635,69 5.246.277,69 4.568.377,44 Flat Bed Truck ElI Jam o,o2a7 o,7577 470.000,oo 356.109,60 7 2.3..22]. 1m' Saluran berbentuk U Tipe DS I 1.100,0000 631,0700 90.000,00 TUkang [n2l hili o,2469 315,5900 130.000,00 41.026.700,N Mandor (LO3 hari 0,0574 63,1400 145.000,00 9.155.300,00 Semen (M121 ak o,9239 1.016,3010 90.300,o0 91.771.980,30 Pasir Beton (M0l) M3 0,0915 100,6500 413.000,00 41.568.450,00 , ASB Konstruksi Jalan dan Jembatan - Halaman 66 IM59} tM09l mrler 3.8540 1o1,7456 44.900,OO NO. KODE I'RAIAIT KODE AATUA.![ KOEFIAIEI{ AIfALISA VOLI'UE IIARGA AATUAII (Rpl r,I'ULIUI IIARGA (RPl t 2 3 4 5 6 7 t 9 Aggregat Kaw (Mo3) M3 o,1r92 13 1,1200 512.000,oo 67.133.440,O0 Fomworks (Mr95l M2 1,0000 l. ro0,oooo 313.500,00 344.850.000,00 Air Mr70) Ltr 27,7500 30.525,0000 7,AO 238.095,OO Lantai Keda Beton Fc' 10 mpa M47 m3 o,0600 66,OOOO 1.528.635,69 roo.889.955,50 Plastik Cor rcll o,o560 6l,6000 391.OOO,OO 24.085.600,OO Besi Beton (Ms7a) ke 26,7232 29.395,5243 15.O98,00 443.413.626,t5 Kawat b€ton Mr4) KS o,ol50 16,5000 30.100,00 496.650,00 Beton Mixer (E06) Jam 0,4016 441,7600 86.400,OO 38.168.064,OO Water Tanker E23l Jam 0,0557 61,2700 308.900,00 18.926.303,O0 Concrete Vibrator (E20) Jm o,4016 441,7600 61.300,00 27.O79.AAa,OO Exavator (E10) Jam o,0240 26,4000 712.300,00 18.804.720,00 I 3. 1.lrl 1m3 Galian Biasa 165,0000 Pekeda (Lo1) hari o,ool1 o,1815 90.000,oo 16.335,00 Mandor (Lo3) hari o,0006 o,0990 145.000,00 t4.355,00 Excavator Er0) Jm 0,oo38 o,6270 712.300,00 446.6t2,10 Dump Truck (Eoe) bulan 0,0007 0,r201 15.434.900,OO 1.854.096,16 9 3. 1.(e) 1m3 Galim Perkerasan berbutir 660,0000 Pekeda (L0rl hari 0,0060 3,9600 90.000,00 356.400,OO Mandor L03l hari 0,00 r0 0,6600 145.000,00 95.700,OO Exmvator (E1ol Jam 0,oo70 4,620,0 712.300,OO 3.290.826,OO Dump Truck EO9l bulan 0,o008 o,4972 r5.434.900,00 7.673.859,t3 10 3.2.12a) lm3 Timbunan Pilihan dari sumber galian 247,2264 Pekerja (Lol) hari 0,o023 0,5686 90.000,00 5l.175,87 Mandor LO3) hili o,0006 0, I483 145.000,00 21.508,70 Bahan pilihan uruS (Mo9l/pasir (Ml6) M3 1,2000 296,6717 399.O00,00 Lta372.OO2,7t wheel l-ader (Elsl Jam o,oo85 2,1014 295.500,OO 620.970,92 )ump Truck (Eoe) bulan o,0008 0,1915 15.434.900,OO 2.956.285,67 Motor Grader (E13) Jam o,0040 0,9889 688.900,00 6A1.257,O8 Tandem (E17) Jam o,0l l2 2,7649 400.100,00 1.107.851, l9 Water Tanker lB23l Jm o,0341 8,4304 308.900,00 2.604.156,86 l1 3.3.(r) lm2 Penyiapan Badm Jalan 5.500,ooo0 Pekerja (L0 l) hari 0,0005 2,7047 90.000,00 243.422,67 Mandor (103) hari 0,0002 r,3523 145.000,00 196.090,48 Motor Grader (E13) Jam 0,00r7 9,3500 688.900,00 6.441.2t5,OO Tandem / vibro Roller (El7) Jam o,0244 134,2000 400.100,00 53.693.420,00 t2 s.1.(ll Im3 Lapis Pondasi Agregat Kelas A 440,0000 Pekeda (Lo1) hari o,ol 1I 4,8840 90.o00,oo 439.560,00 Mandor LO3) hari 0,0014 0,6160 145.000,o0 89.320,OO Agregat A M26 M3 t,2490 567,1600 494.000,oo 280.177.O40,OO wheet Loader (Ersl jam 0,0087 3,828r 295.500,00 l. r31.188,93 Dump Truck (Eoe) bulan 0,0013 0,5585 15.434.900,00 4.619.677,70 Motor Grader (E131 Jam 0,0009 0,4059 688.900,00 279.657,66 Vibratory Roller (E19a) jam o,oo97 4,2844 544.700,00 2.333.70 1,18 t3 6. l (11 I liter Lapis Resap Pengikat - Aspal cair/Emulsi l.760,0000 Peke{a (1011 hari o,ooo2 0,3520 90.000,00 31.680,OO Mandor (Lo3) hili 0,000r o,t760 145.000,oo 25.520,OO Aspal Emulsi CSS-1 (M3la) Liter 1,7167 3.O21,3920 16.900,OO 51.061.524,80 Asp. Distributor/aspalt spmyer E4l Jm o,0002 o,3520 155.OO0,00 54.560,OO Compressor EO5 Jm 0,0007 t,2320 343.300,00 422.945,60 L4 6.1 l2^l I liter Lapis Perekat Cair/Emulsi Aspal 1.320,0000 Pekeia (L0 1) hari o,o002 o,2640 90.o00,00 23.760,OO Mandor (103) hari 0,0001 o,1 320 145.000,00 19.140,00 Aspal Emulsi CRS-I [M31a) Liter 1,7167 2.266,0440 16.900,00 38.296.143,60 Asp. Distributor E4t Jam 0,0002 o,2640 351.863,00 92.891,83 Compressor E05 Jam 0,00r0 1,3200 343.300,00 453.156,00 Power Broom EO3 Jam 0,0008 1,0560 15 6.3l7al I ton l^aston Lapis Antara (AC-BC) 612,4800 Pekeia (L0 l) hari o,24to 147,5855 90.000,o0 13.282.698,80 Mandor (Lo3l hari o,o24l A,75A6 145.000,o0 2. r39.990,36 gr Pch Mesin 5-10 & 10-20 M3 o,3720 227,8t47 527.000,00 120.058.357,44 Agr Pch Mesin 0 - 5 (Me1) M3 o,3719 227,7660 22s.000,00 51.247.350,00 Semen (M12) zak 0,1918 r17,4492 90.300,00 10.605.6s9,58 .spd (Ml0l Kg 56,6100 34.672,4924 16.900,00 585.965.128,32 wheel loader E15 Jam 0,0054 3,2884 295.500,00 97r.736,36 AMP E0l Jm o,o24l 14,7586 9.788.900,00 144.470.O11,37 Genset 812 Jam o,o24l 14,7586 57.142,86 843.345,96 Dump Truck E09 bulam 0,0006 0,3631 15.434.900,00 5.604.569,81 Asphalt Finisher EO2 Jam 0,0083 5,0706 380.800,00 1.930.893, l0 Tandem Roller ElTa Jam 0,0084 5, r635 400.100,00 2.065.920,83 P. Tyre Roller E18 Jam 0,0056 3,4036 534.200,00 1.818.186,35 Alat Bantu Ls 1,0000 612,4800 E ASB Konstruksi Jalan dan Jembatan - Halaman 67 NO. KODE T'RAIAX KODE AATUAIT KOETIAITN AITALISA VOLI'UE HARGA AATUAIT (RPl JI'ULIIH HAROA (Rpl 1 2 3 4 5 6 7 t 9 16 6.3(6a) 1 ton Laston Lapis Aus (AC-WC) 5 10,4000 Pekerja (r,o1) hari o,o2a7 14,6434 90.o00,00 1.3r7.903,84 Mmdor (LO3) hari o,oo29 L,4aO2 r45.OOO,00 2t4.623,20 Asr Pch Mesin 5-10 & 1O-15 (M921 M3 o,3206 163,6 laO 527.OOO,O0 46.226.686,OO Agr Pch Mesin O - 5 (M9l) M3 o,4193 2r4,0,026 225.OO0,00 48.150.585,00 Semen (Ml2) zok 0,1936 98,8339 90.300,o0 4.924.697,20 Aspal Mr0l Ke 62,3 I 50 3r.805,5760 16.900,00 537.514.234,40 Wheel Loader E15 Jam 0,0054 2,7404 295.500,00 809.780,30 AMP EOl Jm 0,o201 to,2490 9.788.900,OO 1OO.326.396,79 Genset Et2 Jm 0,0201 to,2490 57.t42,86 585.656,91 Dump Truck E09 bulan 0,0004 0,1904 15.434.900,OO 2.938.6 10,O4 Asp. Finisher EO2 Jam 0,0125 6,3936 380.800,oo 2.434.695,99 Tandem Roller E17a Jm 0,0128 6,5108 400.100,oo 2.604.954,75 P. Tyre Roller E18 Jm 0,0084 4,29t6 534.200,O0 2.292.582,r4 17 7.1 (7al lm3 Beton strukur, fc2o MPa 165,OO00 Pekeda (Lo1l htri 0,4590 75,73t5 90.000,00 6.4t5.834,77 Tukang lw2l hari 0,6885 1t3,s972 130.OOO,O0 14.767.642,00 Mandor (ro3l hari 0,0574 9,4664 145.OOO,OO r.372.633,39 S€men (Ml2) zak 5,4590 900,7350 90.300,00 81.336.370,50 Pasir Beton (M01a) M3 0,6343 ro4,6669 413.OO0,OO 43.227.42a,2A Aeregat Kasar M3 o,7922 130,7 t4 t 512.000,00 66.925.638,62 lkyu Perancah lmbr 4,4444 733,3333 40.1o0,00 29.406.666,67 Paku KC o,2305 38,0292 30.600,oo 1. 163.693,52 Air Ltr 190,5500 31.440,7500 7,80 245.237,45 Plastizier KC o,E 189 135, I 103 69.400,OO 9.376.651,3s Concrete Mixer (E061 Jam o,4016 66,265r 86.400,00 5.725.301,20 Concrete Vibrator jam 2,4096 397,5904 61.300,00 24.372.289,t6 water Tml(Iruck (E23) jm 0,0382 6,2952 308.900,00 1.944.581,33 18 7.9.l.1l' 1m3 Pasangan Batu 605,0000 Pekerja Biasa (L01) hari 0,4590 277,6464 90.000,00 24.991.772,t4 Tukaag (wzl hili o,tt47 69,4t94 130.000,00 9.O24.525,71 Mandor (Lo3) hili 0,0574 34,7097 l45.OO0,OO s.032.908,57 Batu Kdi (M02) M3 1,0238 619,3688 231.OO0,00 143.O74.18t,25 Semen (PC) (M12) zz.k 3,4600 2.093,3000 90.300,00 t89.024.990,OO Pasir (M01a) M3 o,4562 276,OO52 413.000,00 I 13.990.136,2 1 Conc. Mixer (Eo6) jam 0,4016 242,9719 86.400,00 20.992.771,O8 Water Tanker iam 0,0014 0,8504 308.900,00 262.649,06 18 e.2.(r) 1m2 Marka Jalan Termoplastik 79,20,0,0 Pekerja Tukmg (Lorl hari o,0204 r,6156 90.ooo,00 145.404,48 Mmdor (Lo3l hari 0,0025 o,2020 145.000,00 29.242,8s Cat Mtrka Thermoplastic (Ml7b) Kg 0,0339 2,6818 34.600,00 92.789,54 Glass Bead (M34) Ks 0,4635 36,7092 I18.000,00 4.331.685,60 Dump Truck (E08) bulam o,0001 o,0078 15.434.900,00 r 19.888,01 Themoplastic Road Milking Machin€ (E8s) Jam o,0178 1,4137 19 e.2.(sl I buah Patok Pengarah 183,0000 Pekerja Biasa (L0ll hari 0, l79s 32,8s l8 90.000,00 2.956.662,65 Tukmg lw2l hari o,0239 4,3802 130.000,00 569.431,33 Mandor (103) hari 0,0120 2,190 I 145.000,00 3t7 .567,47 Beton fc 20 Mpa (M186) M3 o,o338 6,1763 l.654.019,26 10.215.636,45 BajaTulangm (Ms7a) btng o,7260 132,853 t 15.098,00 2.00s.815,41 Cat lm42l Kc 0, r000 18,3000 78.300,00 1.432.890,00 Dump Truck E08 bulan 0,000s o,oa42 15.434.900,00 1.300.165,02 Jn6r.f, Totd 4.612.9t1.O35,69 PcEbulrtu 4.612.9E1.qx),q)
3.Penlagkataa/Rehabllltacl Jalan Lebar 5 Meter lDatarl Satuaa: Km l{o. KODE URAIAII KODE SATUAIT KOEFIAIEf, AXALIAA VOLT'UE IIARGA SATUAIT lRpl JI'UL,AIT IIARGA (RPI I 2 3 4 5 6 7 8 9 I 1.2 lLs Mobilisasi r,0000 1,0000 Sewa Direksi 116s1 + gudang (swa stand) m2 56,0000 s6,0000 41.700,00 2.335.200,00 Demobitisasi ls o,3000 0,3000 623.040,00 186.912,00 Mobilisasi alat (sewa truck dobel) E06 ls r,0000 1,0000 6.230.400,00 6.230.400,00 2 1.8.1 lLs Manajemen dan Keselamatan Lalu Lintas 1,0000 1,0000 Pekerja (Flagman) OH 130,0000 r43,0000 90.oo0,oo 9.295.000,00 Koordinator / Pengatur OK 90.000,o0 3 l. 17.{ la) tbh Pengujian PH buah 9,0000 9,0000 74.000,00 666.000,00 q ASB Konstruksi Jalan dan Jembatan - Halaman 68 tw2t hari 0,o025 o,2020 l30.ooo.oo 26.253,59 NO. KODE I'RAIAIT KODE AATUAX KOEFIAlEIt ATALIAA VOLI'UE HARCA AAIUAII lRPl JI'ULAIT HAROA lRpl 1 2 3 4 5 6 7 a 9 4 I,l9 lLs Keselamatan dm Keshatm Keda l,OOOO l,oo00 enyiapm RKK (biaya jilid) ls r,oo00 r,0000 44.700,OO 44.700,OO Per$nel K3 Konstruksi bulm s,0000 5,0000 5.1 32.750,O0 25.663.750,O0 Fasilitas sma keshata ls t,oooo 1,0000 39.400,00 39.400,OO spatu boot kerja buah l5,oo00 15,0000 162.000,00 2.430.000,00 topi proyek buah 1s,0000 15,OOOO 193.000,oo 2.89s.000,00 wung tangan buah lS,oooo 15,0000 30.100,00 451.500,00 masker pemafamn pak 2,0000 2,0000 40.500,00 81.000,00 5 1,2t lLs Manajemen Mutu r,0000 1,OOOO Lapom Kendali Mutu (biaya jilidl unit 4,OOOO 4,0000 50.400,o0 201.600,oo 6 2.3.( 1s) lm' Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x l0O cm 26,4000 Pekerja rol) hili 0,0410 1,0824 90.000,00 97.416,00 Tukang (102) hari o,0246 o,6494 130.000,00 84.427,20 Mandor L03) hari 0,0041 0,1082 145.000,00 r5.694,80 Beton 30 Mpa (Ms9) M3 o,4622 t2,2021 3.574.294,49 43.613.827,35 Baja Tulangm M39) bts 7,2633 t9t,7s23 l5.098,OO 2.495.O75,49 pasir urug (EI. 24rl M3 o,2940 7,76t6 269.OO0,00 2.O87.870,40 Mat. Pilihan (M09) M3 3,1400 82,A960 413.000,00 34.236.048,00 Cetakm ukuran 100 x 100 bh/M' 1,0000 26,4000 313.500,00 a.276.4@,OO Lantai Kerja Fc' 10 mpa m47 m3 0, 1300 3,4320 1.528.635,69 5.246.277,69 Tamper (E2s) Jm 3,8540 l0 1,7456 44.900,O0 4.564377,44 Flat Bed Truck (E11) Jm o,o2a7 o,7577 470.OOO,O0 356.109,60 2.3..22], 1m' SaluEn berbentuk U Tipe DS 1 1.100,0000 Pekerja (Lol) hari o,5737 631,0700 90.000,@ 56.796.300,00 Tukmg w2l had o,2869 3 I 5,5900 130.000,00 4t.026.700,oo Mandor (Lo3l hari 0,0574 63,1400 145.000,00 9. I 55.300,00 Semen (M12) zok o,9239 1.016,30r0 90.300,00 91.771.980,30 Pasir Beton (M0l) M3 0,09r5 100,6500 413.000,00 4 1.568.450,00 Aggregat Kasr (M03) M3 o,t192 13 1,1 200 5 12.000,00 67.133.440,00 Fomworks (M1es) M2 1,0000 l. 100,oo00 313.500,oo 344.850.OOO,00 Air M 170) Ltr 27,7500 30.525,O000 7,80 238.095,00 tantai Ke{a Beton Fc' lO mpa M47 m3 0,0600 66,OOO0 1.528.635,69 100.E89.955,50 Plastik Cor roll 0,0560 61,6000 391.000,00 24.085.600,00 Besi Beton lMsTa) kc 26,7232 29.395,5243 15.098,00 443.813.626, l5 Kawat beton (M14) Kg 0,0150 16,5000 30.100,00 496.650,00 Beton Mixer (Eo6) Jam 0,4016 441,7600 86.400,OO 38.168.064,O0 Water Tanker 823) Jm 0,o557 61,2700 308.900,00 r8.926.303,00 Concrete Vibmtor (E20) Jam 0,4016 44t,7600 6l.300,00 27.O79.AAA,OO Exavator El0) lam o,0240 26,4000 7 12.300,00 18.804.720,00 8 3. 1.(r) 1m3 Galian Biae r65,0000 Pekerja (L0ll hri 0,001I o, l8 15 90.000,00 16.335,00 Mandor (LO3) htri 0,0006 o,0990 145.000,o0 14.355,OO Excavator (E101 Jam 0,0038 o,6270 712.300,00 446.612,tO Dump Truck (E091 bulan 0,0007 0,1 20 1 15.434.900,00 1.854.096, l6 9 3.1.(e) 1m3 Oalian Perkerasan berbutir 825,0000 Pekeia (10 1) hari 0,0060 4,9500 90.000,00 445.500,00 Mandor (103) hari 0,0010 0,8250 145.000,oo 119.625,00 Excavator {El0) Jam 0,0070 5,7750 7 12.300,00 4. r r3.532,50 rump Truck (E09) bulan 0,0008 o,6215 15.434.900,00 9.592.323,9r lo 3.2.12a], 1m3 Timbunan Pitihm dili sumber galim 247,4325 Pekerja (1011 hari o,0023 0,5691 90.000,00 51.218,53 Mandor Lo3l hari 0,0006 0,1485 145.000,00 21.526,63 Bahan pilihan urug (M091/pasir (M161 M3 1,2000 296,9190 399.000,00 t18.470.693,93 Wheel Loader (E1s) Jam o,00E5 2,to32 295.500,00 62r.488,65 Dump Truck (Eoe) bulm o,0008 o,1917 15.434.900,OO 2.958.750,44 Motor Grader (E13) Jam 0,0040 o,9497 688.900,00 68r.825,O7 Tandem (E17) Jm o,0l l2 2,77t2 400.100,oo l. 108.774,85 Water Tanker (E23) Jam o,o341 4,4374 308.900,00 2.606.328,05 11 3.3.(11 lm2 Penyiapan Badm Ja.lm 6.600,0000 Pekerja (LOl) htri 0,0005 3,2456 90.000,00 292.tO7,20 Mandor (Lo3) hari 0,0002 1,6228 145.000,00 235.308,58 Motor Grader (El3) Jarn 0,0017 1r,2200 688.900,00 7.729.458,OO Tandem / vibro Roller E17) Jam o,o244 161,0400 400.100,00 64.432.tO4,OO 12 s. l.(ll 1m3 Lapis Pondasi Agregat Kelas A 550,0000 Pekeda (Lo1l hari 0,0rIt 6,1050 90.000,00 549.450,00 Mandor (rr3) htri o,0014 o,7700 145.000,00 l11.650,00 Agegat A M26 M3 1,2890 708,9500 494.000,00 350.221.300,00 f ASB Konstruksi Jalan dan Jembatan - Halaman 69 NO. KODE URAIAIT KODE AATUAIT KOETISTEIT AITALIAA VOLI'UE HARGA AATUAIT (Rpl JI'MLAH IIARGA lRpl I 2 3 4 5 6 7 t 9 Wheel t ader (Elsl jm 0,oo87 4,7451 295.500,OO r.413.986,17 Dump Truck (EOe) bulm o,ool3 o,69a1 15.434.900,OO to.774.597,13 Motor Gmder lm o,0009 o,5074 688.900,OO 349.572,O7 Vibratory Roller (E I 9a) lm o,oo97 5,3555 544.700,OO 2.917.126,4a l3 6.1 (r) I liter Lapis Reep Pengikat - Aspal Cair/Emulsi 2.200,oooo Pekeda (L0ll hari 0,0002 o,4400 90.o00,00 39.600,00 Mmdor (L03) hari 0,0001 o,2200 145.O00,oo 31.900,oo Aspal Emulsi CSS-I (M3la) Liter t,7167 3.776,7400 16.900,00 63.826.906,00 Asp. Distributor/aspalt sprayer E4l Jam 0,ooo2 o,4400 15s.000,00 68.200,00 Compressor E05 Jam 0,0007 1,5400 343.300,00 528.682,00 14 6.t (2al 1 liter Lapis Perekat Cair/Emulsi Aspal 1.650,OO00 Pekeda (L0ll hari o,ooo2 o,3300 90.000,00 29.70,0,OO Mandor r,o3) hari 0,0001 0, l6s0 r45.000,oo 23.925,OO Aspal Emulsi CRS-l (M31al Liter t,7 167 2.832,5550 16.900,00 47.870.179,50 Asp. Distributor E4t Jam o,0002 0,3300 351.863,OO 116.1t4,79 Compressr E05 Jam 0,0010 1,6500 343.300,00 566.445,00 Power Broom E03 Jm 0,0008 1,3200 15 6.3(7a) 1 ton Laston Lapis Antara (AC-BCI 765,6000 Pekeia (L011 hari o,2410 184,48 19 90.ooo,00 16.603.373,49 Mandor (r,03) hari o,o241 t8,4482 145.000,00 2.674.987,95 Agr Pch Mesin 5-1O & 10-20 (Me2) M3 o,3720 244,7644 527.OOO,OO r50.072.946,80 Agr Pch Mesin O - 5 (M9ll M3 o,3719 2A4,7075 225.000,00 64.059.187,50 Semen (M121 zak 0,1918 146,81 l5 90.300,oo 13.257.O74,48 Aspal (Mlo) Kg 56,6 100 43.340,6160 16.900,00 732.456.4tO,40 Wheel loader E15 Jam 0,0054 4,1 106 295.500,00 1.2t4.670,4s AMP E0l Jam o,o24l 18,4482 9.788.900,00 180.587.514,22 Genset Et2 Jm o,o241 t8,4482 57.t42,86 1.O54.182,44 Dump Truck EO9 bulan 0,0006 0,4539 15.434.900,OO 7.OO5.712,26 Aspha.lt Finisher EO2 Jam 0,oo83 6,3383 380.800,00 2.4t3.616,37 Tandem Rotter E 17a Jam 0,0084 6,4544 400.100,00 2.582.401,O3 P. Tyre Roller El8 Jam 0,0056 4,2545 534.200,00 2.272.732,94 Alat Bantu Ls 1,0000 765,6000 16 6.3(6a) 1 ton taston Lapis Aus (AC-WC) 638,0000 Pekerja (L0l) hari o,o2a7 18,3042 90.000,00 t.647.379,4O Mandor (L031 hari 0,0029 1,8502 145.000,oo 264.279,OO Agr Pch Mesin 5-10 & 10-15 (M92) M3 o,320,6 204,5225 527.O00,00 107.783.357,50 AgI Pch Mesin 0 - 5 M91) M3 0,4 t 93 267,5033 225.000,00 60.188.23 l,2s Semen (Ml2) uk 0,1936 123,5423 90.300,00 I 1.155.871,50 rsPal (M10) Kg 62,3150 39.756,9700 16.900,o0 67r.892.793,OO wheel lrader El5 Jam 0,0054 3,4255 29s.s00,00 1.Ot2.225,37 AMP E0l Jam 0,0201 t2,8tt2 9.788.900,O0 t25.407.995,94 Genst Et2 Jam 0,0201 t2,al12 57.t42,86 732.O7 t,t4 Dump Truck E09 bulan 0,0004 0,2380 15.434.900,OO 3.673.262,55 isp. Finisher EOz Jam 0,0125 7,9920 380.800,oo 3.043.369,99 Tandem Roller ElTa Jam o,0l2E 8,1384 400. l00,oo 3.256.193,44 P. Tyre Roller E18 Jam 0,0084 5,3645 534.200,00 2.865.727,67 7.1 lTal 1m3 Beton strukur, fc20 MPa 165,OO00 Peke{a (Loll hari 0,4590 75,7315 90.000,00 6.A15.834,77 tukmg lw2l hari 0,688s 113,5972 130.000,00 4.' Mandor (Lo3) hari o,o574 9,4664 145.000,00 1.372.633,39 Semen (M12) zak 5,4590 900,7350 90.300,00 81.336.370,50 Pasir Beton (M0la) M3 0,6343 to4,6669 413.000,oo 43.227.428,24 ,gregat Kasar M3 o,7922 130,7141 5r2.000,00 66.925.638,62 Kayu Perancah lmbr 4,4444 733,3333 40.1o0,00 29.406.666,67 Paku Kg 0,230s 38,0292 30.600,00 1.163.693,52 Air Ltr 190,5500 3 1.440,7500 7,AO 245.237,85 Plastizier Ks 0,8 r89 135,1 103 69.400,00 9.376.651,35 Concrete Mixer E06l jam 0,4016 66,2651 86.400,00 Concrete vibrator Water TankTruck jam 2,4096 397,5904 1.300,00 308.900,00 24.372.249,16 I l8 7.9.(1) Im3 Pasangan Batu 605,0000 Pekerja Biasa hari 0,4590 o,ll47 277,6864 t94 90.000,00 24.991.772,14 Mandor (Lo3l hari 0,o574 34,7097 145.000,oo ,908,s7 Batu Kali Semen (rc) (M021 (Ml2) M3 1,0238 3,4600 619,3688 231.000,oo I l r3.990.I I Conc. Mixer (E06) M3 Jarn 0,4016 242,9719 86.400,OO 20.992.77t,O8 Water Tanker (823) jam 0,0014 0,8504 308. 18 9.2.lrl lm2 Marka Biasa hari 79,2000 l,6156 o,2020 90.000,oo 145.404,48 (M17b) hari KC 0,0025 0,0339 o,2020 2,68t8 145.000,00 34.600,00 29.282,85 92.789,54 4 ASB Konstruksi Jalan dan Jembatan - Halaman 70 lam 0,0382 6,2952 r43.O74.Lal,25 Iukang Mandor Cat Marka Thermoplastic NO. KODE T'RAIAN KODE SATUAIT KOETIAIEtt AITALIAA VOLIIIE IIARCA AATUAX (Rpl .,I'[LAH HAROA lRpl 1 2 3 4 5 6 7 t 9 Glass Bead Ks o,4635 36,7092 1 18.000,00 4.331.685,60 Dump Truck (E08) bulm o,0001 0,0078 15.434.900,OO 1I9.888,01 Themoplastic Road Mtrking Machine (E8s) Jm o,0178 1,4137 19 e.2.(s) 1 buah Patok Pengdah 183,0000 Pekerja Bias LOl) hili o,1 795 32,8s18 90.o00,oo 2.956.662,65 Tukang lw2l hari o,o239 4,3802 130.000,00 569.431,33 Mandor (LO3) hari 0,0120 2,1901 145.000,00 317.567,47 Beton fc 20 Mpa (Mr86) M3 0,0338 6,t763 1.654.O19,26 10.2 15.636,45 Baja Tulangan (M57a) btng o,7260 132,853 I 15.098,00 2.005.815,41 Cat lma2l Kg 0,1000 18,3000 78.300,00 1.432.890,00 Dump Truck E08 bulan 0,ooo5 o,0842 15.434.900,00 1.300. r6s,o2 JuDhh Tot.l 5.157.rs3.34E,27 PcEbulrtu 5.157.8s3.(xx),OO
4.Peoiagkataa/Rehabllltasl Jalaa Lebar 6 Meter (Datarf Satuaa: Km ilo. KODE T'RAIAIT KODE AATUAIT KOErISIEII AIIALISA voLt uE HARGA AATUAIT (Rpl JI'ULIUI IIAROA lRPl 1 2 3 4 5 6 7 t 9 I t.2 ILs Mobilissi 1,0000 1,0000 Sewa Direksi 14661 + gudang (sewa stand) m2 s6,0000 56,0000 41.700,00 2.335.200,00 Demobilisasi ls 0,3000 0,3000 623.040,00 186.912,00 Mobilissi alat (swa truck dobel) E06 ls l,oo00 l,oooo 6.230.40O,OO 6.230.400,OO 2 1.8.1 lLs Manajemen dan Keselamatan talu Lintas l,oooo 1,0000 Pekerja (Flagman) OH 130,0000 143,0000 90.000,00 9.295.000,00 Koordinator / Pengatur OK 90.000,00 3 1. I7.(1al 1bh Pengujian PH buah 9,0000 9,OOOO 74.OOO,00 666.000,o0 4 1,19 lLs Keselamatan dan Kesehatan Kerja 1,0000 1,0000 Penyiapm RKK (biaya jilidl ls 1,0000 1,0000 44.700,00 44.700,00 Personel K3 Konstruksi bulan 5,0000 5,0000 5.132.750,00 25.663.750,00 Fasilitas sarana kesehatan ls 1,0000 1,0000 39.400,00 39.400,OO sepatu boot keda buah 15,0000 15,0000 162.000,00 2.430.000,00 topi proyek buah 1s,0000 1s,0000 193.000,00 2.895.000,00 sarung tangan buah 15,OOO0 15,OO00 30.100,oo 451.500,00 msker pemafasan pak 2,0000 2,0000 40.500,00 81.000,00 5 t,2l lLs Manajemen Mutu 1,0000 r,0000 l,apom Kendali Mutu (biaya jilid) unit 4,0000 4,0000 50.400,0o 20r.600,o0 6 2.3.( ls) lm' Gorong-torcng Kotak Beton Bertulang, ukuran dalam 1O0 cm x lOO cm 26,40,00 Pekerja (Lol) hili 0,0410 t,oa24 90.000,o0 97.4t6,@ Tukang lw2l hari o,0246 o,6494 130.000,00 84.427,20 Mandor (103) hari 0,0041 0,1082 145.000,00 15.694,80 Beton 30 Mpa (Msel M3 o,4622 t2,2021 3.574.294,49 43.613.827,35 Baja Tulangan (M3e) btg 7,2633 r91,7523 r5.098,OO pasir urug (EI. 24tl M3 o,2940 7,7616 .870,40 Mat. Pilihm M09) M3 3,1400 82,8960 413.000,oo 34.236.048,OO Cetakan ukuran 100 x 1OO bh/M' 1,0000 26,4000 313.500,00 lantai Keia Fc' l0 mpa m47 m3 0, t 300 3,4320 1.s28.635,69 5.246.277 amper (E2sl Jam 3,8540 101,7456 44.900,o0 Flat Bed Truck (E11) Jam o,o2a7 o,7577 356. 7 1m' Salurm berbentuk U TiPe DS I l. r00,0000 Pekerja L,0l) hari o,5737 631,0700 90.000,00 Tukang Mandor hari o,2a69 3 r5,5900 130.000,00 41.026.700,00 9.1 Semen (Ml2l zak o,9239 1.016,3010 90.300,00 91.771.980,30 Pasir Beton (Mol) M3 0,0915 100,6500 4l Aggregat Kasar M3 o,tt92 27,7500 ,7232 1 3 1,1 200 512.000,00 Ihwat beton Beton Mixer WaEr Tanker Concrete Vibmtor Exavator lrvr/ a, (M14) (E06) (E23) (E201 (El0l KC Jam Jam Jam jam o,0240 16,5000 - 441-?600 6r,2700 441,7600 26,4000 30.100,00 86.400,00 308.900,00 -613oo,oo 7 12.300,00 496.650,00 38.168.064,00 18.926.303,00 27.O79.AA8,OO 18.804.720,00 6 ASB Konstruksi Jalan dan Jembatan - Halaman 7l 269.000,oo 10 mpa Beton 67.133.440,00 344.850.000,00 -- ,38"09500 - loo€sr.g5s"so 24.085.600,00 443.813.626, l5 NO. KODE I'RAIAIT KODE AATUAN KOEFISIEN AITALIAA VOLTIUE IIARGA SATUAj! (RPl JI'ULIIH HARGA (RPl 1 2 3 4 5 6 7 a 9 8 3.1.(l) lm3 Galim Biasa 16s,0000 Pekeda (Lo1l hari o,oo11 o,18 l5 90.o00,o0 16.335,00 Mandor (LO3) hari o,ooo6 o,o990 145.000,00 14.355,00 Excavator (E r0) Jam o,0038 o,6270 7r2.300,00 446.6t2,1O Dump Truck {Eoe) bulan o,0007 o,1201 15.434.900,00 1.854.096, r6 9 3.1.(e) 1m3 Galian Perkemsm berbutir 990,OOO0 Pekeda (LO1) hili 0,oo60 5,9400 90.o00,00 534.600,00 Mandor (Lo3) hari 0,00r0 o,9900 145.O00,00 143.550,00 Excavator (Elo) Jm o,oo70 6,9300 712.300,OO 4.936.239,OO Dump Truck (E0el bulan 0,ooo8 o,7454 15.434.900,00 I1.510.788,69 10 3.2.12a]. 1m3 Timbunan Pilihan dari sumber Salim 247,4201 Pekeda (rol) hri 0,0023 o,5691 90.000,oo 51.215,96 Mmdor (ro3) hari 0,0006 o,1485 145.OOO,OO 21.525,55 Bahan pitihan urug (M09)/pasir (Mr6) M3 1,2000 296,904t 399.O00,00 I 18.464.753,46 Wheel Loader (E1s) Jam 0,008s 2,to3t 295.500,OO 621.457,49 Dump Truck (Eo9) bulan 0,0008 o,t9L7 15.434.900,00 2.958.602,O8 Motor Grader (E13) Jam 0,0040 o,9497 688.900,00 681.790,88 Tandem (Er7) Jam 0,01 12 2,77 | 1 400.100,00 t.tog.719,25 Water Tanker (E23) Jam 0,0341 8,4370 308.900,00 2.606.t97,36 11 3.3.(1) lm2 Penyiapm Badan Jalan 7.700,0000 Pekerja (LOU hari o,ooo5 3,7866 90.000,00 340.791,74 Mandor (Lo3) hari 0,0002 1,E933 145.O00,O0 274.526,68 Motor Grader (E13) Jam o,0017 13,0900 688.900,OO 9.017.701,00 Tandem / Vibro Rotter {El7) Jam o,o244 187,8800 400.100,00 75.170.788,00 t2 s. l.(1) lm3 Lapis Pond6i fure8at Kel6 A 660,0000 Pekeda (Lor) hari 0,o11 I 7,3260 90.o00,oo 659.340,00 Mmdor LO3) hari 0,oot4 o,9240 145.000,00 133.980,00 Agregat A M26 M3 1,2490 850,7400 494.O00,00 420.265.560,OO wheel lrader Els) lm 0,0087 5,7421 295.500,00 r.696.783,40 Dump Tmck (Eoe) bulan 0,0013 o,4377 15.434.900,00 t2.929.5t6,56 Motor Gmder E13l lm 0,0009 0,6089 688.900,00 4t9.486,49 Vibratory Roller (E19a) jam o,oo97 6,4266 544.700,OO 3.500.551,78 l3 6.1 (l) I liter tapis Resp Pengikat Cair/Emulsi Aspal 2.640,OOO0 Peke{a (L0 l) hari o,oo02 0,5280 90.ooo,00 47.520,OO Mandor (L03) hari 0,0001 o,2640 145.000,00 38.280,OO Aspal Emulsi CSS-I M3la) Liter 1,7 t67 4.532,O880 16.900,00 76.592.287,2O Asp. Distributor/ spalt sprayer 841 Jam 0,ooo2 0,5280 155.000,oo 81.840,00 Compressor E05 Jam o,ooo7 1,8480 343.300,OO 634.4t8,40 14 6.1 l2a) I liter Lapis Perekat - Aspal Cair/Emulsi l.980,0000 Pekerja (Lo1) hari 0,0002 0,3960 90.000,00 35.640,00 Mandor {Lo3) hari 0,0001 0,1980 145.000,00 28.710,0O Aspa.l Emulsi CRS- l lM3lal Liter 1,7167 3.399,0660 16.900,00 57.444.215,40 Asp. Distributor E4l Jam 0,0002 o,3960 351.863,00 139.337,75 Compres$r E05 Jam 0,0010 1,9800 343.300,00 679.734,OO PowerBmm E03 Jm 0,ooo8 1,5840 l5 1 ton Laston Lapis Antara (AC-BC) 914,7200 Pekerj a (L0r) hili o,24lo 22t,3783 90.000,00 19.924.O4a,t9 Mmdor (L03) hari o,o241 22,1378 14s.000,00 3.209.98s,s4 ,gr Pch Mesin 5-1O & 10-20 (Me2) M3 o,3720 34t,7221 s27.000,00 I 80.087.s36, l 6 Agr Pch Mesin 0 - 5 (Mel) M3 o,37t9 341,6490 225.000,o0 76.A71.O25,OO Semen Ml2) zak 0,1918 t76,1737 90.300,00 15.9O8.489,37 Aspal (M10) Kg 56,6100 52.OOa,7392 16.900,00 a78.947.692,44 wheel lnader El5 Jam 0,0054 4,9327 29s.500,00 1.457.604,54 AMP E01 Jm o,o24l 22,1378 9.788.900,00 216.705.O17,06 Genst E12 Jam o,o24l 22,1378 57.142,86 1.265.018,93 Dump Truck E09 bulan 0,0006 o,5447 15.434.900,00 7l Asphalt Finisher 802 Jam 0,oo83 7,6059 380.800,o0 2.896.339,64 Tandem Roller ElTa Jam o,0084 7,7453 400.100,o0 P. Tyre Roller E18 Jam 0,o056 5,1054 534.200,00 2.727 Alat Bantu Ls r,0000 9ta,7200 I6 6.3(6a) I ton Laston Lapis Aus (AC-WC) 76s,6000 Pekerja (Loll hili o,o2a7 21,9651 90.000,oo I Mandor (LO3) hari 0,0029 2,2202 145.000,00 32r ngr ech r'lesin 5-10 & 10-15 (M92) M3 0,3206 245,4270 527.000,oo 129.340.O29,OO Agr Pch Mesin 0 - 5 M91) M3 0,4193 321,O039 22s.000,00 Semen (Mr2) zak 0,1936 148,2508 90.300,00 13.387.045,80 Aspat M10) KC 62,3 I 50 47.70A3640 16.900,00 806.27 Wheel Inader 815 Jam 0,oo54 4, r 106 295.sOO,00 t.214.670,45 AMP E01 Jam o,0201 I 5,3735 9.788.900,00 Genset E12 Jam 0,0201 15,3735 57.t42,86 a7a.44537 ump Truck E09 bulan 0,0004 0,2856 15.434.900,00 4.4O7.9t5,O6 Asp. Finisher EO2 Jam 0,0125 9,5905 380.800,00 3.652.043,98 Tandem Roller E17a Jam 0,0128 9,766r 400.r00,00 3.907 P. Tyre Roller El8 Jam 0,0084 6,4374 534.200,00 3.438.873,2r rt ASB Konstruksi Jalan dan Jem5.1"n - llalaman 72 3.098.8E 1,24 72.225.477,50 150.489.595,18 IIo. KODE T'RAIA.IT KODE AATUAIT KOEFIAIEN AI|ALISA VOLI'UE HARGA AATUAIT (Rpl JUILAII IIARGA lRpl I 2 3 4 5 6 7 8 9 17 7.1 (7al 1m3 Beton stmkur, fc2o MPa l65,OOOO Pekerja (rol) hili 0,4s90 75,7315 90.oo0,oo 6.415.834,77 Tukang [n2l hui 0,6485 113,5972 r30.oo0,oo 14.767.642,OO Mmdor (rr3) hili o,0574 9,4664 145.OOO,O0 1.372.633,39 Semen {Mr2l zak 5,4590 900,7350 90.300,oo 8l.336.370,50 Pasir Beton (M0la) M3 0,6343 104,6669 413.000,00 43.227.42A,2A gregat l(aw M3 o,7922 130,7 14 1 5 12.OO0,00 66.925.634,62 Kayu Perancah lmbr 4,4444 733,3333 40. I00,00 29.406.666,67 Paku Kg 0,2305 34,0292 30.600,00 1.163.693,52 fur Ltr 190,5500 3 1.440,7500 7,80 245.237,85 Plastizier KC o,8189 135, I 103 69.400,00 9.376.651,35 Concrete Mixer (E061 jam 0,4016 66,26st 86.400,00 5.725.301,20 Concrete Vibmtor jam 2,4096 397,5904 61.300,00 24.372.289,16 Water TankTruck (E23) lam 0,0382 6,29s2 308.900,00 1.944.581,33 l8 7.e.(11 1m3 Pasangan Batu 605,OOOO Pekeda Bias lLol) hari 0,4590 277,6464 90.ooo,o0 24.991.772,14 Tukmg lw2) hili o,ll47 69,4r94 l30.ooo,oo 9.O24.525,7t Mandor (Lo3) hari o,o574 34,7097 145.000,00 5.032.908,57 Batu Kdi (M02) M3 1,0238 619,3688 231.000,00 143.O74.18t,25 Semen (PC) (ML2l nk 3,4600 2.093,3000 90.300,00 189.024.990,00 Pasir (M0lal M3 o,4562 276,OO52 4r3.000,00 I 13.990.136,2 I Conc. Mixer (E06) larm 0,4016 242,9719 86.400,00 20.992.77r,OA Water Tanker (E23) jam 0,00r4 o,8504 308.900,00 262.649,06 t8 e.2.l1l lm2 Marka Jalan Temoptastik 343,2000 Peke{a Biasa (L0r) hili o,0204 7,0010 90.o00,00 630.086,06 Tukang (w2l hui o,0025 0,875r 130.o00,00 l 13.765,54 Mandor (LO3) hui o,0025 0,875r 145.000,00 126.492,33 Cat Marka Themoplastic (Ml7bl KC 0,0339 11,6210 34.600,00 402.088,19 Glass Bead KS 0,4635 t59,O732 I 18.000,00 14.770.637,60 Dump Truck (E08) butan 0,0001 0,0337 15.434.900,OO 519.514,71 Themoplastic Road Milking Machine (E851 Jm o,o17E 6,1258 19 9.2.(s) 1 buah Patok Pengarah 180,0000 Pekeda Bias (mll hari 0,1795 32,3133 90.000,00 2.904.192,77 Tukang (w2l hari 0,0239 4,3084 130.000,00 560.096,39 Mandor (Lo3l hari o,ol20 2,t542 145.000,00 312.361,45 Beton fc 20 Mpa M186l M3 0,0338 6,O750 1.654.019,26 10.048. r67,00 Baja Tulangan (Ms7al btng o,7260 130,675 I l5.o98,OO 1.972.933,t9 Cat Ks o,loo0 18,0000 78.300,@ 1.409.40o,00 Dump Tmck EO8 bulm 0,0005 0,0829 15.434.900,00 1.278.850,84 Juoleh Totd 5.7t4.049.72tt,23 Pcmbuhtu 5.7lE.O49.OOO,OO 5a. Pealngkatan/Rehabllltaal Jalan Lebar 3 Meter lBerbukttl Satuaa: Ka I{o. KODE I'RAIAIT KODE AATUAX KOEFISTEN AI{ALISA VOLT'UE HARGA AATUAIT lRpl JI'ULIUI IIARGA (Rpl I 2 3 4 5 6 7 8 9 1 1.2 1Ls Mobilisasi 1,0000 1,0000 Sewa Direksi 11ss1 + gudang (sewa standl m2 56,OOO0 56,0000 41.700,00 2.335.200,00 Demobilisasi ls 0,3000 0,3000 623.040,00 1E6.912,00 Mobilissi alat (s€wa tmck dobel) 806 ls l,oooo l,ooo0 6.230.400,OO 6.230.400,00 2 1.8.1 lLs Manajemen dm Keselmtan Lalu Lintas 1,0000 1,0000 Pekerja (Flagman) OH 130,0000 r43,OOOO 90.ooo,00 9.295.000,OO Koordinator,/ Pengatur OK 90.000,00 J 1.17.{ 1a) lbh Pen8ujim PH buah 9,0000 9,0000 74.000,00 666.OOO,00 4 1, l9 lLs Keselamatan dan Kesehatan Kerja 1,0000 1,0000 Penlapan RKK (biaya jilid) ls 1,0000 1,0000 44.700,Oo 44. Personel K3 Konstruksi bulan 5,0000 5,0000 5.132.750,O0 2s.663. Fasilitas samna kesehatan ts 1,0000 1,0000 39.400,O0 39.400,OO sepatu boot kerja buah 15,OO00 1s,0000 162.000,oo topi proyek buah 1s,0000 15,0000 193.000,00 2. srrung tangan buah 15,0000 r5,0000 30.100,00 451 masker pemafasan pak 2,0000 2,0000 81 5 t,2l 1Ls Manajemen Mutu r,0000 1,0000 Laporan Kendali Mutu (biaya jilid) unit 4,0000 4,0000 201.600,00 q ASB Konstruksi Jalan dan Jembatan - Halaman 73 50.400,oo NO. KODE I'RAIA.IT KODE SATUAT KOErISIEII AXALIAA voLlruE HANGA AATUAIT (Rpl .,UTIAII ITAROA (Rpl I 2 3 4 5 6 7 t 9 6 2.3.(1s) lm' Gorong-gorong Kotak Beton Bertuldg, ukurd ddM 100 cm x 100 cm 33,0000 Pekeda (Lo 1) hili o,04r0 1,3530 90.o00,00 12t.770,OO Tukmg lw2l hili o,0246 o,8l 18 130.000,oo 105.534,OO Mmdor ro3l hili o,oo41 o,13s3 I45.OOO,OO 19.618,50 Beton 30 Mpa Ms9) M3 o,4622 15,2521 3.574.294,49 54.5t7.2A4,19 Baja Tulangan (M3e) bts 7,2633 239,6903 15.098,OO 3.618.844,37 paslr urug (Er-241) M3 o,2940 9,7020 269.OO0,00 2.609.838,00 Mat. Pilihan (M0e) M3 3,1400 103,6200 413.000,oo 42.795.060,OO Cetakm ukuran 100 x I00 bh/M' 1,0000 33,0000 313.500,00 10.34s.500,00 tantai Kerja Fc' 10 mpa m47 m3 0, I 300 4,2900 1.s28.635,69 6.557.847,1 I Tmper E2sl Jm 3,8540 r27,t820 44.900,00 5.7 1O.47 1,80 Flat Bed Truck (El ll Jam o,o2a7 0,947 | 470.OOO,00 445.137,00 2.3..22) Im' Salurm berbentuk U Tipe DS I 1.320,0000 Pekeda L0l) hdi o,5737 757,2840 90.ooo,00 68.155.560,00 Tukang (w2l hili o,2869 378,7080 130.ooo,00 49.232.O40,OO Mandor (1031 hari o,o574 75,7640 145.O00,oo 10.986.360,00 Semen (Ml2) ak o,9239 1.219,ffi12 90.300,oo 11o.t26.376,36 Pasir Beton (M01) M3 0,o915 120,7800 413.O00,O0 49.882.140,OO Aggregat Kasr (M03) M3 0, I 192 157,3440 512.O00,00 80.560.128,00 Fomworks M 195 M2 r,0000 r.320,0000 313.500,00 4 13.820.000,OO Air (M1701 Ltr 27,7500 36.630,OO00 7,80 285.714,OO Iantai Kerja Beton Fc' 10 mpa M47 m3 0,0600 79,20,00 1.528.635,69 12t.067.946,60 Plastik Cor roll 0,0s60 73,9200 391.000,00 28.902.720,OO Besi Beton (M57a) ke 26,7232 35.274,6292 15.098,00 532.576.35 1,39 Kawat beton (M141 KE 0,0150 l9,EO00 30.100,00 595.980,00 Beton Mixer (E06) Jam 0,4016 530,1 120 86.400,00 45.801.676,80 Water Tanker (E23) Jam 0,0557 73,5240 308.900,00 22.711.563,60 Concrete Vibrator lE20l Jam 0,4016 530, I 120 6 1.300,00 32.495.865,60 Envator (E101 jm o,0240 31,6800 7 12.300,oo 22.565.664,OO 8 3. 1.(1) 1m3 Galian Biasa 165,0000 Pekeda (L0l) hari 0,00r I 0, lSrs 90.o00,00 16.335,00 Mandor (Lo3) hai 0,0006 0,0990 145.000,00 14.355,00 Exevator (Et0) Jam 0,0038 o,6270 7 12.300,00 446.612,tO Dump Truck bulan 0,0007 0, 120 I 15.434.900,00 1.854.096, l6 9 3. l.(e) lm3 Galian Perkerasan berbutir 495,0000 Pekeria (L0l) hari 0,0060 2,9700 90.o00,00 267.300,00 Mmdor (Lo3) hari 0,0010 o,4950 145.000,00 7t.775,OO Excavator (E10) Jam 0,0070 3,4650 7 12.300,00 2.468. I 19,50 Dump Truck (E0e) bulan 0,0008 o,3729 15.434.900,00 5.755.394,35 l0 3.2..2a], lm3 Timbunm Prlihm dai sumber ca.lid 297,0006 Pekerja (Lo1) hili 0,0023 0,6831 90.000,00 6t.479,13 Mandor (Lo3) htri 0,0006 o,t782 145.O00,oo 25.839,05 Bahm pilihil (MO9)/pasir urug (M161 M3 1,2000 356,4007 399.000,00 142.203.496,86 Wheel L,oader (E1s) Jm 0,0085 2,5245 29s.500,00 745.991,31 Dump Truck (E0el bulan 0,0008 0,2301 15.434.900,00 3.551.476,14 Motor Cmder (Er3l Jam 0,0040 1,1880 688.900,00 818.414,91 Tandem (El7l Jam 0,01 12 3,3264 400.100,00 1.330.895,42 Water Tanker Jam 0,0341 to,l277 308.900,00 3.128.453,06 11 3.3.(r) 1m2 Penyiapan Badan Jalan 4.400,0000 Pekerja (Lo l) hari 0,0005 2,1638 90.oo0,00 194.738,14 Mandor rr3l hari 0,0002 1,08t9 145.000,00 156.472,39 Motor Grader (El3) Jam 0,0017 7,4AOO 688.900,00 5.152.972,OO Tmdem / Vibro Roller (El7) Jam o,0244 107,3600 400.100,00 42.954.736,00 t2 s.1.( 1l Im3 lapis Pondasi Agregat Kel6 A 330,0000 'ekerja (Loll hari 0,01 t I 3,6630 90.000,00 329.670,OO Mandor (Lo3) hili 0,0014 o,4620 145.O00,00 66.990,00 Agregat A M26 M3 t,2490 425,3700 494.000,00 21o.t32.780,OO wheel Irader (Els) jam 0,0087 2,871O 295.s00,00 848.391,70 Dump Truck (Eoe) butan 0,0013 0,4188 15.434.900,00 6.464.754,28 Grader lam 0,0009 0,0097 0,3045 688.900,00 544.700,00 209.743,24 I l3 6.1 (ll I liter lapis Reup Pengikat - AsPal Cair/ Emulsi 1.320,0000 Pekeda (101) hari 0,0002 o,2640 90.000,00 23. Mandor (rr3) hari 0,0001 0,1320 14s.000,00 r9.140,00 \spal Emulsi CSS-I (M31a) Liter t,7t67 2.266,0440 16.900,00 38.296. Asp. Distributor/ asPalt sPraYer E4l Jam 0,0002 o,2640 155.000,00 Compressor E05 Jam 0,0007 o,9240 343.300,00 317.209,20 l4 6.1 (2al I liter -pis Rr.t<at - Aspal Cair/ Emulsi hari 0,0001 990,0000 0,1980 90.000,00 7.A20,OO 28,722.1O7,7O Aspal AsD. Distributor Compressor E4l E05 Liter Jam Jam 1,7167 0,0002 - opoto 1.699,5330 0, r 980 0,9900 16.900,00 343.300,00 Power Broom E03 Jam 0,0008 0,7920 6 ASB Konstruksi JaLan dan Jembatan - HalarnanT4 69.66,8,a7 339.867,00 Ito. KODE I'RAIA.IT KODE AATUAIT KOEFISIEII AITALISA VOLI'UE IIAROA AATUAIT lRpl JI'ULIUI IIARGA (Rpl I 2 3 4 5 6 ? t 9 15 6.3l7al I ton Laston Lapis Antam (AC-BC) 459,3600 Pekerja (Lo 1) hari o,24LO 1 10,6892 90.000,oo 9.962.O24,10 Mandor (L03) hili o,o24L I 1,0689 145.000,00 t.604.992,77 ,gr Pch Mesin 5-lO & 1O-2O M3 o,3720 r70,861o 527.OO0,OO 90.043.768,08 Aer Pch Mesin O - 5 M3 o,3719 t70,4245 225.OO0,00 38.435.5 12,sO Semen (Ml2) zok 0, l9l8 88,0869 90.300,00 7.954.244,69 .spal (Ml0) Kg s6,6100 26.004,3696 16.900,00 439.473.A46,24 wheel Loader El5 Jam 0,00s4 2,4663 295.500,O0 728.802,27 AMP E01 Jm o,o24t I 1,0689 9.788.900,00 108.352.508,53 Censt E.12 Jam o,o24l I 1,0689 57.142,86 632.509,47 Dump Truck EO9 bulan o,0006 o,2723 15.434.900,00 4.203.427,35 ,sphatt Finisher EO2 Jam o,0083 3,8030 380.800,oo 1.444.169,82 Tmdem Roller E17a Jam 0,0084 3,A726 400.1o0,00 t.549.440,62 P. Tyre Roller E18 Jam o,0056 2,5527 534.200,00 1.363.639,76 Alat Bantu Ls 1,0000 459,3600 l6 6.3(6a) 1 ton Iaston Lapis Aus (AC-WC) 382,8000 Pekerja (Loll htri o,o2a7 10,9825 90.ooo,oo 988.427,AA Mandor (L031 hari 0,0029 1,1 101 l45.OOO,O0 160.967,40 Agr Pch Mesin 5-1O & 10-15 (Me2l M3 o,3206 122,7t35 527.000,00 64.670.O14,50 igr Pch Mesin 0 - 5 M91 M3 0,4193 160,5020 225.OOO,OO 36.1t2.938,75 Semen (M12) zak 0,1936 74,1254 90.300,00 6.693.522,90 Aspal (Ml0l Kg 62,3r50 23.854,1820 16.900,oo 403. l 35.675,80 wheel Loader Et5 Jm 0,oo54 2,0s53 295.500,00 607.335,22 AMP EOI Jm 0,o201 7,6867 9.788.900,OO 75.244.797,59 Genset Et2 Jm 0,o201 7,6467 57.t42,86 439.242,69 Dump Truck E09 bulan 0,0004 o,t428 15.434.900,00 2.203.957,53 Asp. Finisher EO2 Jam 0,012s 4,7952 380.800,00 t.a26.o21,99 Tmdem Roller ElTa Jm o,0128 4,8831 400.100,00 1.953.716,07 P. Tyre Roller El8 Jam 0,0084 3,2t87 534.200,00 1.7 t9.436,60 t7 7.1 l7a) 1m3 Beton strukur, fc20 MPa 165,OOOO Peke{a (Loll hari 0,4590 75,7315 90.000,00 6.E15.E34,77 Tukang (w2 hari 0,6885 I t3,5972 I 30.000,00 t4.767.642,OO Mandor (L031 hari o,o574 9,4664 145.000,00 r.372.633,39 Semen (Mr2) ?AK 5,4590 900,7350 90.300,00 8l.336.370,50 Pasir Beton M3 0,6343 104,6669 4 13.000,00 43.227.428,28 Agegat l(asil M3 o,7922 130,7141 5 12.000,00 66.925.634,62 Kayu Perancah lmbr 4,4444 733,3333 40.100,00 29.40,6.666,67 Paku Kg 0,2305 34,0292 30.600,oo 1.163.693,s2 Air Ltr 190,5500 31.440,7500 7,80 245.237,a5 Plastizier Kg 0,8189 135, r 103 69.400,00 9.376.65r,35 Concrete Mixer (Eo6l jm 0,4016 66,265t 86.400,OO 5.725.301,20 Concrete Vibmtor lam 2,4096 397,5904 61.300,00 24.372.249,16 water TankTruck (E231 JM 0,o382 6,2952 308.900,00 1.944.581,33 18 7.e.ltl 1m3 hsilgan Batu r.009,8000 Pekerja Biasa (L01 hari 0,4590 463,4838 90.000,00 41.713.539,69 Tukmg (wzl hili o,lL47 I 15,8673 130.O00,00 15.062.753,83 Mandor (1.O3) hari o,o574 57,9337 145.O00,00 8.400.381,94 Batu Kdi (M02) M3 r,0238 1.033,7828 23r.000,00 238.803.815,25 Semen (PC) (Ml2) zak 3,4600 3.493,9080 90.300,00 315.499.892,40 Pasir (M0la) M3 o,4562 460,6777 413.000,00 190.259.900,07 Conc. Mixer (E06) jam 0,4016 405,5422 86.400,OO 35.O38.843,37 Water Tanker jam 0,0014 t,4194 308.900,00 438.451,92 l9 e.2.(s) 1 buah Patok Pengarah 183,0000 Pekeda Biasa (Lor) hari o, r795 32,85 l8 90.000,00 2.956.662,6s Tukang lto2l hari 0,0239 4,3802 130.000,00 569.431,33 Mmdor hari 0,0120 2,1901 145.OO0,00 3l '.567, Beton fc 20 MPa M3 0,0338 6,1763 1.654.O19,26 10.2 Baja Tulangan btnC o,7260 132,853 I r5.098,00 I Cat lm42l Kg bulan o,1000 18,3000 78.300,00 I I l.300.165,O2 Jrhrqh Totd 4.7L8.22L.$L,43 4.7La.221.@O,OO 5b. Penlngkatan/Rehabllltast Jalaa Lebar 3,5 ileter (Berbukit) Satuan: Km I NO. KODE URAIAX KODE AATUAIT KOEFISIEIT AITALISA VOLI'UE IIAROA SATUAT (RPI JT'ULIUI HARGA (Rpl I 2 3 4 5 6 7 t 1 t.2 lLs Mobilisasi r,o000 1,0000 sewa Direksi 6661 + gudang (sewa stand) m2 ls 56,0000 41. 186.9 fr unisasi aat (sewa truck dob€l) E06 ls 1,0000 1,0000 6.230.400,00 6.230.400,00 ASB Konstruksi Jalan dan Jembatan - Halaman 75 lM0la) tE23) (LO3) (M186) lump Truck EO8 o,ooo5 o,0842 ,11 NO. KODE I'RAIAIT KODE SATUAI| KOEFIAIEIT AITALISA voLUut HARGA AATUAX (Rpl JI'ULAII IIAROA (RPl I 2 3 4 s 6 7 E 9 2 1.8.1 lLs Mmajemen dm Keslmatan talu Lintas l,oooo l,oooo Peke{a (Flagmm) OH 130,OOOO r43,OOO0 90.ooo,oo 9.295.OOO,OO Kmrdinator / Pengatur OK 90.000,00 3 1.17.(la) lbh Pengujim PH buah 9,OOOO 9,0000 74.OO0,OO 666.O00,OO 4 l,t9 lLs Keslmatan dan Keshatan Kerja 1,0000 l,OOOO Penlapan RKK (biaya jilid) ls l,oooo l,ooo0 44.700,OO 44.700,OO Personel K3 Konstruksi bulm 5,0000 5,0000 5.132.750,OO 2s.663.750,00 Fasilitas sma kesehatan ls 1,0000 1,0000 39.400,00 39.400,00 sepatu bmt ke{a buah l5,oooo 15,0000 162.000,oo 2.430.000,oo topi proyek buah 15,0000 15,0000 193.O00,00 2.895.OO0,00 srung tangm buah I 5,OOO0 1s,0000 30. l 00,00 451.500,OO masker pemafasan pak 2,0000 2,0000 40.500,00 81.O00,00 5 t,2r lLs Manajemen Mutu l,ooo0 r,ooo0 Laporan Kendati Mutu (biaya jilid) unit 4,0000 4,0000 50.400,00 201.600,oo 6 2.3.(lsl Im' Gorcng-gorong Kotak Beton Bertulant, ukuran datam IOO cm x IOO cm 33,OOOO Pekeda (Loll hari o,o410 1,3530 90.000,oo 121.770,oo Tukang lw2t hari o,0246 o,8118 r30.000,00 105.534,00 Mandor (L03) hari 0,0041 0,1353 145.000,00 r9.618,50 Beton 30 Mpa (Mse) M3 o,4622 15,2526 3.574.294,49 54.5t7.244,t9 Baja T[langan (M3el btg 7,2633 239,6903 15.098,00 3.61A.844,37 pasrr urug (Er-241) M3 o,2940 9,7020 269.OO0,00 2.609.838,OO Mat. Pilihan (M091 M3 3,1400 103,6200 413.000,00 42.795.060,00 Cetakm ukuran lO0 x lOO bh/M' l,ooo0 33,0000 313.500,OO 10.345.500,00 lantai Kerja Fc' 10 mpa m47 m3 0,1300 4,2900 1.528.635,69 6.557.847, I I Tamper E2sl Jam 3,8540 127,1420 44.900,00 s.710.47t,AO Flat Bed Truck (El1) Jam o,0287 0,9471 470.000,00 445.137,00 7 2.3.(22l, 1m' Salurm berbentuk U Tipe DS I 1.329,0000 Pekerja (L0 1) hari o,5737 762,4473 90.o00,00 68.620.257,OO Tukang w2l hari 0,2869 38 l,290 l 130.000,00 49.567.7r3,OO Mandor (103) hari 0,0574 76,2846 145.000,00 1t.o6t.267,OO Semen (Ml2l zak o,9239 t.227,8764 90.300,00 rro.877.238,O2 Pasir Beton {Moll M3 0,0915 l2 1,6035 413.000,00 50.222.245,50 Aggregat Kasar M3 o,tt92 158,4 168 512.000,00 8 1.109.40 1,60 Fomworks (Mles) M2 l,oooo 1.329,0000 313.500,oo 416.641.500,OO Air Ml70) Ltr 27,7500 36.479,7500 7,80 2A7.662,05 Lstai Kerja Beton Fc' 10 mpa M47 m3 0,0600 79,7400 1.528.635,69 r2t.a93.409,A7 Plastik Cor roll 0,o560 74,4240 39l.OO0,OO 29.O99.784,OO Besi Beton (M57a) ks 26,7232 35.515,1380 15.098,00 s36.207.553,78 Kawat beton (M14) Kg o,o150 19,9350 30.100,00 600.043,50 Beton Mixer (E06) Jam 0,4016 533,7264 86.400,00 46. l 13.960,96 Water Tanker (E23) Jam 0,05s7 74,0253 308.900,00 22.A66.4t5,t7 Concrete Vibrator Jam 0,4016 533,7264 61.300,00 32.717.428,32 Exavator (E10) jam o,0240 3 1,8960 712.300,oo 22.7t9.520,80 8 3. 1.(1) lm3 ca.lian Biasa r65,0000 Pekerja (Lo1) hri 0,001 I 0, l8l5 90.000,00 16.33s,00 Mandor (r,o3) hari 0,0006 0,0990 145.000,00 14.355,00 Excavator (E101 Jam 0,0038 o,6270 712.300,00 446.612,1O Dump Truck (E0el bulan 0,0007 0,120 l 15.434.900,O0 1.854.096, l6 9 3.1.(e) 1m3 Galian Perkerasan berbutir 577,5000 Pekerja (Lo 1) hari 0,0060 3,4650 90.000,00 311.850,OO Mandor (L031 hari 0,0010 o,5775 145.000,00 83.737,50 Excavator (Er0) Jam 0,0070 4,0425 7 12.300,oo 2.879.472,75 Dump Truck tE0e) bulan 0,0008 0,4350 15.434.900,00 6.7t4.626,74 l0 3.2.I2a]' Im3 Timbunan Pilihan dari sumber galian 296,4054 ekerja LOI) hari 0,0023 o,6817 90.000,00 61.355,92 Mandor (103) hari 0,0006 o,t778 145.OO0,00 25.787,27 Bahan pilihan urug (M09)/pasir (M16) M3 1,2000 355,6865 399.000,00 141.918.920,O8 wheet Loader (Els) Jam 0,oo85 2,5t94 29s.500,00 744.496,34 ump Truck (Eoe) bulan 0,0008 o,2296 15.434.900,00 Mobr Grader (El3) Jam 0,0040 l, 1856 688.900,00 8t6.774,4O Tandem (E171 Jam 0,o112 3,3197 400, loo,00 water Tanker (E23) Jm o,o34l ro,Lo74 308.900,o0 3. 11 3.3.(11 lm2 Fenyiapan Badan Jalan 4.950,0000 ekelja (rol) htri 0,0005 2,4342 176.481,44 Mandor Motor Grader (rr3) (E13) hari 0,0002 1,2 8,4150 5.797.093,50 fanaem I Vibro Roller (E17) Jam o,0244 r20,7800 400.100,00 4A324.O78,OO 4 ASB Konstruksi Jalan dan Jernbatan - Halaman 76 3.544.358,97 r.328.22A30 90.000,oo 145.000,00 19.O80,40 Jam 0,0017 688.900,00 ilo. KODE I'RAIAIT KODE SATUA.IT KOEFIAIEI{ ANALIAA VOLI'HE HARGA AATUAI| (npl JI'ULAII IIAROA (Rp) I 2 3 4 5 6 7 E 9 t2 s. 1.(1) lm3 Lapis Pondasi Agregat Kelas A 385,0000 Pekerja (LOl) hili o,ol 11 4,2735 90.ooo,oo 384.6r5,OO Mmdor (LO3) hili 0,oot4 o,5390 r45.000,oo 78.155,00 Agregat A M26 M3 1,2890 496,2650 494.000,oo 245.154.910,00 wheel Loader (E1s) jm 0,0087 3,3495 295.500,00 949.790,32 rump Truck (E0e) bulm 0,o013 0,4886 15.434.900,00 7.542.217,99 Motor Grader E 13) jm 0,0009 o,3552 688.900,00 244.700,45 Vibratory Rotler (E 19a) jam 0,oo97 3,7488 544.700,00 2.O41.9AA,54 13 6.r (1) I liter Lapis Resap Pengikat - Aspal Cair/Emulsi 1.540,OO00 Pekerja (Lo 1) hari 0,0002 0,30Eo 90.000,00 27.72O,OO Mmdor (Lo3) hari 0,o001 0,1540 145.000,00 22.330,00 Aspal Emulsi CSS-l (M3lal Liter 1,7167 2.643,7t80 16.900,00 44.678.834,20 Asp. Distributor/aspalt sprayer E41 Jam 0,o002 0,3080 r55.000,00 47.740,00 Compressor E05 Jm 0,ooo7 r,0780 343.300,00 370.O77,40 l4 6.r l2al I liter Lapis Perekat Cair/Emulsi Aspal l.155,0000 Pekerja (Loll hari 0,0002 o,2310 90.000,00 20.790,OO Mandor {Lo3) hari 0,0001 o, I 155 r45.000,00 t6.747,50 Aspal Emulsi CRS- I {M31a) Liter 1,7 t67 1.982,7AA5 r6.900,00 33.509.125,65 Asp. Distributor E4l Jm 0,ooo2 0,23 10 351.E63,OO 8r.280,35 ompres9r E05 Jam 0,o0ro 1,1550 343.300,OO 396.5r 1,50 Power Broom E03 Jm 0,0008 o,9240 l5 6.3l7al I ton Laston lapis Antara (AC-BC) 535,9200 Pekeda (Lo1) hari o,24to 129,1373 90.ooo,oo 1t.622.361,45 Mmdor r,03) hri o,o241 12,9137 145.000,00 1.872.491,57 Aer Pch Mesin 5-10 & 10-20 (Me2l M3 o,3720 199,3379 527.OOO,OO 105.05 1.062,76 Agr Pch Mesin 0 - 5 M9l) M3 0,37 l9 t99,2953 225.OO0,00 44.841.431,25 Semen (Ml2) zak 0,1918 to2,76ao 90.300,00 9.279.952,13 Aspal Mlol Ks 56,6lOO 30.338,43 12 16.900,00 512.719.487,28 wheel t ader El5 Jam 0,0054 2,4774 29s.s00,00 85O.269,31 AMP E01 Jam o,o24l 12,9t37 9.788.900,OO t26.411.259,95 Genset Et2 Jam o,o24l t2,9t37 57.142,86 737.927,71 Dump Truck E09 bulan 0,0006 o,3t77 15.434.9O0,00 4.903.998,58 Asphalt Finisher EO2 Jam 0,0083 4,4368 380.800,00 1.689.531,46 Tmdem Roller ElTa Jm 0,0084 4,5181 400.100,00 1.807.640,72 P. Tyre Roller E18 Jam 0,0056 2,9781 s34.200,00 1.590.913,06 Alat Bantu Ls l,0000 s35,9200 16 6.3(6al I ton Laston lapis Aus (AC-WC) 446,6000 Pekeda (10 1) hari o,o2a7 12,8 130 90.000,00 1. 153. 165,86 Mandor (103) hari o,oo29 1,2951 145.000,00 187.795,30 Agr Pch Mesin 5-10 & 10-15 (Me2l M3 o,3206 143,1658 527.OO0,00 75.448.350,25 Agr Pch Mesin 0 - 5 (M9l) M3 0,4193 ta7,2523 225.OO0,00 42.131.761,84 Semen (Ml2) zak 0,1936 86,4796 90.300,00 7.809.1 10,O5 Aspal (M1o) Kg 62,3 r50 27.A29,8790 16.900,00 470.324.955,1O wheel lnader Et5 Jm 0,o054 2,3978 29s.soo,00 708.557,76 AMP EOI Jam o,0201 a,9679 9.788.900,OO 87 Cen*t Et2 Jam 0,o201 a,9679 57.142,86 5t2.449,4O Dump Truck E09 bulm 0,o004 o,1666 15.434.900,OO 2.571.283,74 ,sp. Finisher EOz Jm o,0125 5,5944 380.800,00 2. Tandem Roller ElTa Jam 0,0128 5,6969 400.100,00 2.279.33s,41 P.Iyre Roller E18 Jam 0,0084 3,7552 534.200,OO l7 7.r l7a lm3 Beton strukur, fc20 MPa 77 Peke{a (LOU hari 0,4590 0,68Es 75,7315 90.000,00 14.767 Mandor r,o3l hari 0,0574 9,4664 145.000,00 t.372.633,39 S€men (Ml2) zak 5,4590 900,73s0 90.300,00 I .428,24 Pasir Beton (M0la) M3 0,6343 o,7922 104,6669 413.O00,00 66.925.638,62 Kaw Perancah Paku Air lmbr Ltr 4,4444 0,2305 190,5500 733,3333 3A,0292 3 1.440,7500 40.100,00 30.600,00 7,ao 29.40,6.66'6,67 l.163693.5' 245.237,A5 Mixer 135, I I 66,265 69.400,00 86.400,00 9.376.651,3s 5.725.301,20 18 I LUllclc[c Concrete Vibrator Water TanKtruck Pasansan Batu Pekerja Biasa jam jam hari 2,4096 397,5904 .300,00 308.900,00 90.000,00 Batu hari hari M3 zak ---M3- o,ll47 0,0574 I,O23A - 3J6OO o,4562 I 1s,8673 57,9337 r.033,7828 3.493,9080 460,6777 r30.000,00 r45.000,00 231.000,00 90.300,00 4r3.000,00 3t5.499.892,40 Mixer jam 0,40r6 405,5422 E6.400,00 35.O38.843,37 E23) lam 0,0014 t,4194 308. 900,00 438.451,92 4 ASB Konstruksi Jalan dan Jembatan - Halaman 77 ,19 2.00,6.OO9,37 165,0000 hari 24.372.289,16 1.944.58r,33 4 r.7 13.s39,69 15.062.753,83 8.400.381,94 NO. KODE URAIAIT KODE SATUAIT KOEFISIET A.ITALISA VOLIIIE HARGA SATUAIT (RPl JT'ULAII HARGA (Rpl 1 2 3 4 5 6 7 a 9 l9 e.2.(s) I buah Patok Pengarah l83,OOOO Pekeda Bias (r,o1) hari 0,1795 32,8518 90.o00,00 2.956.662,65 Tukmg lto2l hri o,0239 43402 130.ooo,00 569.431,33 Mmdor (LO3) hili 0,o120 2,t901 145.OO0,00 317.567,47 Beton fc 20 Mpa (M186) M3 o,o338 6,t763 1.654.Or9,26 10.215.636,45 Baja TUlangan (M57al btng o,7260 l 32,853 I 15.o98,O0 2.005.815,41 Cat (ma2) Kc o,looo 18,3000 7E.300,OO r.432.890,OO Dump Truck E08 Jm 0,0005 o,oa42 15.434.900,00 1.300.165,02 Juoleh Total s.(xr1.1(xt.o3E,74 Pcmbrletu 5.(x)1.l03.ooo,oo
6.Pealagkataa/Rehablltasl.Ialan Lebar 4 Meter (Berbuktt) Satuaa : Km I{o. KODE I'RAIAIT KODE SATUAIT KOEFISIEN ANALISA VOLI'UE HARGA AATUAIT lRpl JI'UL/UI HARGA (RPI I 2 3 4 5 6 ? E 9 I r.2 lLs Mobitisasi 1,0000 l,oooo Sewa Direksi Keet + gudmg lswa stand) m2 56,OOO0 56,0000 41.700,00 2.335.200,O0 Demobilissi ls 0,3000 0,3000 623.040,00 186.912,OO Mobilissi alat (sewa truck dobel) E06 LS 1,0000 1,0000 6.230.400,00 6.230.400,00 2 1.8. I 1Ls Manajemen dm Keselmatan lalu Lintas 1,0000 1,0000 Pekeda (Flagmm) OH 130,0000 143,OOOO 90.oo0,00 9.295.000,00 Koordinator / Pengatur OK 90.000,00 3 r.17.(la) lbh Pengujim PH buah 9,0000 9,0000 74.000,00 666.000,00 4 1Ls Keslamatan dan Keshatan Keda 1,OOO0 1,0000 Penyiapm RKK (biaya jilid) ls r,0000 1,0000 44.700,00 44.700,00 Personel K3 Konstruksi bulan 5,0000 5,0000 5.132.750,00 2s.663.7s0,00 Fasilitas sma kesehatan ls 1,0000 1,0000 39.400,00 39.400,00 sepatu boot kerja buah 15,0000 15,OOOO 162.000,00 2.430.000,oo topi proyek buah 15,0000 rs,0000 193.000,00 2.895.000,00 sarung tilgan buah 15,0000 l5,ooo0 30.100,o0 45 r.500,00 masker pemafasan pak 2,O000 2,0000 40.500,oo 81.000,oo 5 t,21 lLs Manajemen Mutu 1,0000 1,OOOO Laporan Kendali Mutu (biaya iilidl unit 4,0000 4,O000 50.400,00 201.600,00 6 2.3.(ls) 1m' Gorong-gorong Kotak Beton Bertutang, ukum dalam 1OO cm x 100 cm 26,4000 Pekeda (LOU hari 0,0410 I,Oa24 90.000,00 97.416,00 Tukang lw2l hari 0,0246 o,6494 130.000,00 44.427,20 Mandor (103) hari 0,0041 0,1082 r45.000,00 15.694,80 Beton 30 Mpa (Mse) M3 o,4622 t2,202t 3.574.294,49 43.613.A27,35 Baja Tulangan r39) btg 7,2633 19t,7523 15.098,00 2.895.O75,49 lasir urug (Er-24r) M3 o,2940 7,7616 269.000,oo 2.O87.870,40 Mat. Pitihan (M091 M3 3,1400 82,8960 413.000,00 Cetakan ukuran 100 x lOO bh/M' 1,OO00 26,4000 313.500,00 Lantai Kerja Fc' 10 mPa m47 m3 0,1300 3,4320 1.528.635,69 5.246.277,69 Tamper (E2s) Jam 3,8540 1o1,7456 44.900,00 4. Flat Bed Truck (E1l) Jam o,o2a7 o,7577 470.000,00 356.109,60 2.3..22l' 1m' Salurm berbentuk U TiPe DS 1 l.1oo,0000 (Loll hari o,5737 631,0700 s6.796.300,00 4 Mandor (Lo3) hari 0,0574 63,1400 145.000,00 9.155.300,O0 Semen (M12) nJ< o,9239 1.016,3010 90.300,00 1. 41.568.450,00 Pasir Beton (M0u M3 0,0915 100,6s00 413.000,o0 Aggr€gat Kasar M03) M3 0, I 192 1 3 r,1200 512.000,oo 67. Fc' 10 mpa Cor Beton beton Beton Tanker M2 1,0000 | 27,7500 | -- op6ool o.o560 26,7232' 0,o150 - 03016 0,0557 - 0rot6 1.100,0000 30.52s,0000 ---66iOOOO --- 6l,6000 -- 29395,5243 ---- 16,5000 ---- 44t,?600 a- 6r,r?00 - 44t"?6oo 313.500,00 7,80 I 1.528.635,69 J 391.O00,00 15.098,O0 30.100,00 86.400,00 308.900,00 61.300,00 344.850.000,o0 238.095,OO loo38r.r55.54 24.085.600,00 -- 443513.6%,15 496.6sO,00 --&16806400 - ra,s%ft.oo l-ffi Jam 0,0240 | o,00 t I 0,0006 -- or0o38 0,0007 26,4000 I t65,0000 | o,l8l5 I o,0990 o,6270 I o,12ot 712.300,oo 90.000,o0 145.000,00 7 12.300,00 i--s.+34.roopo 18.804.720,00 16.335.00 14.355,00 446.612,1O 1.8s4.096,16 4 ASB Konstruksi Jalan dan Jembatan - Halaman 78 l, 19 Pekeda 90.000,00 r30.000,00 Tukans tn2l hri o,2869 3 I 5,5900 (M170) M47 (N,r5?.1 (Ml4) (E06) (E23) (E201 IEIOI Ltr -- *3- ---;n- -- kg Jam ---ffi-- - ia-- ---_-i- lam Ito. KODE I'RAIAIT KODE SATUAIT KOEFISIEIT ATALISA VOLI'UE HARGA AATUAIT (Rpl JI'UL/UI HARGA lRpl I 2 3 4 5 6 7 t 9 9 3.1.(e) lm3 Galim Perkeraw berbutir 660,O000 Pekerja (Lol) hri 0,0060 3,9600 90.o00,o0 356.400,OO Mmdor (ro3) hili o,ooto o,6600 r45.000,o0 95.700,OO Exevator (El0) Jm 0,oo70 4,6200 712.300,oo 3.290.826,OO Dump Truck bulm o,oooa o,4972 15.434.900,00 7.673.A59,13 lo 3.2.12a]' lm3 Timbunan Pilihm dili sumber galian 336,6181 Pekeda LOI hili o,oo23 o,7742 90.oo0,o0 69.679,95 Mmdor (Lo3l hili 0,0006 o,2020 145.000,00 29.2A5,78 Bahm pilihm urug (M09)/pasir (M16) M3 1,2000 403,9417 399.000,oo 161.172.755,A6 Wheel Irader (E1s) Jm 0,0085 2,46t3 295.500,00 845.500,56 Dump Truck (E0e) bulan 0,ooo8 o,2608 15.434.900,00 4.O25.214,56 Motor Gmder (El3) Jam 0,0040 1,3465 688.900,00 927.5A4,A9 Tandem Jm 0,ol l2 3,7701 400. I 00,o0 t.5o4.426,19 Water Tanker Jam 0,o341 1t,4787 308.900,00 3.545.763,60 l1 3.3.(ll lm2 Penyiapm Badm Jalm 5.soo,0000 Pekerja (LOl) hari 0,0005 2,7047 90.000,oo 243.422,67 Mandor (Lo3) hari 0,0002 1,3523 145.000,00 196.090,48 Motor Grader Jam 0,0017 9,3500 688.900,00 6.441.215,00 Tmdem / Vibro Roller Jam o,0244 134,2000 400.100,00 53.693.420,OO t2 s.1.( r) lm3 Lapis Pondci Agregat Kel6 A 440,0000 Pekeda (LO1) hili o,0l I I 4,8840 90.oo0,00 439.560,00 Mandor (103) hili o,ool4 o,6160 145.OOO,00 89.320,OO Agregat A M26 M3 1,2490 567,1600 494.000,00 2ao.t77.o40,oo Wheel lrader (Ers) lam o,oo87 3,8281 295.500,00 1.13 l.188,93 Dump Truck (Eo9) bulm o,oo13 o,5585 15.434.900,00 8.6t9.677,70 Motor Orader (Er3) jam 0,ooo9 o,4059 688.900,00 279.657,6 Vibratory Roller (E19a) jam o,oo97 4,2844 544.70O,0O 2.333.701, r8 13 6.1 (11 I liter Lapis Resap Pengikat - Aspal Cair/Emulsi 1.760,o000 Pekerja (LOl hari 0,o002 0,3520 90.000,oo 3l.6ao,oo Mandor (Lo3l hili 0,0001 o,1760 145.000,00 25.520,OO Aspal Emulsi CSS-l Liter 1,7t67 3.O2t,3920 16.900,00 51.061.524,80 Asp. Distributor/6palt sprayer E4L Jam 0,0002 0,3s20 155.000,00 54.560,00 Compressor E05 Jam 0,0007 1,2320 343.300,OO 422.945,60 t4 6.1 l2al 1 liter lapis Perekat Cair/Emulsi Aspal l.320,oooo Pekeda ,L01) hari 0,0002 o,2640 90.000,00 23.760,OO Mmdor (103) hari 0,0001 0,1 320 r4s.000,00 19.140,00 Aspal Emulsi CRS-1 Liter 1,7167 2.266,0440 16.900,00 38.296.143,60 Asp. Distributor E4l Jam 0,0002 o,2640 351.863,00 92.891,83 ompressor E05 Jam 0,001o 1,3200 343.300,00 453.156,OO Power Broom E03 Jm 0,0008 1,O560 15 6.3(7a) I ton laston l"apis Antam (AC-BC) 612,4800 Pekerja (LOr) hari o,24lo 147,5855 90.000,00 I Mmdor hari o,o24l 14,7586 145.000,00 2.139.990,36 Agr Pch Mesin 5-10 & lO-2O (Me2) M3 o,3720 227,8t47 527.000,oo 120.058.357,44 Agr Pch Mesin 0 - 5 (Merl M3 o,3719 227,7660 225.000,00 5 L247.350,00 Semen (M12) zak o,1918 tt7,4492 90.300,00 10.605.659,58 ispal Ml0l KC 56,6100 34.672,4928 16.900,00 585.965.128,32 wheel Loader E15 Jam 0,o054 3,2884 295.500,OO 971.736,36 AMP E0l Jam o,o24l 14,7586 9.788.900,00 t44.470.o11,37 Genset Et2 Jam o,o24l t4,7586 57.t42,86 345,96 Dump Truck E09 bulan 0,0006 0,363 I 15.434.900,00 5.604. Asphalt Finisher EO2 Jam o,0083 5,0706 380.800,00 1.930.893, lO Tmdem Roller ElTa Jam 0,oo84 5,1635 400.100,00 P.'IYre Roller E18 Jam 0,o056 3,4036 534.200,00 1.818.186,35 Alat Bantu Ls 1,0000 612,4800 16 I ton t aston fapis Rus 1RC-WC; s 10,4000 1.3 l7 Pekeda (L0l) hari o,0287 14,6434 214.623,20 Mandor (Lo3) hari o,w29 t,4ao2 86.226.6a6,OO Rgr Pch uesin 5-10 & 10-15 M3 0,3206 527 Agr Pch Mesin 0 - 5 {M9l) M3 0,4193 2t4,0,026 225.000,00 90.300,o0 a.924.697 Genset 5 t2 KE Jam -- J"r"- --E;- -- brl." 62,3150 o,0054 o,020I 0,020 t 0,0004 .805,5760 2,7404 to,2490 1o,2490 o,1904 16.900,00 295.500,00 ,78&rooPo 57.t42,86 15.434.900,OO 537.514.234,40 809.780,30 100.326.396,79 585.656,91 2.938.610,04 L7 1 fc20 MPa 7a Er8 Jam Jam hari 125 0,0 6,5108 16 75,7315 I 400. L4 hili 0,6885 0,o574 9,4664 r.372.633,39 0 ASB Konstruksi Jalan dan Jembatan - Halaman 79 EI: 6.3(6a) 145.000,o0 AsDa.l Wheel l.oader AMP 90.000,00 130.000,00 145.000,00 NO. KODE I'RAIATI KODD AATUAX KOEFIAIEIT AI|ALIAA VOLI'UE IIARGA SATUAIT (RPl .,T'UIAII HIIRGA I 2 3 4 5 6 7 t 9 Semen M12) zak 5,4590 900,7350 90.300,oo 8 1.336.370,50 Pasir Beton (M01a) M3 0,6343 10,4,6669 4l3.OO0,OO 43.227.424,24 Agregat Kas M3 o,7922 130,7 14 1 sl2.oo0,oo 66.925.63A,62 Ikyu Permcah lmbr 4,4444 733,3333 40. loo,oo 29.406.666,67 Paku Ks o,230s 34,0292 30.600,oo l. 163.693,52 Air Ltr 190,5500 31.440,7500 7,AO 245.237,85 Plastizier KC 0,8 r89 135, I lO3 69.400,O0 9.376.651,35 Concrete Mixer (E06) JM 0,4016 66,26sr 86.400,00 5.725.30t,20 Concrete Vibrator Jam 2,4096 397,5904 61.300,00 24.372.249,t6 Water Tanl(Truck (E231 jam 0,0382 6,2952 308.900,o0 1.944.581,33 18 7.e.(ll 1m3 Pasangan Batu 970,2000 Pekerja Biae L0 1) hari 0,4590 445,3079 90.ooo,00 40.o77.7 14,60 ukang lw2l hili o,t147 1 I 1,3235 130.OOO,OO t4.472.O57,60 Mmdor LO3) hili o,0574 55,6618 145.000,00 8.070.955,20 Batu Kali (Mo2) M3 1,0238 993,2423 23l.OO0,OO 229.434.959,75 Semen (rc) (M12) ak 3,4600 3.356,8920 90.300,oo 303.127.347,60 Pasir (M0la) M3 o,4562 442,6r19 413.000,00 82.794.727,52 Conc. Mixer {Eo6) Jam 0,4016 389,6386 86.400,O0 33.664.77r,Oa Water Tanker (E23) jam o,o014 1,3637 308.900,00 421.257,72 l8 e.2.(Ll lm2 Marka Jalan Termoplastik 79,2000 Pekerja Biasa (L0r) hili o,0204 1,6 r56 90.ooo,00 145.404,44 Tukang $n2l hili 0,0025 o,2020 l30.ooo,o0 26.253,59 Mmdor (Lo3) hari o,o025 o,2020 r45.000,00 29.282,85 Cat Marka Themoplastic (M17b) Kg 0,0339 2,6Ata 34.600,00 92.789,58 Glass Bead (M34) Kg 0,4635 36,7092 r 18.000,00 4.331.685,60 Dump Truck (Eo8) bulan 0,o001 0,0078 15.434.900,00 I19.888,01 Themoplastic Road Milking Machine (E8sl Jam 0,o178 1,4137 19 e.2.(sl 1 buah Patok Pengarah 184,0000 Pekerja Biasa (10 r) hari 0,1795 33,0313 90.000,00 2.972.819,28 Tukang lw2l hari 0,0239 4,4042 130.000,00 572.542,97 Mmdor (Lo3) hari 0,0120 2,2021 145.000,00 319.302,8i Beton tc 20 Mpa (Ml86l M3 0,0338 6,2rOO t.654.O19,26 1O.27t.459,60 Baja Tulangan (M57al btnc o,7260 133,5790 1s.098,00 2.Ot6.776,\s Cat lma2l Kg 0,1000 18,4000 78.300,00 1.440.720,OO Dump Truck EO8 bulan 0,000s o,0847 15.434.900,00 t.307.269,75 .rFmhf, Totd 4.964.34.277,39 Pcmbuletu 4.964.544.(x)O,OO 7, Pealngkatan/Rehablltagl Jalan Lebar 5 Meter (Berbukttl Satuaa: Km IIO. KODE I'RAIAI KODE SATUAIT KOEFIsIEI{ AITALISA voLtuE HARGA AATUAX lRpl JI'ULIUI IIARGA lRpl I 2 3 4 5 6 7 E 9 I 1.2 lLs Mobilisasi 1,0000 1,0000 Sewa Direksi 1(sgt + gudang (s€wa standl m2 56,0000 s6,0000 41.700,00 2.335.200,00 Demobilisasi ts 0,3000 o,3000 623.040,00 lE6.9l2,OO Mobilisasi alat (sewa truck dobeU E06 LS r,0000 1,0000 6.230.400,00 6.230.400,OO 2 1.8. I lLs Mmajemen do Keslmatm lalu Lintd 1,0000 r,0000 Pekerja (Flagman) OH 130,oo00 143,0000 90.000,00 9.295.000,00 Koordinator / Pengatur OK 90.ooo,00 3 l. I 7.(1 a) 1bh Pengujian PH buah 9,0000 9,0000 74.000,00 666.000,00 4 l, 19 lLs Keselamatan dan Kesehatan Keda 1,0000 1,0000 Penyiapan RKK (biaya jilid) ls 1,0000 1,0000 44.700,00 44.700,OO Personel K3 Konstmksi bulan 5,0000 5,0000 5.132.750,00 25.663.750,00 Fasilitas sarana kesehatan ls 1,0000 1,0000 39.400,00 39.400,00 sepatu boot kerja buah 15,0000 15,0000 162.000,o0 2.430.00(),00 topi proyek buah 15,0000 15,0000 193.000,00 2.895.000,00 sarung tangan buah 15,0000 15,0000 30.100,00 451.500,00 masker pernafasn pak 2,0000 2,0000 40.500,00 81.000,00 5 |,21 lLs Manajemen Mutu 1,0000 1,0000 Laporan Kendali Mutu (biaya jilid) unit 4,0000 4,0000 50.400,00 20 1.600,00 6 2.3.(lsl lm' Gorong-Sorong Kotak Beton Bertulog, ukurm dalm 100 m x 100 cm 26,4000 Pekerja (LOU hari 0,0410 1,0824 90.000,00 97.4t6,OO TukanE (w2l hari o,0246 o,6494 130.000,00 a4.427,20 Mandor (103) hari 0,0041 0,1082 145.000,00 15.694,80 Beton 30 Mpa (Ms9) M3 o,4622 t2,202t 3.574.294,49 43.6t3.827,35 Baja Tulangan {M39) btg 7,2633 19t,7523 15.098,00 2.895.075,49 4 ASB Konstruksi Jalan dan Jembatan - Halaman 80 NO. KODE I'RAIAIT KODE AATUAN KOEFIAIET AIfALIAA VOLI'UE IIARGA SATUAIT (Rpl JI'ULAH IIARGA (Rpl I 2 3 4 5 6 7 a 9 pasir urug (Er-24r) M3 o,2940 7,7616 269.OOO,O0 2.OA7.A70,40 Mat. Pilihm M3 3,1400 82,8960 413.000,o0 34.236.O48,00 Cetakm ukum l0O x 1O0 bh/M' 1,OOOC 26,40,00 313.500,00 8.276.400,OO lantai Keta Fc' l0 mpa m47 m3 o,1300 3,4320 1.528.635,69 5.246.277,69 Tmper Jm 3,8540 tol,7456 44.900,OO 4.56a.377,44 Flat Bed Truck Ell Jm o,o2a7 o,7577 470.000,oo 356.109,60 7 2.3. 22l, 1m' Salurm berbentuk U Tipe DS I l.1oo,0000 Pekerja (rc1) hari o,5737 63 r,0700 90.000,o0 s6.796.300,OO Tukang (102) hili 0,2869 3 l s,5900 r30.000,o0 4t.026.700,oo Mandor (Lo3) hari o,0574 63,1400 145.000,00 9.155.300,00 Semen (Ml2l zak o,9239 1.O16,3010 90.300,oo 91.771.980,30 Pasir Beton (M0r) M3 0,091s 100,6500 4r3.000,oo 41.568.450,00 Aggregat Kasar (M03) M3 o,tt92 1 3 1,1 200 512.000,o0 67.133.440,00 Fomworks (Ml9s) M2 1,0000 l. t00,0000 313.s00,o0 344.850.OO0,00 Air Ltr 27,75OO 30.525,0000 7,80 238.09s,00 Lantai Ket'a Beton Fc' 10 mpa M47 m3 0,0600 66,OOOO l.528.635,69 100.889.955,54 Plastik Cor roll 0,0560 61,6000 391.OO0,00 24.08s.600,00 Besi Beton (Ms7al kg 26,7232 29.395,5243 r5.098,OO 443.8t3.626,15 Kawat beton (M141 Ks o,0150 16,s000 30. r00,00 496.6s0,00 Beton Mixer {E06) Jam o,40 16 441,7600 86.400,00 38.168.064,00 Water Tanker (E23 Jam 0,0557 6t,2700 308.900,00 18.926.303,00 Concrete Vibrator (E2ol Jam 0,4016 44t,7600 61.300,00 27.O79.A8A,OO Exavator Elu JM o,0240 26,4000 7 r2.300,oo 18.804.720,00 8 3.1.(1) lm3 Galim Biasa 165,0000 Pekerja {rc1} hili o,0011 o, t8 l5 90.000,oo r6.335,00 Mmdor LO3 hili 0,0006 o,o990 145.000,00 14.355,00 Exmvator (E10) Jm o,0038 o,6270 7 12.300,00 446.6t2,10 )ump Truck butan 0,0007 0, l20r 15.434.900,00 1.854.096, l6 9 3.1.(e) lm3 Galian Perkerasan berbutir 825,0000 Pekerja (L0l ) hui 0,0060 4,9500 90.000,00 445.500,00 Mmdor {L03) hari 0,0010 o,8250 145.000,oo 119.625,OO Excavator (E10) Jam o,oo70 5,7750 7 12.300,OO 4. I 13.532,50 Dump Truck (Eoe) bulan o,ooo8 o,6215 15.434.900,00 9.592.323,9r 10 3.2.l.2a]. 1m3 Timbunan Pilihan dri sumber galian 336,5935 Peketa (Lo1) hari 0,0023 o,7742 90.000,00 69.674,86 Mandor (Lo3l hari 0,0006 o,2020 145.000,00 29.283,64 Bahan pilihm urug (M091/pasir (Ml6) M3 1,2000 403,9t22 399.000,oo 161.160.972,s9 wheel l-oader (E1s) Jam 0,0085 2,8610 295.500,00 845.438,75 Dump Truck (E09) bulan 0,0008 0,2608 15.434.900,00 4.O24.920,28 Motor Grader (E131 Jam 0,0040 1,3464 688.900,00 927.5t7,O8 Tmdem (E17) Jam 0,01 12 3,7698 400. r00,00 1.508.315,9 I water Tanker (E231 Jam 0,0341 tt,477A 308.900,0,o 3.545.504,37 11 3.3.(1) lm2 Penyiapm Badan Jalan 6.600,0000 Pekerja (1011 hili 0,0005 3,2456 90.000,00 292.rO7,20 Mandor (103) hari 0,0002 t,6228 145.000,00 23s.s08,s8 Motor Grader (Er3) Jam 0,0017 1t,2200 688.900,00 7.729.458,OO Tandem / Vibro Roller (El7) Jam o,0244 161,0400 400.100,00 64.432.tO4,OO L2 s.l.(u lm3 Lapis Pond6i Agregat Kelo A s50,0000 Pekerja (L0 1) hari 0,01 1 I 6,1050 90.000,o0 549.450,OO Mmdor hili 0,0014 o,7700 145.O00,00 1 11.650,00 Agegat A M26 M3 1,2890 708,9500 494.000,00 350.22 1 300,O0 wheel hader (Els) jam o,0087 4,785t 295.500,O0 1.4t3.9A6,17 Dump Truck (E0e) bulm o,00 r 3 o,698r 15.434.900,OO to.774.597,13 Motor Gmder (Er3l jam 0,0009 o,5074 688.900,00 349.572,O7 Vibratory Roller (El9a) jam 0,0097 5,355s 544.700,00 2.9t7.126,48 l3 6.r (l) I liter lapis Resap Pengikat - AsPal Cair/Emulsi 2.200,0000 Pekeda (L01) hari 0,0002 0,4400 90.000,00 39.600,00 Mandor (103) hari 0,0001 o,22OO 145.000,o0 3l Aspal Emulsi CSS-l M31a) Liter r,7167 3.776,7400 r6.900,00 63.826.906,00 Asp. Distributor/dPalt sPraYu E4t Jam 0,0002 0,4400 68.200,O0 Compressor E05 Jam 0,0007 1,5400 343.300,00 528.682,00 l4 6.1 (2al I liter Lapis Perekat Cair/Emulsi Aspal r.650,0000 Peke{a hari 0,0002 0,3300 90.000,00 29. Mandor (Lo3) hari 0,o001 0,1650 14s.000,00 Aspal Emulsi CRS-1 (M31a) Liter r,7167 2.832,5550 16.900,00 47.870.t79,50 Asp. Distributor E41 Jam 0,0002 0,3300 351.863,00 t16.t14,79 Compressor E05 Jam 0,0010 1,6500 343.300,00 Power Broom E03 Jam 0,0008 1,3200 l5 6.3(7al I ton Iaston tapis antara {AC-AQ hari l0 765,6000 16.603.373,49 Mesin 5- 10-20 M3 o,3720 2A4,7644 527.000,00 150.072.946,80 o,37 L9 2a4,7075 225.000,00 64.059.187,50 egr Rctr t"tesin 0 - 5 M3 4 ASB Konstruksi Jalan dan Jembatan - Halaman 8l 155.000,00 23.925,OO reKcl ta Mmdor o,o24t NO. KODE I'RAIAII KODE SATUAIT KOETIAIEIT ATALIAA voLUut HARGA SATUAII (Rpl JT'XIAH HARGA IRp) I 2 3 4 5 6 7 t 9 Semen lMl2l zk o,1918 146,8115 90.300,oo 13.257.O74,4A Aspal (M1o) KC 56,6100 43.340,6 160 16.900,00 732.456.4tO,40 Wheel loader El5 Jm 0,0054 4, I l06 295.500,O0 1.2t4.670,45 AMP E01 Jam o,o24r la,44a2 9.788.900,00 180.587.5t4,22 Genset E12 Jm o,o241 14,4482 57.142,86 1.o54.ta2,44 Dump Truck EO9 bulm o,0006 o,4539 15.434.900,00 7.OO5.7t2,26 Asphalt Finisher EO2 Jam o,oo83 6,3383 380.800,oo 2.413.6t6,37 Tmdem Roller ElTa Jam 0,0084 6,4544 400. r00,00 2.582.401,O3 P.'IYre Rotler E18 Jam 0,o056 4,2545 534.200,O0 2.272.732,94 Alat Bantu Ls l,oo00 765,6000 16 .3(6a) I ton Iaston Lapis Aus (AC-WC) 638,0000 Pekerja (ro1l hari o,0287 18,3042 90.000,00 t.647.379,80 Mandor (Lo3l hari 0,oo29 1,8502 l45.OOO,OO 268.279,OO Agr Pch Mesin 5-r0 & l0-15 M3 0,3206 204,5225 527.000,00 107.783.357,50 Agr Pch Mesin O - 5 (Me1) M3 0,4193 267,5033 22s.OO0,00 60.188.231,2s Semen M12) ?AK o,1936 t23,5423 90.300,00 1 1.155.87 1,50 Aspal (Mr0) Kg 62,3150 39.756,9700 16.900,00 671.892.793,OO wheel Loader El5 Jam o,oo54 3,4255 295.500,00 1.Ot2.225,37 AMP E0l Jam 0,020r L2,At12 9.788.900,OO 125.407.995,9A Genst Et2 Jam 0,o201 t2,8t12 57.t42,46 732.O7 t,t4 Dump Truck E09 bulan o,ooo4 o,2380 15.434.900,00 3.673.262,55 Asp. Finisher EO2 Jm o,0125 7,9920 380.800,00 3.043.369,99 Tandem Roller ElTa Jam 0,0128 8, l 384 400. loo,oo 3.256.193,44 P. Tyre Roller El8 Jam 0,0084 5,3645 534.200,00 2.46s.727,67 t7 7.1 lTal 1m3 Beton strukur, fc20 MPa 165,0000 Pekeia (Lo 1) hari 0,4590 75,73r5 90.000,00 6.4t5.434,77 Tlrkang (102) hari 0,6885 113,5972 130.000,00 14.767.642,OO Mandor (103) hari o,o574 9,4664 145.000,00 t.372.633,39 Semen (Mr2l za.k 5,4590 900,7350 90.300,00 81.336.370,50 Pasir Beton (M0ta) M3 0,6343 104,6669 413.000,00 43.227.424,24 Agregat lhsar M3 o,7922 130,7141 512.000,00 66.925.634,62 l(ayu Perancah lmbr 4,4444 733,3333 40.100,00 29.406.666,67 Paku Kg 0,230s 38,0292 30.600,00 l. r63.693,52 Air Ltr 190,5500 31.440,7500 7,80 245.237,85 Plastizier Kg 0,8189 r35,1 t03 69.400,OO 9.376.651,35 Concrete Mixer {E06) jam 0,4016 66,265t 86.400,00 5.72s.301,20 Concrete vibrator jam 2,4096 397,5904 61.300,00 24.372.289,16 Water TmkTruck E23l lam 0,0382 6,2952 308.900,00 1.944.58 1,33 18 7.9.lrl lm3 Pasangm Batu 778,2500 Pekeda Biasa (Loll hili 0,4590 357,2056 90.ooo,oo 32.148.506,89 Tukang lw2l hari o,ll47 89,2986 130.000,00 11.608.821,71 Mandor (Lo3) hari 0,0574 44,6493 145.000,00 6.474.150,57 Batu Kali (M02) M3 1,0238 796,7334 231.000,00 1a4.o45.424,06 Semen (rc) (M12) zak 3,4600 2.692,7450 90.300,00 243.154.873,50 Pasir (M0la) M3 o,4562 355,0430 4 13.000,00 146.632.766,12 Conc. Mixer (E06) jam 0,4016 3 12,5502 86.40O,00 27 .OO4.337,35 Water Tanker (E23) jam o,0014 1,0939 308.900,00 337.913,6s 18 e.2.l|l 1m2 Marka Jalan Temoplastik 79,2000 Pekeda Biae (101) hari o,0204 r,6156 m.000,00 145.404,48 Tukang lw2l hari 0,0025 o,2020 130.000,00 26.253,59 Mandor (rr3) hari 0,0025 o,2020 145.000,00 29.242,85 Cat Marka Thermoplastic (M17b Ks 0,0339 2,68r8 34.600,O0 92.789,54 Glass Bead (M34) Kg 0,4635 36,7092 I18.000,00 4.33r.685,60 Dump Truck (E08) bulan 0,0001 0,0078 r5.434.900,00 119.888,01 Thermoplastic Road Marking Machine (E8s) Jam 0,0178 1,4137 19 9.2.lsl 1 buah Patok Pengarah 184,0000 Pekeda Biasa (ml) hari 0,1795 33,0313 90.000,00 1 Tukang lw2l hari 0,0239 4,4042 130.000,00 572.542,97 Mandor (103) hari 0,0120 2,202t 145.000,00 319.302,81 Beton fc 20 MPa (M186 M3 0,0338 6,2rOO t.654.O19,26 to.271.459,60 Baja Tulangan M57a) btng o,7260 133,5790 1s.098,00 2.O16.776,t5 Cat lma2l E08 Kg bulan 0,1000 0,0005 18,4000 78.300,00 15.434.900,00 t.440. 307.269,75 5.346.559.9O2,70 5.3.1E.559.(rcO,(x)
8.Penlagkataa/Rehablltasl Jalan Lebar 3 Meter Ee4redl 4 Meter (Ilatar) Satuaa: Km 4 ro. KODE URAIAI| KODE 6ATUAIT KOEFISIEN AXALISA voLt uE (RPl JI'ULAH TIARCA IRPI I 2 3 4 5 6 7 I 1 t.2 lLs Mobilissi 1,0000 1,0000 Sewa Oiret si 14s61 + gudang (sewa standl m2 56,0000 56,0000 41.700,00 2.335.200,00 Demobilisasi ls 0,3000 0,3000 623.O40,OO 186.912,00 ASB Konstruksi Jalan dan Jembatan - Halaman 82 Dump Truck 0,0847 9 NO. KODE t RtrA.lt KODE SATUAil KOEFISIEI| AlfALIAA VOLI'UE IIARGA AATUAIT (RP, JUUI,AH IIARGA (Rpl I 2 3 4 5 6 7 a 9 Mobiliesi alat (swa truck dobet) EO6 ls l,OOOO 1,OOOO 6.230.400,O0 6.230.400,OO 2 1.8. 1 lLs Manajemen dan Keslmatan La.lu Lintas 1,0000 1,OOOO Pekeda (Flagmm) OH 130,OOO0 l43,OOOO 90.000,00 9.295.OOO,00 Koordinator / Pengatur OK 90.000,oo J 1.1 7. ( 1a) 1bh Pengujian PH buah 9,0000 9,0000 74.000,00 666.000,00 4 1,19 lLs Keslmatan dan Kesehatan Kerja 1,0000 1,0000 Penyiapan RKK (biaya jilidl ls 1,0000 1,0000 44.700,OO 44.700,O0 Personel K3 Konstruksi bulm 5,0000 5,0000 5. r32.750,00 25.663.7sO,00 Fasilitas ffia keshatan ls 1,0000 r,0000 39.400,00 39.400,00 sepatu boot kerja buah I s,0000 15,0000 162.000,00 2.430.000,o0 topi proyek buah 15,0000 15,0000 193.000,00 2.895.OOO,00 sarung tangm buah 15,0000 15,0000 30.100,00 45 1.500,00 masker pemafam pak 2,0000 2,0000 40.500,00 81.000,00 5 t,2t lLs Manajemen Mutu r,0000 1,0000 Laporan Kendali Mutu (biaya jilid) unit 4,0000 4,0000 50.400,00 201.600,00 6 2.3.(1s) 1m' Gorong-gorong Kotak Beton Bertulang, ukum dalm 1O0 cm x 100 cm 30,8000 Pekerja (Lo 1) hari 0,0410 1,262A 90.o00,00 l13.652,00 Tukmg u'o2l hari o,0246 o,7577 130.OOO,OO 98.498,40 Mmdor (Lo3) hari 0,0041 o,1263 145.OOO,00 r8.3r0,60 Beton 30 Mpa (Msel M3 o,4622 14,2358 3.574.294,49 50.882.798,58 Baja Tulangan {M391 bta 7,2633 223,7110 15.O98,00 3.377.544,O7 pasir urug (Er-24r) M3 o,2940 9,O552 269.000,00 2.435.848,80 Mat. Pilihan (M091 M3 3,1400 96,7120 413.000,00 39.942.0s6,OO Cetakil ukuran 1O0 x 100 bh/M' 1,0000 30,8000 313.500,00 9.655.800,OO l^antai Kerja Fc' 10 mpa m47 m3 0, I 300 4,0040 1.528.63s,69 6.120.657,30 Tamper (E2s) Jam 3,8540 114,7032 44.900,00 5.329.773,68 Flat Bed Truck El ll Jam o,o2a7 0,8840 470.000,00 4t5.46t,20 7 2.3..22t. lm' Saluril b€rbentuk U Tipe DS I l.100,0000 Pekerja (1011 hari o,5737 631,0700 90.000,00 56.796.300,OO Tukang lw2l hari o,2869 3 l 5,5900 130.000,00 41.026.700,OO Mandor (L03) hari 0,0574 63,1400 145.000,o0 9.155.300,00 Semen (M121 z.ak o,9239 1.0 16,30 r0 90.300,00 91.771.980,30 Pasir Beton M0r) M3 0,0915 100,6500 413.000,00 4 t.568.450,00 Aggregat Kasar (M03) M3 o,tt92 131,I200 512.000,00 67.133.440,O0 Formworks (Mlesl M2 1,0000 l.100,0000 313.500,00 344.850.000,00 Air (M170 Ltr 27,7500 30.525,0000 7,ao 238.095,00 latai Ketja Beton Fc' 10 mpa M47 m3 0,0600 66,0000 1.528.635,69 100.8E9.955,54 Plastik Cor roll 0,0560 61,6000 391.000,00 24.08s.600,00 Besi Beton (M57al kg 26,7232 29.395,5243 15.098,OO 443.813.626, l5 Kawat beton IM141 Kc 0,0150 16,5000 30.100,00 496.650,OO Beton Mixer (Eo6) Jm 0,4016 441,7600 E6.400,00 38.168.064,00 Water Tanker (E231 Jam 0,0557 6t,2700 308.900,00 18.926.303,00 Concrete Vibrator lEzol Jam 0,4016 441,7600 61.300,00 27.O79.848,OO Exavator (E 10) jam o,0240 26,4000 712.300,00 8 3. l.(1) 1m3 Galim Biasa l.309,OOO0 Pekerja (LO1) hari 0,0011 1,4399 90.000,00 129.59 1,00 Mandor (103) hili 0,0006 0,7854 145.000,00 r 13.883,00 Excavator (Er0) Jam 0,0038 4,9742 7 r2.300,00 3.s43.r22,66 Dump Truck (Eoe) bulan 0,0007 0,9530 15.434.900,00 14.709.t62,A8 9 3. l.(e) 1m3 Galian Perkerasm berbutir 660,0000 Pekerja (Lor) hili o,0060 3,9600 90.000,00 356.400,00 Mandor (r,031 hari 0,0010 0,6600 14s.000,00 95.700,00 Excavator (Er0) Jam 0,0070 4,6200 712.300,00 3.290.A26,OO ump Truck (E0e) bulan 0,0008 0,4972 15.434.900,00 7.673.8s9,13 l0 3.2.12a1 1m3 Timbunan Pilihan dari sumber galian 247,5711 Pekeda (Lorl hari 0,0023 0,5694 90.000,00 51.247,21 Mandor (ro3) hari 0,0006 0,1485 145.000,00 21.538,68 Bahm pilihtr (M(x))/PBir urut (M161 M3 1,2000 297,0453 399.000,00 I 18.537.023,05 wheel lrader (Elsl Jam 0,008s 2,ro44 295.500,00 I Dump Truck E09) bulan 0,0008 0, 19 t8 15.434.900,00 2.960.406,94 I Motor Grader E13) Jam 0,0040 0,9903 688.900,00 Tandem (E17) Jam 0,01l2 2,7728 400.100,00 l.109.395,62 Water Tanker (E231 Jam 0,0341 8,4422 308.900,00 2.607.7A7,27 l1 3.3.( 1) lm2 Penyiapan Badan Jalan 5.500,0000 Pekeda (101) hari 0,0005 2,7047 90.000,00 243.422,67 Mandor 103) hari 0,0002 r,3523 I I Motor Grader (E13) Jam 0,0017 9,3500 688.900,00 6.441 iffiern 7 vm-em7 viuro notter (El7) Jam o,0244 134,2000 400.100,00 ( ASB KonstruksiJalan dan Jembatan - Halaman 83 18.804.720.00 NO. KODE I'RAIAIT KODE SATUAIT KOEFIAIEI{ AXALIAA VOLT'UE IIARGA AATUAIT (Rpl JT'UI,AII IIARGA (Rpl I 2 3 4 5 6 7 t 9 12 s.1.(1) 1m3 lapis Pondasi Agregat Keld A 940,OOO0 Pekerja (Lo1) hili 0,o111 10,4340 90.ooo,oo 939.060,00 Mmdor (Lo3) hili o,oo14 1,3 160 l45.OOO,OO 190.820,oo Agregat A M26 M3 1,2890 1.2 r 1,6600 494.OOO,OO 598.560.040,OO Wheel Loader Er5) JM o,oo87 4,1781 29s.500,o0 2.416.630,90 Dump Truck (E0e) bulan o,0013 1,193 I 15.434.900,00 18.414.766,OO Motor Grader E13) lm o,0009 o,8673 688.900,OO 597.450,45 vibratory Rotler (E19a) jam 0,0097 9,1530 544.700,O0 4.985.634,35 13 6.1 (1) 1 liter Lapis Resp Pengikat - Aspal Cair/Emulsi 1.760,0000 Pekerja (Loll hari o,ooo2 0,3520 90.000,00 31.680,00 Mmdor (1031 hari o,o001 0,1760 145.000,00 25.520,00 Aspal Emulsi CSS-l (M31al Liter 1,7t67 3.O2t,3920 16.900,00 51.061.524,80 Asp. Distributor/ 6palt sprayer 841 Jm 0,0002 0,3s20 155.000,00 s4.560,00 Compressor E05 Jam 0,0007 1,2320 343.300,00 422.945,60 t4 6.r l2al I liter Lapis Perekat Cair/Emulsi Aspal l.320,O000 Pekeda (r,01) hili o,0002 o,2640 90.000,00 23.760,OO Mandor LO3l hili o,0001 o, I 320 145.000,o0 19.140,OO Aspal Emulsi CRS-I (M31a) Liter 1,7167 2.266,O440 16.900,00 38.296.143,60 Asp. Distributor E4l Jam 0,0002 o,2640 351.863,00 92.89r,43 Compres$r E05 Jm 0,0010 r,3200 343.300,00 453.156,00 Power Brmm E03 Jam 0,0008 1,0560 l5 6.3l7al I ton Ia.ston Lapis Antara (AC-BC) 6t2,4800 Pekeia ll,o1) hari o,2410 147,5855 90.ooo,oo 13.282.698,80 Mandor {LO3) hari o,o241 14,7586 145.000,o0 2.139.990,36 Agr Pch Mesin 5-10 & 10-20 (Me2l M3 o,3720 227,8147 527.OOO,OO 120.058.357,44 Agr Pch Mesin 0 - 5 (Merl M3 o,3719 227,7660 22s.000,00 51.247.350,00 S€men (M121 zak 0,1918 117,4492 90.300,o0 10.60s.6s9,58 Aspal (M10) Kc 56,6100 34.672,4928 16.900,oo s8s.965.128,32 wheel Loader E15 Jm 0,0054 3,2884 295.500,00 971.736,36 AMP E0l Jam o,o24t 14,7586 9.7E8.900,00 144.470.Ott,37 Genset El2 Jam o,o241 14,7586 57.t42,86 843.345,96 Dump Truck E09 bulan 0,0006 0,3631 15.434.900,O0 5.604.569,81 Asphalt Finisher EO2 Jam 0,0083 5,0706 380.800,00 1.930.893,10 Tandem Roller ElTa Jam 0,0084 5,1635 400.100,00 2.065.920,43 P. Tyre Roller El8 Jam 0,0056 3,4036 534.200,00 1.818.186,35 Alat Bantu Ls 1,0000 612,4800 t6 6.3(6a) I ton Laston Lapis Aus (AC-wCl 510,4000 Pekerja (Lo l) hari o,0287 t4,6434 90.000,00 1.317.903,84 Mmdor (r,o3l hari 0,0029 t,4802 145.000,00 2r4.623,20 Agr Pch Mesin 5-10 & 10-15 M92l M3 o,3206 163,6180 s27.000,oo 86.226.646,OO Agr Pch Mesin o - 5 (M9l) M3 0,4193 2t4,0026 225.000,00 48.150.585,00 Semen (Mr2) ak 0, r936 98,8339 90.300,00 a.924.697,20 Aspal (Ml0l KC 62,31 50 31.805,s760 16.900,00 537.514.234,40 wheel Loader El5 Jam 0,0054 2,7404 295.500,00 809.780,30 AMP 801 Jam 0,0201 1O,2490 9.788.900,00 r00.326.396,79 Genset Et2 Jam 0,020r to,2490 57.t42,86 s85.656,9 r Dump Truck E09 bulan 0,0004 o, I 904 15.434.900,OO 2.938.610,04 ,sp. Finisher EO2 Jam 0,0125 6,3936 380.800,00 2.434.695,99 Tandem Roller E17a Jam 0,0128 6,5108 400.100,00 2.604.954,75 P. TYre Roller El8 Jam 0,0084 4,2916 534.200,00 2.292.582,14 t7 7.r l7^l lm3 Beton strukur, fc20 MPa 165,0000 (LOl) hari 0,4590 75,7315 r13,5972 90.000,00 I ,77 t4.767.642,00 Mandor (103) hari 0,0574 9,4664 145.000,00 1.372.633,39 Semen (M121 zok 5,4590 900,7350 90.300,00 8l Pasir Beton (M01a) M3 0,6343 104,6669 413.000,00 43.227 gregat Kasr M3 o,7922 130,7141 5 Kayu Perancai lmbr 4,4444 733,3333 40.100,00 Paku Kg 0,2305 38,0292 l.163.693,52 245.237,85 Air Ltr 190,5500 31 7500 7,80 Plastizier Kg 0,8 r89 1 35,1 69.400,00 9.376.651,35 Concrete Mixer (E061 jam 0,4016 66,2651 Concrete vibrator jam 2,4096 397,s904 1.944.581,33 l8 7.e.(r) 1m3 hri M3 tl47 60s,0000 .000,oo 90. 24.991.772,14 9.O24.525,71 5.032.908,57 143.O74.181,25 189.024.990,00 1 13.990.136,2 1 18 1m2 Pasir Conc. Tanker (M0la) (E06) 192!!_ (10 I) hari u,rooz 0,4016 0,0014 L 0,0204 242,9719 0,8504 79,2000 1,6156 86.400,00 308.900,00 90.000,00 20.992.771,08 262.689,06 145.404,48 0 ASB Konstruksi Jalan dan Jem6a1a11 - 1{alaman 84 5.725.301,20 @ Truck Pasangan Batu zak M3 jam jam NO. KODE URAIAIT KODE SATUAII KOEFIAIEN AIALIAA VOLI'UE IIARGA BATUAIT (Rpl .,UilL,IIH HARGA (Rpl I 2 3 4 5 6 7 t 9 Tukmg u,o2l hui o,o025 o,2020 130.o00,00 26.253,59 Mandor (LO3) hari o,0025 o,2020 145.000,oo 29.282,8s Cat Marka Themoplastic (Ml7bl KC o,0339 2,68r8 34.600,00 92.789,54 Glass Bead (M341 Kc o,463s 36,7092 r 18.000,oo 4.331.685,60 Dump Truck bulm o,0001 o,0078 r5.434.900,OO 119.888,01 Themoplastic Road Milkin8 Machine (E8s) Jm o,o 174 r,4137 l9 e.2.(51 I buah Patok Pengarah 183,0000 Pekerja Biasa (101) hri o,1795 32,8518 90.000,00 2.956.662,65 Tukmg ln2l hari o,0239 43402 130.000,oo 569.431,33 Mmdor (LO3) hari 0,0 r20 2,t901 145.000,00 3t7.567,47 Beton fc 20 Mpa (M1861 M3 0,0338 6,1763 1.654.019,26 10.215.636,45 Baja Tulangan (Ms7al btnS o,7260 132,8531 r5.098,00 2.OO5.815,41 Cat lma2l KC 0, r000 18,3000 78.300,00 1.432.890,00 Dump Truck E08 bulan o,ooo5 o,0842 15.434.900,OO 1.300.165,o2 .rn6lq$ Totd 4.979.U2.5r)|r,L2 Pcnbulatu 4.979.342.OOO,OO
9.Peaingkataa/Rehablltasl Jalaa Lebar 3 Meter treqjadl 5 Metcr (Detar! Satuaa: Km 4 NO. KODE URAIAIT KODE SATUAIT KOEFIAlET AITALTAA VOLUUE IIARGA AATUAIT (Rpl JI'ULAH IIARGA (Rpl I 2 3 4 5 6 7 E 9 I 1.2 1Ls Mobitisasi 1,0000 1,0000 Sewa Direksi Keet + gudang (swa stand) m2 s6,0000 56,0000 41.700,00 2.335.200,OO Demobilisasi ls 0,3000 0,3000 623.040,00 186.9r2,00 Mobilissi alat (swa truck dobel) E06 ls 1,0000 1,0000 6.230.400,OO 6.230.400,00 2 1.8. 1 lLs Manajemen dan Keslmatff Lalu Lintas 1,0000 1,0000 P€keda (Flagman) OH 130,oo00 143,0000 90.000,00 9.295.000,00 Koordinator / Pengatur OK 90.000,00 J 1.17.( 1a) lbh Pengujian PH buah 9,0000 9,0000 74.000,00 666.000,00 4 I, l9 lLs Keslamatan dan Kesehatan Kerja 1,0000 1,0000 Penyiapm RKK (biaya jilidl ls 1,0000 l,oooo 44.700,00 44.7@,OO Permnel K3 Konstruksi bulan 5,0000 s,0000 5.132.7s0,00 25.663.750,00 Fasititas sarana kesehatan ls 1,0000 1,0000 39.400,00 39.400,00 sepatu boot keda buah 1s,0000 1s,0000 162.OOO,00 2.430.O0O,00 topi proyek buah 1s,0000 1s,0000 193.000,00 2.895.000,00 erung tangan buah 1s,0000 1s,0000 30. I 00,00 45 1.500,00 masker pema-fasan pak 2,0000 2,0000 40.500,00 81.000,oo 5 t,2l lLs Manajemen Mutu 1,0000 l,oo00 Laporan Kendali Mutu (biaya jilid) unit 4,0000 4,0000 s0.400,00 201.600,o0 6 2.3.( ls) 1m' Gorong-gorong Kotak Beton Bertulang, ukuran dalam l0O cm x 10O cm 30,8000 Pekeda LOl) hari 0,0410 1,2628 90.000,00 I 13.652,00 Tukmg n2l hari o,0246 o,7577 130.000,00 Mandor (r,03) hili 0,0041 0, r263 145.000,00 Beton 30 Mpa (Msel M3 o,4622 14,2358 3.574.294,49 50.882.798,58 Baja Tulangan (M39) bta 7,2633 223,7 tto 15.O98,00 3.377.5a8,O7 pasir urug (El- 24rl M3 o,2940 9,0552 269.000,00 2.435.848,80 Mat. Pilihan (M09) M3 3,1400 96,7120 413.000,oo 39.942.056,O0 cetakan ukuran 1oo x 100 bh/M' 1,0000 30,8000 313.soo,00 9.655.800,00 Lantai Kerja Fc' 10 mPa m47 m3 0,1300 4,0040 1.528.635,69 6.120.657,30 amper 02s) Jam 3,8540 118,7032 44.900,00 5.329.773,64 Flat Bed Truck (E1r) Jam o,o2a7 0,8840 415.461,20 7 2.3.1221 lm' Saluran berbentuk U Tipe DS I 1.100,0000 Pekerja (101) hari o,5737 63 1,0700 90.000,00 56.796.300,00 Tukang w2l hari o,2a69 315,5900 I 41.026.700,00 Mandor lL03) hari 0,0574 63,1400 145.000,00 9.155. Semen (M12) zak o,9239 1.016,3010 ,980,30 4 1.568.450,00 Pasir Beton (M01) M3 0,0915 100,6500 4 Aggregat Kasar (M03) M3 o,Ll92 13 l, 1200 512.OOO,00 67.1 Formworks (Mr9s M2 1,OO00 1. l00,ooo0 3 13.500,00 344.850.000,o0 Air (M1701 Ltr 27,750,0 30.525,0000 7,AO Lantai Ke4a Beton Fc' 10 mpa M47 m3 0,0600 66,0000 1.528.635,69 100.889.955,s4 Plastik Cor roll 0,0560 61,6000 391 15 Besi Beton (M57a) ks 26,7232 29.395,5243 443.8 ASB Konstruksi Jalan dan Jembatan - Halaman 85 98.498,40 18.310,60 470.000,00 90.300,0 15.098,00 NO. KODE I'RAIAIT KODE SATUAIT KOEFISIEIT AXALISA VOLI'UE IIARGA SATUAII (Rpl .,UIIAII HARGA (RPl 1 2 3 4 5 6 7 8 9 Kawat beton (Mr4) Kg 0,o t 50 16,5000 30. loo,oo 496.650,OO Beton Mixer Jm o,4016 441,7600 E6.400,OO 38.168.064,00 Water Tanker Jam 0,0557 6r,2700 308.900,00 18.926.303,OO Concrete Vibmtor (E2o) Jam 0,4016 44t,7600 61.300,oo 27.079.888,OO Envator (E1ol Jm o,0240 26,4000 712.300,00 1A.804.720,OO 8 3.1.(l) lm3 Galian Bias 1.694,0000 Pekerja (L0l) hui o,oo11 1,8634 90.000,o0 167.706,OO Mandor (Lo3) hari 0,0006 1,0164 r45.000,00 t47.378,OO Excavator (E10) Jam o,0038 6,4372 712.300,00 4.585.2 17,56 Dump Truck bulan 0,0007 1,2333 15.434.900,OO 19.03s.387,2s 9 3.1.(e) 1m3 Galiil Perkerasan berbutir 825,0000 Pekerja (Lo 1) hari 0,0060 4,9500 90.000,0( 445.500,OO Mandor (LO3 hari 0,0010 0,8250 145.000,00 119.625,OO Excavator (Elo) Jam 0,0070 5,7750 7t2.30,0,oo 4. r 13.532,50 Dump Truck (E0e) bulan 0,0008 0,621s 15.434.900,OO 9.592.323,9r 10 3.2.12al' 1m3 Timbunm Pitihan dari sumber galim 247,4988 Pekeda L0l hari 0,o023 o,5692 90.o00,oo 51.232,26 Mandor (1031 hari o,0006 o,1485 l45.OO0,OO 2t.532,40 Bahan pilihm urug (M091/pasir (M16) M3 1,2000 296,9986 399.000,00 I 18.502.435,02 wheel Loader (E1sl Jam 0,oo85 2,to37 295.500,00 62 1.655,16 Dump Truck (Eoel butan 0,0008 0,1917 15.434.900,00 2.9s9.543, l6 Motor Grader (E131 Jam 0,oo40 0,9900 688.900,00 642.0,07,75 Tandem (E171 Jam 0,0r l2 2,7720 400.100,00 1.109.071,91 water Tanker (E23) Jm 0,0341 a,4397 308.900,oo 2.607.026,35 11 3.3.(r) lm2 Penyiapan Badan Jalan 6.600,0000 Peke{a L0r hari 0,oo05 3,2456 90.oo0,oo 292.rO7,20 Mildor (Lo3) hari o,o002 1,6228 145.000,00 235.308,58 Motor Gmder (E13) Jam o,00 17 1t,2200 688.900,OO 7.729.458,OO Tandem / vibro Roller (EL7 Jam o,0244 l6 1,0400 400. loo,oo 64.432.1O4,OO t2 s.1.(ll 1m3 Lapis Pondasi Agregat Kelas A L437,5000 Pekerja (L0 1) htri 0,01 I I 15,9563 90.0oo,00 1.436.062,50 Mandor (103) hari o,o0l4 2,O125 145.000,00 291.812,50 Agregat A M26 M3 1,2a90 1.852,9375 494.000,00 915.35 1.125,00 wheel Loader (Ers) jam 0,oo87 12,5064 295.500,00 3.695.645,67 Dump Truck ) bulan 0,0013 1,8245 15.434.900,00 28. r60.878,86 Motor Grader (El3) Jam 0,0009 1,3263 688.900,OO 9t3.654,28 vibmtory Roller (E19al Jam 0,0097 13,9973 544.700,OO 7.624.307,85 13 6.1 (l) I liter Lapis Resap Pengikat - Aspal Cair/Emulsi 2.200,ooo0 kerja (Lo1) hili 0,0002 0,4400 90.000,00 39.600,00 Mandor lL03) hari 0,0001 o,2200 145.000,00 3l.900,00 Aspal Emulsi CSS-1 (M31a Liter t,7167 3.776,7400 16.900,00 63.826.906,00 Asp. Distributor/aspalt sPrayer E41 Jam 0,0002 0,4400 155.OOO,00 68.200,00 ompressor E05 Jam 0,0007 1,5400 343.300,OO s28.682,00 l4 6.1 l2al I liter Lapis Perekat Cair/Emulsi Aspal l 650,0000 Pekc{a hili 0,0002 0,3300 90.000,oo Mmdor (Lo3) hili 0,ooor 0,1650 145.000,00 23.925,OO Aspal Emulsi CRS-l Liter 1,7 t67 2.832,5550 r6.900,00 47.A70.179,50 Asp. Distributor 841 Jam 0,0002 0,3300 351.863,OO I 16.1 14,79 Compressor E05 Jm 0,ool0 l,6s00 343.300,00 566.445,00 Power Broom E03 Jm 0,0008 1,3200 15 I ton taston Lapls entara 1AC-BC; 765,6000 Pekeda (L0l) hari o,24lo r84,4819 90.000,00 Mandor (1031 hari o,o24l t8,4482 145.000,00 5-10 & 10-20 M3 o,3720 2a4,7684 s27.000,00 Agr Pch Mesin 0 - 5 (Mel) M3 o,37 l9 284,7075 225.O00,00 64.059.187,50 Semen zak 0,1918 146,8115 90.300,00 13.2s7.O74,48 Aspal (Mr0) 56,6100 43.340,6160 16.900,00 732.456.41O,40 Wheel l-ader El5 Jam Jam 0,00s4 4, I 106 295.500,00 9.788.900,00 1.214.670,45 Genset Et2 Jam 0,0241 18,4482 57.142,46 t.o54.182,44 Dump Truck E09 bulan 0,0006 0,4539 15.434.900,00 7 Asphalt Finisher EO2 Jam 0,0083 6,3383 380.800,00 2.413.6 Tandem Roller E17a Jam 0,0084 o,0056 6,4544 400.1oo,o0 2.272. Atat Bantu Ls 1,0000 765,6000 l6 6.3(6a) 1 ton Uaston Lapis aus 1AC-WC; 90.000,00 t.647.379,80 Pekeda {LOr) hari o,o2a7 26A.279,OO Mandor (103) hari 0,o029 I,8502 egr Pch l"tesin 5-10 & 10-15 M3 o,3206 204,s225 527.000,00 t07 188.231,25_ Pch trtes'in o - 5 M3 0,4193 22s.000,00 S€men (M12) ?* 0,1936 r23,5423 90.300,00 11. ( ASB Konstruksi Jalan dan Jembatan - Halaman 86 .3(7a) KC AMP EO1 o,o24L 18,4482 4,2545 638,0000 18,3042 NO. KODE I'RAIAIf KODE SATUAIT KOEFISIElt A.ITALIAA VOLUUE IIARGA SATUAIT (RPl JUUI.AII IIARGA (RPl I 2 3 4 5 6 7 E 9 Aspal (M10) Ks 62,3 150 39.756,9700 16.900,00 671.A92.793,OO wheel lrader El5 Jm 0,o054 3,4255 295.500,OO t.o12.225,37 AMP EO1 Jm 0,o20 r L2,At12 9.788.900,OO 125.407.995,98 Gen*t Et2 Jam 0,0201 t2,Ett2 57.142,86 732.O71,t4 Dump Truck E09 bulm 0,ooo4 o,2380 15.434.900,00 3.673.262,5s Asp. Finisher EO2 Jm 0,o125 7,9920 380.800,00 3.043.369,99 Tmdem Roller E17a Jm 0,o128 8, l 384 400. loo,00 3.256.193,44 P. Tyre Roller El8 Jam 0,o084 5,3645 534.200,00 2.465.727,67 17 7.1 lTal lm3 Beton strukur, fc2o MPa 165,0000 Peke{a (r,o1) hari 0,4590 75,7315 90.000,00 6.815.834,77 TUkang (t o2l hari 0,6885 rr3,5972 130.000,00 14.767.642,00 Mandor (Lo3) hari o,o574 9,4664 145.OOO,00 1.372.633,39 Semen (M12) zak 5,4590 900,7350 90.300,oo 81.336.370,50 Pasir Beton (M01a) M3 0,6343 104,6669 4l3.OO0,OO 43.227.424,28 ,gregat Kasar M3 o,7922 130,714 1 s12.000,00 66.925.638,62 Kayu Permcah lmbr 4,4444 733,3333 40.100,00 29.406.666,67 Paku Ks 0,230s 3A,0292 30.600,00 l. r63.693,52 Air Ltr r90,5500 31.440,7500 7,80 245.237,A5 Plastizier Kg 0,8189 135, r 103 69.400,00 9.376.651,35 Concrete Mixer (E061 Jam 0,4016 66,265r 86.400,00 5.725.301,20 Concrete vibmtor lam 2,4096 397,590,4 61.300,00 24.372.289,16 Water TankTruck (E23) jm o,o382 6,29s2 308.900,00 1.944.581,33 18 7.e.lLl lm3 Pasangan Batu 605,0000 Pekerja Biasa {101) hari 0,4590 277,6A64 90.000,00 24.99t.772,14 Tukang lLo2l hili o,ll47 69,4194 130.000,00 9.O24.525,71 Mandor (Lo3) hari o,o574 34,7097 r45.000,00 5.O32.908,57 Batu Kali (M02) M3 1,O238 6r9,3688 231.OOO,00 143.074.181,25 Semen (PC) (M12) ak 3,4600 2.093,3000 90.300,00 189.024.990,00 Pasir (Mola) M3 o,4562 276,OO52 413.000,oo I 13.990.136,2 r Conc, Mixer (Eo6l jam 0,4016 242,97t9 86.400,00 20.992.77r,O8 water Tanker (E23) Jam 0,00 r4 o,8504 308.900,00 262.689,06 l8 e.2.lrl lm2 Marka Jalan Termoplastik 79,2000 Pekeda Bias (LOl) hari o,0204 1,6156 90.000,00 145.404,48 Tukang Lo2',t hari 0,o025 o,2020 l30.ooo,oo 26.253,59 Mmdor (Lo3) hri o,oo25 o,2020 l45.OOO,O0 29.242,45 Cat Marka Themoplastic (Ml7b) KC 0,0339 2,6818 34.600,00 92.789'54 Gtass Bead (M34) Kg 0,4635 36,7092 I18.000,oo 4.331.685,60 Dump Truck (E081 butm 0,ooot 0,oo78 15.434.900,00 119.888,01 Thermoplastic Road Milking Machine (E8sl Jam o,o 178 1,4137 l9 9.2.(s) I buah Patok Pengarah 183,0000 Pekeda Biasa (L0ll hari 0,1795 32,8518 90.000,o0 2.956.662,65 Tukang lto2l hari 0,0239 4,3802 130.000,oo 569.431,33 Mmdor (103) hili 0,0120 2,1901 145.000,00 3t7.567,47 Beton fc 20 Mpa (Mr86) M3 0,o338 6,t763 l.654.019,26 10.215.636,45 Baja Tulangm M57a) btng o,7260 132,853 I 15.098,00 2.OO5.815,41 Cat (ma2) Kg 0,1000 18,3000 78.300,00 1.432.890,00 Dump Truck E08 bulm 0,000s o,0,842 15.434.900,OO 1.300.165,02 s.7a7.54p.25,3,r7 5.787.54{r.(xx),q' ( ASB Konstruksi Jalan dan Jembatan - Halaman 87 1O. Pemeliharaan Berkala Jalaa Lebar 9 Meter Satuan: Km NO. KODE I'RAIAIT KODE SATUAIT KOpnalEI{ AilALIAA VOLI'UE IIARGA SATUAIT (RPl I,UUI.AH IIARGA (Rpl 1 2 3 4 5 6 7 t 9 1 1.2 lLs Mobilisasi 1,0000 l,oo00 Sewa Direksi Keet + gudmg (wa standl m2 56,OOOO s6,oooo 41.700,00 2.335.200,OO Demobiliesi ls 0,3000 0,3000 623.040,00 186.912,00 Mobilisasi alat (swa truck dobel) EO6 ls 1,0000 1,OO00 6.230.400,00 6.230.400,00 1.8.1 lLs Mmajemen dm Keselamatan talu Lintas l,OOOO l,oooo Pekerja (Flagmm) OH l56,OOOO l7 I ,6000 90.ooo,00 1 1.154.000,00 Kmrdinator / Pengatur OK 90.000,oo J 1.17.(1a) tbh Pengujian PH buah 9,0000 9,0000 74.000,0o 666.000,oo 4 1,19 lLs Kes€lamatan dan Kes€hatan Kerja 1,0000 I,OOOO Penyiapan RKK (biaya jilid) ls 1,0000 1,0000 44.700,OO 44.700,OO Persnel K3 Konstruksi bulan 3,0000 3,OOOO 5. r32.750,OO r5.398.250,00 Fasilitas sarana kesehatan ls 1,0000 1,0000 39.400,00 39.400,OO sepatu boot keda buah 15,0000 15,0000 162.000,00 2.430.000,00 topi proyek buah 15,0000 1s,0000 193.000,00 2.895.000,00 sarung tangan buah 15,0000 15,0000 30.100,00 451.500,00 masker pemafasan pak 2,0000 2,0000 40.500,00 8r.000,00 5 1,21 lLs Manajemen Mutu 1,0000 l,ooo0 Iaporan Kendali Mutu (biaya jilid) unit 3,0000 3,OOOO 50.400,oo 151.200,00 6 2.3.( 1s) 1m' Gorong-Sorong Kotak Bcton Bertuleg, ukurm dalm 100 cm xlO0m 26,4000 Pekerja (L01) hari 0,0410 1,0824 90.000,00 97.416,00 Tukang (w2l hari o,0246 o,6494 130.000,00 44.427,2O Mandor (L03) hari 0,oo4l 0, lo82 145.000,00 15.694,80 Beton 30 Mpa (Mse) M3 o,4622 12,2021 3.574.294,49 43.613.827,35 Baja Tulangan btg 7,2633 191,7523 15.098,00 2.895.O75,49 paslr urug (Er-24r) M3 o,2940 7,7616 269.000,00 2.O87.470,40 Mat. Pilihm (M0el M3 3,1400 82,8960 413.000,00 34.236.048,00 Cetakan ukuran 100 x 100 bh/M' r,0000 26,4000 313.500,00 4.276.400,OO lantai Kerja Fc' l0 mpa m47 m3 0,1300 3,4320 r.528.635,69 5.246.277,69 amper (E2s) Jam 3,8540 1Ot,7456 44.900,OO 4.56a.377,44 Flat Bed Truck (El r) Jam o,0287 o,7577 470.000,o0 356.r09,60 7 2.3.122l, lm' Sa.lurm berbentuk U Tipe DS I l r0,000c Pekerja (L0 l) hari o,5737 63, r070 90.000,00 5.679.630,00 Tukang lw2l hari o,2469 3 1,5590 130.000,00 4.t02.670,OO Mandor (Lo3l hari 0,0574 6,3140 145.000,00 915.530,00 S€men (M121 ak 0,9239 101,6301 90.300,00 9.t77.r98,O3 Pasir Beton (M0l) M3 0,0915 r0,0650 4 13.000,00 4.156.845,00 Aggregat Kasar (M03) M3 o,tt92 13, I 120 s 12.000,00 6.713.344,00 Formworks (M19s) M2 1,0000 l 10,0000 3 13.500,oo 34.485.000,00 Air M170) Ltr 27,7500 3.052,5000 7,80 23.809,50 IEntai Keda Beton Fc' l0 mpa M47 m3 0,0600 6,6000 1.s28.63s,69 9.446.4t3,79 Plastik Cor roll 0,0s60 6,1600 391.000,00 2.40E.560,O0 Besi Beton (M57a) ke 26,7232 2.939,5524 15.098,00 44.38t.362,62 Kawat beton (M14) Kg 0,0150 1,6500 30.1o0,00 49.665,00 Beton Mixer (806) Jam 0,4016 44,1760 86.400,O0 3.816.806,40 water Tanker (E23) Jam 0,0557 6,1270 308.900,00 1.892.630,30 Concrete Vibrator (E20) Jam 0,4016 44,t760 61.300,00 2.707.984,40 Exavator (Er0) iam o,0240 2,6400 712.300,oo L.8AO.472,OO 8 3.1.(ll 1m3 Galian Biasa r63,9660 Pekerja (L0ll hari 0,0011 0,r804 90.000,00 t6.232,63 Mandor (1031 hari 0,0006 0,0984 145.000,00 14.265,O4 Excavator El0l Jam 0,o038 o,623t 712.300,00 443.813,33 Dump Truck (E091 bulan 0,0007 0,1 194 15.434.900,00 1.842.477,t6 9 3.1.(el lm3 Galian Perkerasan berbutir 445,5000 Pckeda (Lo1l hari o,0060 2,6730 90.000,00 240.570,OO Mandor (Lo3l hari o,0010 0,4455 145.000,00 64.597,50 Excavator E10) Jam 0,0070 3, I 185 712.300,00 2.221.307,55 Dump Truck E09) butan 0,0008 0,33s6 15.434.900,00 5.179.854,91 10 3.2.(2al 1m3 Timbunm Pilihm dui sumber calid Pekerja (L0r) hari 0,0023 90.000,00 Mmdor (Lo3) hari 0,0006 145.000,00 Bsha pilihn (Mog)/padr uru8 (M16) M3 r,2000 399.000,00 Wheel lrader (Els) Jm 0,0085 295.500,00 Dump Truck (E09) bulan 0,0008 15.434.900,00 Motor Grader (Er3) Jam 0,0040 688.900,00 Tandem (E 17) Jam 0,0112 400.100,00 water Tanker (E23) Jam 0,0341 308.900,00 ( ASB Konstruksi Jalan dan Jembatan - Halaman 88 ro. KODE I'RAIA.IT KODE AATUIUT KOEFIArcT AIfALIAA vol,t uE IIARGA AATUAI| (Rpl WUI.AH HAR,OA IRPI I 2 3 4 5 6 7 a 9 It 3.3.(1) lm2 Penyiapil Badm Jalm 1 1.000,0000 Pekeda (ro1l hari 0,ooo5 5,4094 90.000,00 486.845,34 Mandor (ro3) hari 0,o002 2,7047 145.000,00 392.1AO,97 Motor Grader (E13) Jm 0,oor7 18,7000 688.900,OO 12.882.430,OO Tmdem / Vibro Roller (E17l Jm o,0244 268,4000 400.100,00 107.386.840,00 12 s.1.(11 lm3 lapis Pondsi furegat Kcld A 297,OOOO Pekerja (L0 1) hili o,011I 3,2967 90.ooo,oo 296.703,OO Mmdor (L03) hari 0,0014 0,4158 l45.OOO,O0 60.29 r,O0 Bregat A M26 M3 t,2a90 382,8330 494.000,00 189.1 t9.502,00 wheel Lader (Ers) jam o,0087 2,5839 295.500,00 763.552,53 Dump Truck (E09) bulm 0,oo13 o,3770 15.434.900,00 5.818.282,45 Motor Grader (E13) jam o,ooo9 o,2740 688.900,OO 144.768,92 Vibratory Roller (E1gal jam 0,0097 2,8920 544.700,OO 1.57s.248,30 l3 6.1 (11 I titer lapis Resap Pengikat Cair/Emulsi Aspa.l 1. I88,OOO0 Pekerja (Lol) hili 0,0002 o,2376 90.000,oo 21.384,00 Mmdor (Lo3) hari 0,0001 o,1 188 145.O00,00 17.226,00 Aspa.l Emulsi CSS-1 (M3lal Liter 1,7 t67 2.O39,4396 16.900,00 34.466.529,24 Asp. Distributor/ spalt sprayer E4L Jm o,0002 o,2376 I55.000,00 36.828,00 Compressor E05 Jam o,0007 0,8316 343.300,00 285.488,2A l4 6.r l2al 1 liter tapis Perekat - Aspa.l Cair/ Emulsi 3.663,0000 Pekeda (Lo1) hari o,0002 o,7326 90.000,00 65.934,00 Mandor (LO3) hili 0,0001 0,3663 145.000,00 53. I 13,50 Aspal Emulsi CRS-1 (M3la) Liter 1,7 t67 6.288,272r 16.900,00 106.27t.798,49 .sp. Distributor E4L Jam 0,0002 o,7326 351.863,00 257.774,83 Compressor E05 Jam 0,0010 3,6630 343.300,00 t.257.50?,90 Pow€r Broom EO3 Jam 0,0008 2,9304 15 6.3I7al 1 ton Laston Lapis Antara (AC-BC) 1.378,0800 Peke{a (L01) hili o,24to 332,0,675 90.oo0,oo 29.8A6.O72,29 Mandor (Lo3) hari o,o24l 33,20,67 r45.000,00 4.814.978,3t Agr Pch Mesin 5-10 & lO-20 (Me2l M3 o,3720 512,5831 527.OOO,00 270.131.304,24 Ag Pch Mesin 0 - 5 (M911 M3 0,3719 512,4735 225.000,00 I 15.306.537,50 Semen (Ml2) ?AK 0,1918 264,2606 90.300,00 23.862.734,06 Aspal (Ml0l KC 56,6 100 78.0 13, lO88 r6.900,00 1.318.421.538,72 Wheel Loader E15 Jam 0,0054 7,3990 295.500,00 2. r86.406,80 AMP E01 Jam o,o24t 33,2067 9.788.900,00 32s.0s7.525,59 Genset EL2 Jam o,o24l 33,2067 57.142,86 r.897.528,40 Dump Truck E09 butan 0,0006 0,8170 r5.434.900,00 12.6to.2a2,06 Asphalt Finisher EO2 Jam 0,oo83 I I,4089 380.800,00 4.344.5O9,47 Tandem Roller ElTa Jam 0,o084 t 1,6t79 400.100,00 4.648.321,46 P. lyre Roller E18 Jam 0,0056 7,6580 534.200,00 4.O90.9r9,29 Alat Bantu Ls 1,0000 1.378,0800 16 6.3(6a) I ton Laston lapis Aus (AC-WC) l.148,4000 Pekeia (Lo 1) htri o,0287 32,9476 90.ooo,oo 2.96s.243,@ Mandor (Lo3l hari 0,o029 3,3304 145.000,00 442.902,20 Agr Pch Mesin 5-10 & 10-15 M92l M3 o,3206 368,140s 527.000,00 194.010.043,50 Ag Pch Mesin o - 5 (M91) M3 0,4193 48 1,5059 225.000,00 108.338.816,25 Semen {Ml2) z* o,1936 222,3762 90.300,oo 20.080.568,69 Aspal (Ml0l Kg 62,3 150 71.562,5460 16.900,o0 1.209.407.O27,40 wheel Loader Et5 Jam o,0054 6,1658 295.500,00 1.822.OOs,67 AMP E0r Jam o,0201 23,0602 9.788.900,00 225.734.392,77 Genset E12 Jam 0,o201 23,0602 57.t42,46 t.317.72a,O6 Dump Truck E09 bulan 0,0004 o,4284 15.434.900,O0 6.6t1.472,54 Asp. Finisher EO2 Jam 0,0125 14,3857 380.800,oo 5.478.065,98 Tandem Roller ElTa Jm 0,0128 14,6492 400.100,00 5.86r.148,20 P. Tyre Roller El8 Jam 0,0084 9,656r 534.200,O0 s. 1s8.309,8 I t7 7.1 lTal 1m3 Beton strukur, fc20 MPa 16s,0000 Pekerja (Lo 1) hari 0,4590 75,7315 90.000,o0 6.415.834,77 Tukang lw2l hari 0,688s 1t3,5972 130.000,oo 14.767.642,OO Mandor r,03) hari 0,0574 9,4664 r45.000,00 1.372.633,39 Semen {Ml2l zak 5,4590 900,7350 90.300,00 8r.336.370,50 Pasir Beton (M0la) M3 0,6343 1O4,6669 413.000,00 43.227.428,28 Agregat Kasar M3 o,7922 130,7 l4 1 512.000,00 66.925.63A,62 Ihyu Perancah lmbr 4,4444 733,3333 40.100,00 29.406.666,67 Paku Kg 0,2305 34,0292 30.600,00 1.163.693,52 Air Ltr 190,5500 3 1.440,7500 7,AO 245.237,85 Plastizier Ks 0,8189 r3s, I 103 69.400,00 9.376.651,35 Concrete Mixer (E06) jam 0,4016 66,2651 86.400,00 5.725.301,20 Concrete vibrator Jam 2,4096 397,5904 61.300,00 24.372.289,16 water TankTruck (E23) Jam 0,0382 6,2952 308.900,00 1.944.581,33 l8 e.2.ltl 1m2 Marka Jalan TemoPlastik 50 1,6000 Pekeda Bias (r,o1) hari o,0204 to,2322 90.000,00 920.895,01 Tukang (w2l hari 0,0025 t,2790 130.000,00 Mandor (103) hari 0,0025 1,2790 t45.000,00 185.458,02 Gtilarka Thermoplastic Ml7bl Kg 0,0339 16,9846 34.600,00 s87.667,35 Glass Bead (M34) Kg 0,4635 232,49t6 I18.000,00 27.434.0O4,4O Dump Truck (E081 bulan 0,0001 15.434.900,00 4 ASB Konstruksi Jalan dan Jembatan - Halaman 89 o,0492 I{o. KODE I'RAIAIT KODE AATUIUf KOEFISIEIT AITALIAA voLt uE IIARGA AATUAIT (Rpl JI'II.AII HARGA (Rpl 1 2 3 4 5 6 ? t 9 T?remoplotic Machine Road Making (E8sl Jm o,o178 8,9531 19 e.2.(sl 1 buah Patok Pengarah Pekeda Biau (Lo1) htri 0,1795 90.ooo,oo Tukang (w2) htri o,0239 130.oo0,00 Mandor (Lo3) hari 0,0120 145.000,00 Beton fc 20 Mpa M1861 M3 0,0338 1.654.O19,26 Baja Tulmgm (Ms7a) btnS o,7260 1s.098,00 Cat Kg 0,1000 7E.300,00 Dump Truck E08 bulm 0,0005 15.434.900,OO Jrnl.ll Total 4.96A.E06.742,A7 PGmbuLtu 4.96E.806.(xxr,OO
11.Pemellharaatr Berkala Jalaa Lebar 1O Meter Satuan: Ku NO. KODE T'RAIAT KODE SATUAIT KOEFI6IEIT AIIALIAA VOLUUE IIARGA AATUAIT (Rpl JT'ULAII IIARGA lRpl I 2 3 4 5 6 7 8 9 1 1.2 1Ls Mobilisasi 1,0000 1,0000 Sewa Direksi 11961 + gudang (sewa stand) fiA 56,OOOO 56,0000 4 1.700,00 2.335.200,00 Demobilissi ls 0,3000 0,3000 623.040,00 186.912,OO Mobilisasi alat (sewa truck dobell E06 ls r,0000 1,O000 6.230.400,00 6.230.400,00 2 1.8.1 lLs Manajemen dan Keselamatan Lalu Lintas r,0000 l,oooo Pekerja (Flagman) OH 156,0000 l7l ,6000 90.000,o0 I 1.154.000,00 Koordinator / Pengatur OK 90.000,o0 3 1.17.(Ia) lbh Pengujian PH buah 9,0000 9,OOO0 74.000,00 666.000,00 4 I, l9 ILs Keselmatan dan Keshatff Kefa 1,0000 r,0000 Penyrapan RKK (biaya jilid) ls I,0000 1,0000 44.700,OO 44.700,N Personel K3 Konstruksi bulan 3,0000 3,0000 5.132.750,00 15.398.250,OO Fasil itas sarana kesehatan ls 1,0000 1,0000 39.400,00 39.400,00 spatu boot kerja buah 15,0000 15,0000 162.O00,00 2.430.000,00 topi proyek buah 15,0000 15,0000 193.000,00 2.895.000,00 sarung tangm buah 15,0000 15,0000 30.100,00 451.500,OO masker pemafaun pak 2,0000 2,0000 40.500,00 81.O00,OO 5 t,2l lLs Manajemen Mutu 1,0000 1,0000 Iaporan Kendali Mutu (biaya iilid) unit 3,0000 3,0000 50.400,00 151.200,00 6 2.3.( ls) lm' Corong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm 26,4000 Pek€rja L0t hri o,0410 1,0824 90.ooo,o0 97.4t6,OO Tukang hri o,0246 o,6494 130.000,00 44.427,20 Mandor (L031 hari 0,0041 0,1082 r45.000,00 15.694,80 Beton 30 Mpa (Mse) M3 o,4622 12,2021 3.574.294,49 43.613.827,3s Baja Tulangm (M39) bts 7,2633 191,7523 15.098,00 2.895.O75,49 pasir urug (Er-24r) M3 o,2940 7,7616 269.000,00 2.O47.870,40 Mat. Pilihan M3 3,1400 82,8960 413.000,00 34.236.048,00 Cetakan ukuran 100 x 100 bh/M' 1,0000 26,4000 3 13.500,00 4.276.400,OO Lantai Keda Fc' l0 mpa m47 m3 0,1300 3,4320 1.528.635,69 5.246.277,69 Tamper (E2s) Jam 3,8540 101,7456 44.900,O0 4.568.377,44 Flat Bed Truck El rl Jam o,0287 o,7577 470.000,00 356.109,60 7 2.3.11221, 1m' Salurm bcrbentuk U Tipe DS I I 10,OOOO Pekerja (Lol) hili o,5737 63,1070 90.ooo,00 5.679.630,00 Tukang $n2l hari o,2a69 3 1,5590 130.000,oo 4.1o2.670,OO Mandor (L03) hari o,o574 6,3 I40 145.000,oo 9r5.530,00 Semen (M 121 zak o,9239 10 1,630 1 90.300,00 9.177.198,03 Pasir Beton (M01) M3 0,0915 10,0650 413.000,00 4.156.845,00 Aggregat lhsar (M03) M3 o,1r92 13,1 120 512.000,00 6.713.344,OO Formworks (Mles) M2 1,0000 1 10,0000 313.500,00 34.485.000,00 Air (M 170) Ltr 27,7500 3.052,5000 7,80 23.809,s0 Latai Keda Beton Fc' 10 mpa M47 m3 0,0600 6,6000 1.528.635,69 10.o88.99s,s5 Plastik Cor roll 0,0560 6,1600 391.000,00 2.408.s60,00 Besi Beton lM57al ks 26,7232 2.939,5524 15.098,OO 44.381.362,62 Kawat beton (M t4) KC 0,0150 r,6500 30.100,oo 49.665,OO Beton Mixer Jam 0,4016 44,r760 86.400,00 3.816.806,40 Water Tanker lE23 Jam 0,0557 6,t270 308.900,00 1.892.630,30 Concrete Vibrator Jm 0,4016 44,1760 61.300,00 2.707.9aa,80 Epvator E 10) jam o,0240 2,6400 712.300,00 L.8AO.472,OO 8 3.1.(U 1m3 Galian Biasa 175,0000 Pekerja (LOU hari 0,0011 0,1925 90.000,00 17.325,00 Mandor (1031 hari 0,0006 0,1050 145.000,00 15.225,O0 6 ASB Konstruksi Jalan dan Jembatan - Halaman 90 KODE SATUAIT KOEFIAIEIT AIfALIAA ro. KODE I'RAIAIT VOLT'UE IIARGA AATT'AIT (RPl JI'UI"AII IIAROA (Rpl I 2 3 4 5 6 7 t 9 Ex@vator (Elo) Jam 0,oo38 o,6650 7 12.300,OO 473.679,50 rump Truck bulm 0 o,1274 15.434.900,00 1.966.465,63 9 3. l.(e) lm3 Galim Perkerasan berbutir 498,5353 Pekeda (L011 hari o,0060 2,99t2 90.ooo,00 269.209,06 Mildor (Lo3l hili 10 o,4985 145.OOO,00 72.287,62 Excavator (Elol Jm 0 3,4897 712.300,00 2.485.746,A6 )ump Truck (Eoel bulan o,0008 0,3755 15.434.900,00 5.796.499,49 10 3.2..2a]. 1m3 Timbunm Pilihan dili sumber galim Peke{a (Lo1l hri 0 90.ooo,00 Mmdor (Lo3l hri 0,0006 l45.OOO,O0 {M091/pasirBahan pilihan urug (M16) M3 1,2000 399.000,00 wheel Loader (Elsl Jam 29s.500,00 Dump Truck (Eoel bulm 0,0008 I 5.434.900,00 Motor Grader (E131 Jm o,0040 688.900,00 Tandem (E171 Jm o,01 12 400.100,00 Water Tanker (8231 Jam o,o34l 308.900,00 12.100,OOO011 3.3.(rl Lm2 Penyiapan Badan Jalan Pekerja (L01) hari 0,000s 5,9503 90.000,o0 s3s.529,87 0 2,9752 145.O00,oo 431.399,07Mmdor (103) hari 14.t70.673,OO(Er3l Jam 0,0017 20,5700 688.900,00Motor Grader 295,2400 400.100,00 1 18.125.524,00Tandem / vibro Roller (E171 Jam o,0244 330,0000t2 s. l.(11 1m3 Lapis Pondoi furegat Kel6 A 90.000,00 329.670,OOPekerja (10 1) hari 0,01 I I 3,6630 (Los) hari 0,0014 o,4620 14s.000,00 66.990,00Mandor Agregat A M26 M3 1,2890 425,3700 494.000,00 2 10. 132.780,00 295.500,00 848.391,70wheel Loader (E1s) jam 0,0087 2,8710 Dump Truck (Eoe) bulan 0,0013 0,4188 r5.434.900,00 6.464.75a,28 Motor Gmder jam 0,0009 0,3045 688.900,00 209.743,24 bmtory Roller (E19a) Jam o,oo97 3,2t33 544.700,00 1.750.275,89 l3 6.1 (1) I liter Lapis Reep Pengikat - Aspa.l CairlEmulsi 1.320,0000 Pekerl'a (Lor) hari 0,2640 90.000,00 23.760,00 Mandor LO3l hari 0, I 320 145.000,00 19.140,00 2.266,0440 16.900,00 38.296.143,60 (M3la) E4l E05 1,7167Liter Jam E l-- ---j 6.1 l2al I liter Iapis Aspal Emulsi I tor E4t hari Liter Jam 0,0002 7167 40 4.070,0000 9690 140 l5 Jam Jam ton 10 I .531,2000 Broom Antara 0,2410 hari o,o24tPch & IM3 M3 300. 0,1 9 18 Jam 14.148,95 28.1 1.464. o Jam 9. I .l 0, 14.0t I 2.0,0006 EO2 Roller ,74 P. 1 o,0084 8 Jam Jarn r .I.r, ton Aus Ls jpo-rt 2l 5- 0& zak o,41 527. 72 Jam 62,3 I I ,74 Jam bulan- o,o20t - - o,00o4 .l EO2 Jam I l7 Et8 Jam I m3 Beton strukur 400. 6.51 73 hari f ASB Konstruksi Jalan dan Jembatan _ Ha.laman 9t o,( o,( IE13 0,0002 0,0001 Emulsi 4,O700 3,2560 59.015,00 118.079.776.10 286.416.48 - 1.397.231,O0 ) hari Mesin Lo3) v92l o,3720 M9l o,3719 527.OOO (Mr2) lMt0) nk I s6,6100 0,0054 - o,o24t o,o24t I I lZfr'se- _ i,o-rs?= I ',ot NO, KODE T'RAIAIT KODE AATUIU| KOEFISIEIT AITALIAA voLt fE IIARGA SATUAIT lRpl .,I'UIAII HARGA (Rpl 1 2 3 4 5 6 ? t 9 Tukmg (w2l hari o,6885 tt3,5972 130.000,00 14.767.642,OO Mmdor LO3) hili o,o574 9,4664 r45.000,00 t.372.633,39 Semen (M121 ak 5,4590 900,7350 90.300,o0 I 1.336.37O,50 Pasir Beton (Mola) M3 0,6343 ro4,6669 413.O00,o0 43.227.424,24 \gregat Kasar M3 o,7922 130,7141 512.000,00 66.925.63a,62 ayu Pemmh lmbr 4,4444 733,3333 40. loo,o0 29.406.666,67 Paku KC 0,230s 3A,0292 30.600,oo 1.163.693,52 Air Ltr 190,5500 31.440,7500 7,AO 245.237,85 Plastizier Ks o,8189 135, I l03 69.400,00 9.376.651,35 Concrete Mixer (E06) jam 0,4016 66,2651 86.400,OO 5.725.301,20 Concrete Vibmtor lam 2,4096 397,5904 61.300,oo 24.372.249,t6 Water Tml(Iruck (E23) jam 0,o382 6,2952 308.900,oo 1.944.581,33 18 e.2.lrl lm2 Marka Jalm Termoplastik 50 1,6000 Pekerja Bias (Loll hari o,0204 10,2322 90.000,00 920.895,01 Tukang tw2l hili o,0025 1,2790 130.000,00 166.272,71 Mmdor (1031 hri o,002s t,2790 r45.000,00 185.458,02 Cat Mrka Thermoplastic (Ml7b) KC o,o339 16,9846 34.600,00 547.667,35 Glass Bead KS o,4635 232,49t6 118.000,00 27.434.@A,AO rump Truck (EoEl bulan o,000t o,0,492 1s.434.900,OO 759-290,72 Themoptastic Road Making Machine (E8sl Jam 0,0178 8,9s31 19 9.2.[sl I bual Patok Pengarah Pekerja Bias (Lo1) hari o,t795 90.000,00 Thkang lw2l hari o,0239 130.000,oo Mandor (Lo3l hari 0,0 r20 145.000,00 Beton fc 20 Mpa (M186) M3 0,0338 1.654.019,26 Baja Tulangan (Ms7a) btng o,7260 15.098,00 Cat lma2l KC 0, I 000 78.300,00 Dump Truck EO8 bulan 0,0005 15.434.900,00 Jrfilafi Totel 5..153.t73.336,04 Pcnbuhtu 5..Lt3.t73.(xrc,(x,
12.Pemellharaan Berkala Jalan Lebar 11 Meter Satuaa: Ka ro. -1 -I KODE 2 t.2 lLs URAIAX 3 KODE SATI'AIT 5 KOEFISIEtr AJTALISA VOLI'UE IIARGA 8ATUAI{ (Rpl JUf,I.AII IIARGA lRpl S€wa Direksi Keet + gudang (sewa stand) m2 ls ,0000 56,0000 56,0000 4 1.700,o0 2.335.200,00 Mobilissi alat (sewa tru& dobel) E06 ls 1,0000 t,0000 6.230.400,00 6.23o.4oo,oo 2 1.8.1 lLs Mmajemen aan Xeselami6 lalu Lintas OK 1,0000 1,0000 3 L.t7 4 1,19 lLs dan buah 1,0000 1,0000 44. 5. RKK Personel sarana boot ls buah buah 1,0000 15,0000 - 15,0000 l 1s,0000 39.400,00 5 1,21 Mutu buah r5,0000 81 Laporan Mutu unit 3,OOOO 3,0000 lsl.raoE' 6 2.3.(rsl 1m' ukumn dalam x 100 cm l0 26?oeo' .4 Beton (EI. r) x 100 urug hari M3 btg 0,004 7 I 43.6 4 M3 o,2940 7, m3 Jam tot,?456-- { ASB Konstruksi Jalan dan Jembatan _ Halaman 92 1,0000 Demobiliesi s0.40opo I hari o,0246 t.oa24 - o,6494 o,4622 19t,7523 0, I 300 - 3,8540 NO. KODE I'RAIA.IT KODE AATUAII KOEFIAIElT AI|IILISA VOLUUE HARGA SATUAIT lRpl .,U[LIIH HARGA (npl I 2 3 4 5 6 7 8 9 Flat Bed Truck El1 Jm o,0287 o,7577 470.OOO,OO 356.109,60 7 2.3.122l, 1m' Salurm berbentuk U Tipe DS 1 I 10,OOOO Pekerja (rol) htri o,5737 63,1070 90.ooo,oo 5.679.630,O0 Tukang (w2l htri o,2469 3 t,5590 130.OOO,OO 4.to2.670,OO Mmdor (ro3) hri o,o574 6,3r40 145.OOO,O0 915.530,00 Semen (M121 ak o,9239 101,6301 90.300,00 9.t77.tgg,O3 Pasir Beton (M0l) M3 0,0915 10,0650 4r3.000,00 4.156.845,00 Aggregat Kasar (Mo3) M3 0,1 192 13, I 120 5r2.000,00 6.713.344,00 Formworks (Ml9s) M2 1,0000 l 10,0000 3 13.500,00 34.485.OO0,00 Air (M1701 Ltr 27,7500 3.052,5000 7,AO 23.809,50 Lantai Keda Beton Fc' l0 mpa M47 m3 o,0600 6,6000 r.s28.635,69 r0.088.995,s5 Plastik Cor roll 0,0560 6,1600 391.O00,oo 2.408.560,00 Besi Beton (Ms7a) kg 26,7232 2.939,5524 15.098,00 443a1.362,62 Kawat beton (M14) Kg 0,0150 1,6500 30. loo,oo 49.665,00 Beton Mixer (E06) Jam 0,4016 44,1760 86.400,00 3.816.806,40 Water Tanker (E23) Jam 0,0s57 6,t270 308.900,oo 1.892.630,30 Concrete vibrator (E2Ol Jam 0,4016 44,1760 61.300,00 2.707.988,4O Epvator {El0l jam o,0240 2,6400 712.300,00 1.880.472,00 8 3.1.{ ll lm3 Gatian Bias 165,1260 Pekerja (L0l) hari 0,001I 0,18 16 90.000,00 16.347,47 Mandor (103) hari 0,0006 0,o991 145.000,00 14.365,96 Excavator (E1o) Jam 0,0038 o,6275 712.300,oo 446.953,1 5 Dump Truck bulm o,0007 o,t202 15.434.900,OO 1.855.512,02 9 3.l.(9) 1m3 Galian Perkerasan berbutir 544,5000 Pekerja hari 0,0060 3,2670 90.000,00 294.O30,O0 Mmdor (L03 hari 0,oo10 0,5445 145.@O,00 78.952,50 Excavator (Er0) Jam o,0070 3,8115 7t2.300,oo 2.7 t4.93t,45 Dump Truck (E09) bulan 0,0008 o,4102 15.434.900,00 6.330.933,78 10 3.2.12^l lm3 Timbunan Pilihan dari sumber galim Pekefa hari 0,0023 90.000,00 Mandor (1031 hari 0,0006 145.000,00 Bahan pilihan urug (M09)/pasir (M16) M3 1,2000 399.000,00 Wheel Loader Jam 0,0085 295.500,00 Dump Truck (Eog bulan 0,0008 15.434.900,00 Motor Grader (El3l Jam 0,0040 688.900,00 Tandem (El7l Jm 0,o112 400.100,00 Water Tanker (E23) Jam 0,0341 308.900,00 ll 3.3.(ll lm2 Penyiapan Badan Jalan r3.200,0000 Pekerja (Lo1) hari 0,0005 6,4913 90.000,00 584.2t4,41 Mmdor (LO3) hari o,ooo2 3,2456 145.000,00 470.617,t6 Motor Grader (E 13) Jam 0,0017 22,4400 688.900,00 15.458.916,00 Tmdem / vibro Rotler (E17) Jam o,0244 322,0800 400.100,00 128.864.208,00 L2 s. l.(11 lm3 apis Pondmi Agregat K€16 A 363,0000 Pekerja (L0r) hari o,0l I I 4,0293 90.000,00 362.637,OO Mandor (Lo3) hari 0,0014 0,5082 145.000,00 73.689,00 Agregat A M26 M3 I,2890 467,9070 494.000,00 23 1.146.058,00 Wheel Loader (E 1s lam o,0087 3,1 58 l 295.500,00 933.230,87 Dump Truck bulan 0,0013 o,4607 15.434.900,00 7.ttt.234,rL Motor Grader (E r3) Jam 0,0009 0,3349 688.900,00 230.717,57 Vibratory Roller lam 0,0097 3,5346 544.700,00 1.925.303,48 l3 6.1 (1) I liter Iapis Resp Pengikat - Aspal Cair/ Emulsi L4s2,0000 Pekeda LOl hari 0,0002 o,2904 90.000,00 26.1 36,00 Mandor (1031 hari 0,0001 o,1452 145.000,00 21.054,O0 Aspal Emulsi CSS-l (M3la) Liter t,7167 2.492,6484 16.900,00 42.t25.757,96 Asp. Distributor/aspalt sprayer E4l Jam 0,0002 o,2904 155.000,o0 45.012,OO Compressor E05 Jam 0,0007 1,0164 343.300,00 348.930, l2 14 6.1 l2al I liter Lapis Perekat - Aspal Cair/Emulsi 4.477,0OOO Pekeda (Lol) hari 0,0002 0,8954 90.000,00 80.586,00 Mandor (LO3) hari 0,0001 o,4477 145.000,00 64.916,50 Aspal Emulsi CRS-1 (M3lal Liter t,7167 7.685,66s9 16.900,00 r29.847.753,71 ,sp. Distributor E4L Jam 0,0002 0,8954 3s l.863,00 3 15.058,13 Compressor E05 Jam 0,0010 4,477O 343.300,00 1.536.954, l0 Power Broom E03 Jam 0,0008 3,5816 l5 ton Laston Antara I Pekerja (Lo1) hari o,24to 405,8602 90.000,00 36.527.42r,69 Mandor hari 0,o241 40,5860 145.000,00 5.884.973,49 Agr Pch Mesin 5-10 & 10-20 M3 o,3720 626,4905 527.000,00 rco.442 ,96 Agr Pch Mesin 0 - 5 (Mel) M3 0,37 l9 626,3565 225.000,00 140.930.212,50 Semen (M12 zak 0,1918 322,9452 90.300,00 29.165.563,85 Aspal [Ml0) Kg 56,6100 95.349,3552 16.900,00 l.6l 1.404.r02,88 wheel lrader E15 Jam 0,0054 9,0432 295.500,00 2.672.274,94 AMP E0l Jam 0,0241 40,s860 9.788.900,00 397.292.53r,28 Genset Et2 Jam o,o24l 40,5860 57.142,46 2.3r9.201,8 fi ASB Konstruksi JaLan dan Jembatan - Halaman 93 (LOl) tlol Elsl lE0e) lE l9a) ro3) NO. KODE T,RAIAX KODE SATUAIT KOEFIS! T IIIfALISA VOLIIUE HARGA AATUAIT (RPl JUUIAH HARGA (Rpl I 2 3 4 5 6 7 t 9 Dump Truck E09 bulm o,0006 o,9986 15.434.900,OO r5.412.566,97 Asphalt Finisher EO2 Jm o,oo83 13,9442 380.800,00 5.309.956,01 Tmdem Roller E17a Jm o,oo84 14,1997 400.100,o0 5.641.242,27 P. Tyre Rolter E18 Jm o,oos6 9,3598 534.200,OO 5.O@.Ot2,47 A.tat Bmtu Ls l,oooo 1.684,3200 16 6.3(6a) 1 ton Laston Lapis Aus (AC-WC) 1.403,6000 Pekeria LO1 hari o,0287 40,2693 90.oo0,00 3.624.235,56 Mandor (L03) hari o,o029 4,0704 145.OO0,00 590.2 13,80 Aer Pch Mesin 5-10 & 10-15 M92l M3 0,3206 449,9495 527.000,00 237.r233a6,50 Agr Pch Mesin 0 - 5 (Mel) M3 0,4193 588,5072 225.000,00 132.414. r08,75 Semen (Mr2l zak o,1936 271,793t 90.300,oo 24.542.917,29 Aspal (Mr0) Ks 62,3150 87.465,3340 16.900,00 1.478.164.144,60 wheel Loader E15 Jam o,o054 7,s360 295.500,00 2.226.495,82 AMP E0l Jm o,0201 28,t847 9.788.900,00 275.497.591,t6 Genset El2 Jam 0,0201 28,1447 37.t42,46 1.610.556,51 tump Truck E09 bulan 0,0004 0,5236 15.434.900,00 8.08r. r77,60 Asp. Finisher EO2 Jm 0,0r25 t7,5825 380.800,00 6.695.413,97 Tmdem Roller E17a Jm 0,o128 17,9046 400.100,00 7.t63.62s,s7 P. Tyre Roller E18 Jam 0,0084 I1,80r9 534.200,00 6.304.600,88 l7 7.r lTal 1m3 Beton strukur, fc20 MPa 165,0000 Pekeda (L0rl hili 0,4590 75,73r5 90.000,00 6.815.834,77 Thkang hri 0,6885 t13,5972 130.000,00 t4.767.642,00 Mandor (103) hdi o,o574 9,4664 145.OO0,00 t.372.63s,39 Semen (M12 zak 5,4590 900,7350 90.300,00 8r.336.370,50 Pasir Beton (Mola) M3 o,6343 104,6669 413.000,00 43.227.428,2A Agregat Kasar M3 o,7922 r30,7141 512.000,00 66.925.638,62 ayu Perancah lmbr 4,4444 733,3333 40. loo,o0 29.406.666,67 Paku Ks 0,2305 3A,0292 30.600,00 1.163.693,52 Air Ltr 190,5500 3 1.440,7500 7,ao 245.237,85 Ptastizier Ks 0,8189 135, t 103 69.400,00 9.376.65 1,35 Concrete Mixer (Eo6l larn 0,4016 66,265t 86.400,00 5.725.30r,20 Concrete Vibrator jam 2,4096 397,5904 6 1.300,00 24.372.289,16 Water TankTruck lm 0,0382 6,2952 308.900,00 1.944.581,33 18 e.2.ltl I fir2 Marka Jalan Temoplastik s0 1,6000 Peke{a Biasa (L0l) hili o,0204 10,2322 90.000,00 920.895,01 Tukang lw2 hari 0,0025 r,2790 130.000,00 t66.272,71 Mandor (103) hari 0,002s 1,2790 145.000,00 185.4s8,02 Cat Marka Thermoplastic KC 0,0339 16,9A46 34.600,00 587.667,35 Glass Bead (M34) KC 0,463s 232,4916 I r8.000,00 27.434.008,80 Dump Truck bulan 0,0001 o,0F.92 15.434.900,00 759.290,72 Themoplatic Machinc Road Muking (E8s) Jam 0,o178 8,953 r 19 e.2.(s) I buah Patok Pengarah Pekerja Bias (10 l hari 0, l79s 90.000,00 Tukang hari 0,0239 130.000,00 Mandor (103) hari 0,0120 r45.000,00 Beton fc 20 Mpa (M186) M3 0,0338 1.654.019,26 Baja Tulangm (Ms7a) btng o,7260 l5.o98,OO Cat (m421 Ks 0,1000 78.300,00 Dump Truck E08 bulm 0,0005 15.434.900,00 Jphrrrl Totd 5.93E.319.615,60 Pcnbuletu 5.93r.319.(xx),q'
13.Pemellharaan Berkala Jalaa Lebar 12 Meter Satuaa: Kn NO. KODE URAIAII KODE AATUAIT KOEFISIEIT AI{ALI8A VOLI'UE IIARGA AATUAI| lRpl JI'UI.AH IIARGA lRpl I 2 3 4 5 6 7 8 9 1 1.2 lLs Mobilisasi 1,0000 r,0000 Sewa Direksi Keet + gudeg (swa stmdl m2 56,0000 56,0000 41.700,00 2.335.200,00 Demobilisasi ls 0,3000 0,3000 623.040,O0 186.912,00 Mobiliwi alat (*wa truck dobel) E06 ls 1,0000 r,0000 6.230.400,00 6.230.400,00 2 1.8.1 ILs Muqjemen da Keslmatu Lalu Lints 1,0000 1,0000 Pekerja (Flagmanl OH 156,0000 17 1,6000 90.000,00 1 1.154.000,00 Koordinator / Pengatur OK 90.000,00 o 1.1 7.( l a) Ibh Pengujian PH buah 9,0000 9,0000 666.000,00 4 1,19 lLs Keslmatm dil Keehatm Kerja 1,0000 1,0000 Penlapan Rxr (biaYa j!ic!) ls 1,0000 1,0000 44.700,00 44. Personel K3 Konstruksi bulan 3,0000 3,OO00 5.132.750,00 15.398.250,00 f asilitas sarana kes€hatan ls 1,0000 1,0000 39.400,00 39.400,00 sepatu boot kerja buah 15,0000 15,0000 r62.000,00 2.430.000,00 topi proyek buah 15,0000 15,0000 193.000,00 2.895.000,00 4 ASB Konstruksi Jatan dan Jembatan - Halaman 94 tw2t E23) lM l7b) lE08t tw2t 74.000.00 NO. KODE I'RAI,AIT KODE aATUA.lt KOEFIAIEN AI|ALIAA VOLIruE IIARGA AATUAIT (Rpl .,I'UIAH HARGA lRpl 1 2 3 4 5 6 7 6 9 srung tangm buah l5,oooo 15,0000 30.100,00 4s1.500,00 Emafaw pak 2,OOOO 2,OOOO 40.500,oo 8l.o00,oo 5 t,2l 1Ls Mmajemen Mutu 1,0000 l,oooo unit 3,OOOO 3,0000 50.400,oo r51.200,oo 6 2.3.( ls) 1m' Gorong-gorong Kotak Beton Bertulmg, ukura dalm 100 cm xlOOm 26,4000 LO l) hari o,o410 1,0824 90.ooo,00 97.4t6,@ Tukang (w2l hili o,0246 o,6494 130.O00,00 84.427,20 Mmdor L03 hili 0,0041 0,1082 145.O00,00 15.694,80 Beton 30 Mpa (Ms9l M3 o,4622 12,2021 3.574.294,49 43.6t3.827,35 Baja Tulangan (M3el bts 7,2633 191,7523 15.098,O0 2.495.O75,49 pasir urug lEt-24r1 M3 o,2940 7,7616 269.OOO,O0 2.O87.870,40 Mat. Pilihm (Moel M3 3,1400 82,8960 413.000,o0 34.236.048,00 Cetakan ukum 1OO x lOO bh/M' 1,OOOO 26,4000 313.500,00 8.276.40,0,OO lantai Ke{a Fc' 10 mpa m47 m3 0, I 300 3,4320 r.528.635,69 5.246.277,69 amper tjz5 Jm 3,8540 tot,7456 44.900,00 4.564377,44 Flat Bed Truck (El ll Jam o,0287 o,7577 470.OOO,00 356.109,60 7 2.3.1221 lm' Salurm berbentuk U Tipe DS I I 10,0000 (Lol) hari o,5737 63,1070 90.000,00 5.679.630,00 hari o,2869 3 1,5590 130.000,00 4.to2.670,OO Mandor (Lo3l hili 0,0574 6,3140 r45.000,00 9 15.530,00 Semen M12 ak o,9239 lol,630t 90.300,oo 9.t77.198,O3 Pasir Beton M3 0,0915 r0,0650 413.000,00 4.156.845,00 Aggregat Kasar (M031 M3 o,t192 r3,l 120 512.000,00 6.713.344,OO Fomworks (Mlesl M2 1,0000 I 10,0000 313.500,00 34.485.000,00 Air Ltr 27,7500 3.052,5000 7,80 23.809,50 lantai Kerja Beton Fc' 1O mpa M47 m3 0,0600 6,6000 r.528.635,69 10.088.995,55 Plastik Cor roll 0,0s60 6,1600 391.000,00 2.408.560,00 Besi Beton (Ms7a) kt 26,7232 2.939,5524 15.098,00 44341362,62 Kawat beton (Ml4 Ks 0,0150 1,6500 30.100,00 49.665,OO Beton Mixer (E06) Jm 0,4016 44,1760 86.400,00 3.816.806,40 Water Tanker lE23 Jm 0,0557 6,1270 30E.900,00 1.892.630,30 Concrete Vibrator (E20) Jam 0,4016 44,1760 61.300,00 2.707.988,AO Exavator 810 lam o,0240 2,6400 7 12.300,00 1.880.472,00 8 3. l.( l) lm3 Galim Biasa 165,7060 Pekerja (L011 hari 0,001 l 0,r823 90.o00,00 16.404,49 Mmdor (Lo3l hari 0,0006 o,0994 145.O00,00 t4.416,42 Excavator (Elol Jam 0,oo38 o,6297 7 12.300,oo 448.523,06 rump Truck bulan 0,0007 o,1206 15.434.900,00 1.862.O29,44 9 3.1.(e) 1m3 Galim Perkerasan berbutir 594,0000 Peke{a hari 0,0060 3,5640 90.000,00 320.760,OO Mandor lLo3) hari 0,0010 0,s940 145.000,00 86.130,00 Excavator (El0l Jam 0,o070 4,1580 7 12.300,00 2.96r.743,40 Dump Truck {E0e) bulan 0,0008 o,4475 15.434.900,00 6.906.473,22 10 3.2.12a1 lm3 Timbunm Pilihu dai sumber Pekeda (Loll hari 0,0023 90.000,00 Mandor (rr3l hili 0,0006 145.000,00 BahM pilihm (Mog)/pdi. urug Ml6 M3 1,2000 399.O00,00 wheel Loader Jam 0,008s 295.500,00 Dump Truck (Eoe) bulan 0,0008 1s.434.900,00 Motor Gmder tE l3l Jm 0,0040 688.900,00 Tandem (El7) Jm 0,0112 400.100,00 Water Tanker (E23 Jam 0,0341 308.900,00 11 3.3.(l) lm2 14.300,0000 Pekeda (L0ll hari 0,0005 7,0322 90.000,00 632.898,94 Mandor (Lo3l hari 0,0002 3,5161 145.000,00 s@.835,26 Motor Grader (El3) Jm 0,oo17 24,3tOO 688.900,OO 16.747.159,OO Tandem 7 Vibro Roller (El7l Jam o,0244 344,9200 400.100,00 r39.602.892,OO t2 5.1.(i lm3 Lapis Pondsi Agregat Kcl6 A 396,0000 Pekerja (L0rl hari 0,01I I 4,3956 90.000,00 395.604,00 Mador (L03 hari 0,0014 o,5544 14s.000,oo 80.388,OO Agregat A M26 M3 r,2890 5 1o,4440 494.OOO,OO 252.1 59.336,OO Wheel Loader (Els Jam 0,0087 3,4452 29s.s00,00 1.018.070,O4 Dump Truck butan 0,0013 o,so26 15.434.900,00 7.757.709,93 Motor Grader (E l3 Jam 0,0009 o,3654 688.900,00 25 r.691,89 Roller jam 0,0097 3,8559 544.700,00 2.100.331,07 13 6.1 (11 I liter lapis Reep Pengikat - Aspal Cair/Emulsi 1.584,0000 Pekerja LOl hari 0,0002 0,3168 90.000,00 28.512,00 Mandor (Lo3) hari 0,0001 0,1584 145.000,00 22.964,OO Aspal Emulsi CSS-l (M3la) Liter t,7167 2.719,2528 16.900,00 45.955.372,32 E4l Jam 0,0002 0,3168 155.000,00 49.104,00 Compressor E05 Jam 0,0007 1,1088 343.300,00 380.651,04 l4 6.r l2al 1 liter lapis Perekat - Aspal Cair/Emulsi 4.884,0000 ekeda LO1) hari 0,0002 0,9768 90.000,00 87.912,00 Mandor (1031 hari 0,0001 0,4884 145.000,00 70.818,00 ( ASB Konstruksi Jalan dan Jembatan - Hdaman 95 ll.o2t tEogl INI ElS E 19a) I{o. KODE I'RAIAIT KODE SATUAIT KOEFISIEII AITALIAA VOLUUE HARGA SATUAI lRpl JI'UL/IH HAROA (Rpl I 2 3 4 5 6 7 t 9 Aspal Emutsi CRS-l (M31a) Liter 1,7167 8.384,3628 16.900,00 141.695.731,32 Asp. Distributor E4l Jm o,oo02 o,9768 3sr.863,00 343-699,7A Compressor E05 Jm o,oo10 4,8840 343.300,OO 1.676.677,20 Power Broom E03 Jam 0,0008 3,9072 15 6.3(7al I ton Laston Iapis Antara (AC-BC) 1.837,4400 Pekeda htri o,24to 442,7566 90.000,oo 39.848.096,39 Mandor (Lo3) hari o,o24L 44,2757 145.000,00 6.419.97r,08 Agr Pch Mesin 5-10 & 10-20 (Me2) M3 o,3720 683,4442 527.000,00 360.t75.O72,32 Agr Pch Mesin 0 - 5 M3 o,3719 683,2980 225.000,o0 153.742.050,O0 Semen (Mr2) zak 0, 19 r8 352,3475 90.300,00 3r.4t6.974,74 Aspal {Mt0) Ks 56,61O0 lo4.ot7,47a4 16.900,00 1.7s7.895.384,96 Wheel Loader El5 Jam 0,oo54 9,8653 295.500,00 2.915.209,O7 AMP E01 Jm o,o24t 44,2757 9.788.900,OO 433.41O.O34,12 Genset 812 Jam o,o24t 44,2757 57.t42,86 2.530.037,87 Dump Truck E09 bulm 0,0006 1,0893 15.434.900,00 t6.413.709,42 Asphalt Finisher EO2 Jm 0,oo83 15,2 I l9 380.800,oo s.792.679,29 Tmdem Roller ElTa Jam 0,0084 15,4905 400.100,00 6.197.762,48 P. Tyre Roller El8 Jm 0,oo56 to,2to? 534.200,OO 5.454.559,06 Alat Bantu Ls 1,0000 1.837,4400 r6 6.3(6a) I ton Laston Lapis Aus (AC-WC) 1.531,2000 Pekerja (L0 1) hari o,o2a7 43,930 I 90.000,oo 3.953.711,52 Mandor (103) hari o,oo29 4,4405 145.000,00 643.869,60 Agr Pch Mesin 5-10 & 10-15 lM92l M3 0,3206 490,8540 527.O00,00 258.680.058,00 Agr Pch Mesin 0 - 5 (M91) M3 0,4193 642,OO74 225.000,00 144.451.755,00 Semen (M12) zak 0,1936 296,50r6 90.300,00 26.774.O91,59 Aspal (M10) Ke 62,3 150 95.4t6,72AO 16.900,00 t.612.542.703,20 Wheel Loader E15 Jam 0,0054 8,2211 295.50(),00 2.429.340,89 AMP EOI Jam 0,o201 30,7470 9.788.900,OO 300.979.190,36 Genset Et2 Jam 0,0201 30,7470 57.142,86 t.756.970,74 Dump Truck 809 bulan 0,0004 o,5712 15.434.900,00 8.815.830,11 Asp. Finisher EO2 Jm 0,012s 19,1809 380.800,00 7.304.087,97 Tandem Roller ElTa Jam 0,0128 19,5323 400.100,00 7.814.864,26 P.'IYre Roller El8 Jam 0,0084 12,4749 534.200,OO 6.A77.746,41 L7 7.t l7^l 1m3 Beton strukur, fc20 MPa l65,OOO0 Pekerja (Loll hari 0,4590 75,7315 90.000,00 6.415.434,77 Tukang IW2l hri 0,6885 t13,5972 130.ooo,00 t4.767.642,W Mandor (Lo3) hri 0,0574 9,4664 145.000,00 t.372.633,39 Semen (Ml2) uk 5,4590 900,7350 90.300,00 81.336.370,50 Pasir Beton (M0Ia) M3 o,6343 104,6669 413.000,00 43.227.428,28 Agregat Kasar M3 o,7922 130,7141 s 12.000,00 66.925.63A,62 Kayu Perancah lmbr 4,4444 733,3333 40.100,00 29.406.666,67 Paku Kc o,2305 38,0292 30.600,o0 1.163.693,52 Air Ltr 190,s500 31.440,7500 7,ao 245.237,45 Plastizier Ks 0,8189 135, t 103 69.400,00 9.376.651,3s Concrete Mixer (E06) jam 0,4016 66,26st 86.400,00 5.725.301,20 Concrete Vibrator JM 2,4096 397,5904 6r.300,00 24.372.289,16 Water TmkTruck lE23l jam 0,0382 6,2952 308.900,oo 1.944.581,33 I8 e.2.ltl lm2 Mtrka Jalan Temoptastik s0 I,6000 Pekeda Biasa (Lorl hari o,0204 1O,2322 90.000,00 920.895,0 I Tukang (102) hari 0,0025 t,2790 130.000,00 166.272,71 Mandor (rr3) hari 0,0025 t,2790 145.000,00 185.458,02 Cat Marka Themoplastjc (M17bl Kg 0,0339 16,9846 34.600,00 587.667,35 Glass Bead Kg 0,4635 232,4916 I 18.000,00 27.434.008,80 Dump Truck (E08) bulan 0,0001 o,0492 15.434.900,00 759.290,72 Themoplotic Machine Road Muking (E8s) Jam 0,017E 8,9531 l9 e.2.(s) I buah Patok Pengamh Pekerja Biasa (LOll hari 0,1795 90.000,00 Tukang ltn2l hari o,0239 130.000,00 Mandor (103) hari 0,0120 145.000,00 Beton fc 20 Mpa (M186) M3 0,0338 1.654.019,26 Baja Tulangan (M57a) btng o,7260 15.098,00 Cat lm42l Kc 0,1000 78.300,00 Dump Truck E08 bulan 0,0005 rs.434.900,00 Junleh Totd 6.422.974.76L,O9 Pcmbuletu 6.422.974.W,OO 14, Pemellharaaa Berkala Jalan Lebar 13 Meter Satuan: Km NO. KODE I'RAIAIT KODE AATUAIT KOEFIBIEIT AI{ALI8A voLrruD IIARGA AATUAI| IRPI JI'II.AII IIARGA lRpl I 2 3 4 5 6 7 8 9 I 1.2 lLs Mobilisasi 1,0000 1,0000 sewa Direksi Keet + gudang (sewa stand) m2 56,0000 56,0000 41.700,00 2.33s.200,00 Demobilisasi ls 0,3000 0,3000 623.040,00 186.912,00 a ASB Konstruksi Jalan dan Jembatan - Halaman 96 NO. KODE URAIAI{ KODE AATUAIT KOEFIAITT ATALIAA VOLI'[E HARGA AAT'I'AIT lRpl .,UULAII IIARGA lRpl 1 2 3 4 5 6 7 8 9 Mobilissi alat (sewa truck dobel) E06 ls l,ooo0 l,oooo 6.230.400,00 6.230.400,OO 2 I .8.1 lLs Manajemen dil Keslmatan talu Lintas 1,OO00 l,OOOO Pekerja (Flagmm) OH l56,OOOO l7 1,6000 90.o00,o0 1 1.154.O00,OO Kmrdinator / Pengatur OK 90.000,00 1.1 7. (1 a) lbh Pengujian PH buah 9,OOOO 9,OOOO 74.000,00 666.OOO,OO 4 L,19 lLs Keslamatan dan Kesehatan Kerja 1,0000 1,0000 Penyiapan RKK (biaya jilid) ls 1,0000 r,0000 44.700,00 44.700,OO Personel K3 KonsEuksi bulan 3,0000 3,0000 5.132.750,OO 15.398.250,00 Fasilitas sarana kesehatan ts 1,0000 r,oo00 39.400,00 39.400,OO sepatu boot kerja buah 15,0000 15,O000 r62.000,oo 2.430.O00,OO topi prcyek buah 15,0000 lS,oooo 193.OOO,00 2.895.000,OO sarung tangan buah 15,0000 1s,0000 30.1o0,00 451.500,00 masker pemafasan pak 2,0000 2,OOOO 40.500,00 81.o00,00 5 t,2l lLs Manajemen Mutu 1,0000 l,OOOO lapoEn Kendali Mutu (biaya jilid) unit 3,0000 3,0000 50.400,o0 151.200,00 6 2.3.(1sl 1m' Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm 26,4000 Pekerja (10 l) hili o,0410 1,0'824 90.000,00 97.416,00 Tukang (L02) hari o,0246 o,6494 130.000,00 84.427,20 Mandor (r,03) hari 0,0041 0,1082 145.000,o0 1s.694,80 Beton 30 Mpa M3 o,4622 t2,202t 3.574.294,49 43.613.827,35 Baja Tulangan (M3el btg 7,2633 191,7523 15.098,00 2.495.O75,49 )asir urug (El-24r) M3 o,2940 7,76t6 269.OOO,OO 2.O87.870,40 Mat. Pilihan (Moe) M3 3, I400 82,4960 4 13.000,00 34.236.048,00 Cetakan ukuran 100 x 10O bhi M' r,0000 26,40,0,0 3r3.500,00 8.276.400,O0 lantai Keda Fc' 10 mpa m47 m3 o, I 300 3,4320 r.528.635,69 5.246.277,69 Tamper (E2s) Jam 3,8540 101,7456 44.900,00 4.568.377,44 Flat Bed Truck (El l) Jam 0,0287 o,7577 470.000,00 356.109,60 2.3.1221 lm' Salurm berbentuk U Tipc DS I l 10,0000 Pekeda (rrll hari o,5737 63,tO70 90.OOO,O0 5.679.630,00 Tukarg (w2l hili o,2869 31,s590 130.000,00 4.toz.670,OO Mandor (1031 hari 0,0574 6,3140 145.000,00 915.530,00 Semen (Ml2) zak o,9239 10 1,630 I 90.300,00 9.t77.t98,O3 Pasir Beton (M01) M3 0,0915 10,0650 413.000,00 4.156.845,00 Aggregat Kasar (M031 M3 o,tt92 13,1 120 512.000,00 6.713.344,00 Formworks (Ml9sl M2 1,0000 1 10,0000 313.500,00 34.485.000,00 Air (Ml70) Ltr 27,750,0 3.0s2,5000 7,AO 23.809,50 latai Kerja Beton Fc' l0 mpa M47 m3 0,0600 6,6000 l.528.635,69 10.088.995,55 Plastik Cor roll 0,0560 6,1 600 391.000,00 2.408.560,00 Besi Beton (M57a) kg 26,7232 2.939,5s24 15.098,00 44.34t362,62 Kawat beton (M14) Ks 0,0150 1,6s00 30.100,00 49.665,00 Beton Mixer (E06) Jm 0,4016 44,t760 86.400,00 3.816.806,40 Water Tmker (E231 Jm 0,0557 6,t270 308.900,o0 1.892.630,30 Concrete vibrator (E201 Jam 0,4016 44,t760 6r.300,00 2.707.988,4O Envator (Elo) jam o,0240 2,6400 7 12.300,oo t.8ao.472,OO 8 3. r.( l) 1m3 Galian Biasa 165,0000 Pekerja (Loll hari 0,001 I 0, l8l5 90.000,00 r6.335,00 Mandor (Lo3l hari 0,0006 0,0990 145.000,00 14.355,00 Excavator (E10) Jam 0,0038 o,6270 712.300,00 446.612,tO Dump Truck (E0e) bulan 0,0007 0, l20l 15.434.900,00 1.854.096, l6 9 3.1.(el 1m3 Galian Perkemsan b€rbutir 644,1734 Pekerja (10 r) hari 0,0060 3,8650 90.ooo,oo 347.853,64 Mandor (103) hari 0,0010 o,6442 r45.000,00 93.40s, r4 Excavator (El0) Jam 0,0070 4,5092 712.300,00 3.2rt.912,99 Dump Truck (Eoe) bulan 0,0008 0,4853 15.434.900,00 7.489.842,31 10 3.2.12a1 lm3 Timbunan Pilihan dari sumber galian Pekerja {101) hari 0,0023 90.000,00 Mandor (r03) hari 0,0006 145.000,00 Bahan pilihan (M091/pasir urug (Ml6) M3 1,2000 399.000,00 wheel lrader (Elsl Jam 0,0085 295.500,OO Dump Truck (E09) bulan 0,0008 15.434.900,00 Motor Grader {E l3) Jam 0,0040 688.900,00 Tandem Et7) Jam 0,0112 400.100,00 Water Tanker (8231 Jam 0,0341 308.900,00 11 3.3.(U 1m2 Penyiapan Badan Jalan 15.400,0000 Pekeda (L0l) hari 0,0005 7,5731 90.000,00 681.583,48 Mandor (ro3) hari 0,0002 3,7466 145.000,00 549.053,36 Motor Grader (Er3) Jam 0,0017 26, I 800 688.900,00 18.035.402,00 Tandem / Vibro Roller (El7) Jam 0,o244 375,7600 400.100,00 r50.341.576,00 ASB Konstruksi Jalan dan Jembatan - HaLaman 97 f NO. KODE URAI,AIT KODE AATUAIT KOEFIAITT AI|ALIAA VOLIIME IIARGA AATUAIT lRPl .,UUL/IH HARGA (Rpl I 2 3 4 5 6 7 t 9 12 s.1.( 1) 1m3 lapis Pondasi Agregat Kelas A 429,OOOO Pekeda (ro1) hari 0,ol I I 4,7619 90.ooo,oo 428.57t,OO Mandor (Lo3l hri o,oo l4 0,6006 145.O00,00 87.OA7,OO Agregat A M26 M3 r,2890 552,98 l0 494.000,00 273.t72.6t4,OO Wheel t ader (E1s) lm 0,0087 3,7323 295.500,00 t.102.909,21 rump Truck (Eoe) bulm 0,0013 0,5445 15.434.900,00 8.404.185,76 Motor Grader (El3l lam 0,0009 0,39sE 688.900,00 272.666,22 Vibratory Rotler El9a) jam o,0097 4,t773 544.700,00 2.275.3s8,65 l3 6.1 (ll I liter ta.pis Resap Pengikat - Aspal Cair/Emulsi 1.716,0000 Pekerja (L01) hari 0,0002 o,3432 90.000,o0 30.888,00 Mandor (103) hari 0,0001 o,17 t6 145.000,oo 24.8A2,OO Aspal Emulsi CSS-l (M3la) Liter 1,7 t67 2.945,A572 16.900,00 49.744.986,68 Asp. Distributor/ spalt sprayer E41 Jam 0,0002 o,3432 155.000,00 53. r96,O0 Compressor E05 Jam 0,o007 t,2012 343.300,00 4t2.371,96 t4 6.1 (2al 1 titer Lapis Perekat Aspal CairlEmulsi 5.291,OOOO Pekerja (LO l) hari 0,0002 1,O582 90.000,00 9s.238,OO Mandor (Lo3) hari o,000I o,5291 145.000,00 76.719,sO Aspal Emulsi CRS-l (M31a) Liter t,7t67 9.083,0597 16.900,00 153.s03.708,93 Asp. Distributor E4l Jam 0,0002 1,0582 35 r.863,00 372.34t,43 ompres$r E05 Jm o,0010 5,2910 343.300,00 1.816.400,30 Power Broom EO3 Jam 0,0008 4,2324 l5 6.3(7al 1 ton Laston Lapis Antara (Ac-Bcl 1.990,5600 Peke{a {Lo1l hari o,24to 479,6530 90.000,00 43.168.771,08 Mmdor (lr3) hari o,o24t 47,9653 r45.000,00 6.954.968,67 Agr Pch Mesin 5-10 & 10-20 (M92) M3 o,3720 7403974 527.000,00 390.189.661,68 Agr Pch Mesin 0 - 5 (M9l) M3 0,37 l9 740,2395 225.000,00 166.553.887,50 Semen Mt2l ?AK 0, l9l8 38 1,7098 90.300,oo 34.468.393,64 Aspal (M10) Kg 56,6100 I12.685,6016 r6.900,00 1.904.386.667,O4 wheet Loader El5 Jam 0,00s4 10,687s 295.500,00 3.158.143, l6 AMP EO1 Jam o,o24l 47,9653 9.788.900,O0 469.527.536,96 Genset Et2 Jam o,o24t 47,9653 57.t42,A6 2.740.474,35 Dump Truck EO9 butan 0,0006 1,1801 r5.434.900,O0 18.214.851,87 Asphalt Finisher EO2 Jam 0,0083 t6,4795 380.800,00 6.275.402,s6 Tmdem Roller E17^ Jam o,o084 t6,7814 400. l00,oo 6.7t4.242,69 P. Tyre Roller E18 Jam o,0056 11,0616 534.200,O0 5,909.105,65 Alat Bantu Ls 1,fi)OO 1.990,5600 16 6.3(6a) 1 ton Laston lapis Aus (AC-wCl 1.658,8000 Pekerja (10 1) hari o,0287 47,59tO 90.000,00 4.243.t87,44 Mandor (Lo3) hari 0,0029 4,8105 145.000,00 697.52s,40 ABr Pch Mesin 5-10 & 10-15 (Me2) M3 0,3206 53 1,7585 527.000,00 280.236.729,50 Agr Pch Mesin 0 - 5 (Mel) M3 0,4193 695,5085 225.000,00 156.489.401,25 Semen (M12) zak 0,1936 32r,2rOO 90.300,00 29.0O5.265,49 Aspal (M101 Kg 62,3 I 50 103.368,1220 16.900,00 t.746.92t.26t,80 Wheel lrader E15 Jam 0,o054 8,9062 295.500,00 2.63t.785,97 AMP E01 Jam 0,0201 33,3092 9.788.900,00 326.060.789,s6 Genset Et2 Jam 0,0201 33,3092 57.t42,86 1.903.384,97 Dump Truck E09 bulan 0,oo04 0,6188 15.434.900,00 9.55O.442,62 ,sp. Finisher EO2 Jam 0,o125 20,7793 380.800,00 7.912.761,96 Tandem Roller ElTa Jam 0,0128 2 l,1600 400.100,00 8.466.tO2,95 P. Tyre Roller E18 Jam o,oo84 13,9478 534.200,00 7.4fi.891,94 l7 7.1 l7a) 1m3 Beton strukur, fc20 MPa 165,0000 Pekeda (L0r) hari 0,4590 75,73t5 90.000,00 6.81s.834,77 Tukang lw2l hari 0,6885 rt3,5972 130.000,00 14.767.642,QO Mandor (103) hari 0,0574 9,4664 145.000,00 1.372.633,39 Semen (M12) ak 5,4590 900,7350 90.300,00 8l.336.370,50 Pasir Beton (M01a) M3 0,6343 1o4,6669 413.000,00 43.227.42A,28 Agregat Kasar M3 o,7922 130,7141 512.000,00 66.925.63A,62 Kayu Perancah lmbr 4,4444 733,3333 40.100,00 29.406.666,67 Paku Kg 0,2305 38,0292 30.600,00 l.163.693,52 Air Ltr 190,5500 31.440,7500 7,AO 245.237,A5 Plastizier Ks 0,8189 I 35, I 103 69.400,00 9.376.651,35 Concrete Mixer (E06) jam 0,4016 66,2651 86.400,00 5.725.301,20 Concrete Vibrator iam 2,4096 397,5904 61.300,00 24.372.289,16 water TankTruck (E231 jam 0,0382 6,2952 308.900,00 1.944.581,33 l8 7.e.(tl 1m3 asangan Batu Pekerja Biasa (Lol) hari 0,4590 90.000,00 Tukang lto2l hari o,LL47 130.@O,00 Mandor (rr3) hari 0,0574 145.000,00 Batu Kali (M021 M3 1,0238 231.000,00 Semen (PC) (M12) zak 3,4600 90.300,00 Pasir (M01a) M3 0,4562 413.000,00 Conc. Mixer (E06) jam 0,4016 86.400,00 Water Tanker (823) jam 0,0014 308.900,00 ( ASB Konstruksi Jalan dan Jembatan - Halaman 98 NO. KODE I'RAIAIT KODE aATUlt!t KOEFIAIEI{ AITALISA VOLUUE IIARGA AATUAIT (Rpl .,UUI.AII IIARGA (Rpl 1 2 3 4 5 6 7 a 9 18 e.2.lrl lm2 Marka Ja.lm T€moplastik 501,6000 Pekerja Bias (rcll hili o,0204 1O,2322 90.000,00 920.895,01 Tukmg w2l hili o,o025 1,2790 130.OOO,00 166.272,71 Mmdor (Lo3l hili o,0025 t,2790 145.OOO,OO 185.458,02 Cat Marka Themoplastic (M17b) KC o,o339 16,9846 34.600,00 587.667,35 Glass Bead (M34) KC o,4635 232,4916 r 18.000,00 27.434.OOA,aO )ump Truck (Eo8) Jam o,ooor o,0492 15.434.900,O0 759.290,72 Themoplastic Road Marking Machine (E8s) bulm 0,o I78 8,9531 19 9.2.(s) I buah Patok Pengaral Pekerja Biasa (rc1) hari 0,1795 90.000,00 Tukmg lw2l hili o,0239 130.000,00 Mmdor (103) hari 0,o120 145.000,00 Beton fc 20 Mpa (Ml86l M3 0,0338 1.654.O19,26 Baja Tulangm (Ms7al btng o,7260 15.O98,00 Cat lm42l Ke 0,1000 78.300,OO Dump Truck EO8 bulan 0,0005 r5.434.900,00 .Iqolah Total 6.9O7.623.384,38 Pombuletu 6.9O7.623.qxr,q' ( ASB Konstruksi Jalan dan Jembatan - Halaman 99
15.RekonstruLsl Jalan Lcbar 3 Meter (Datarl Satuan: Km NO. KODE I'RAIAI| KODE AATUAI{ KOEFI6IEIT AltAI,ISA VOLT'ME IIARGA AATUAIT (RPl JI'ULAII IIARGA (Rpl 1 2 3 4 5 6 7 I 9 I 1.2 lLs Mobilisasi 1,0000 1,0000 Sewa Direksi Keet + gudan8 (wa stand) m2 s6,oooo 56,OOOO 41.700,00 2.335.200,OO Demobilisasi ls 0,3000 0,3000 623.O40,OO 186.912,OO Mobitisasi alat (sewa truck dobel) E06 ls l,oooo 1,0000 6.230.400,00 6.230.400,00 2 1.8. 1 lLs Mmajemen dil Keslamtil Lalu Lintas 1,0000 l,ooo0 Pekeda (Flagman) OH 260,0000 286,0000 90.o00,00 18.590.000,00 Koordinator / Pengatur OK 90.000,00 1.17.(1a) lbh Pengujian PH buah 9,0000 9,0000 74.000,00 666.000,00 4 1. 19 1Ls Ke*lmata dil Ke*hata Kerja 1,0000 1,0000 Penyiapm RKK (biaya jilid) ls 1,0000 1,0000 44.700,OO 44.700,OO Personel K3 Konstruksi bularr 5,0000 s,0000 5.1 32.750,00 25.663.750,00 Fasilitas sama kesehatan ls 1,0000 1,0000 39.400,00 39.400,00 spatu boot kerja buah 15,0000 15,0000 162.OOO,00 2.430.OOO,00 topi proyek buah 15,0000 1s,0000 193.000,00 2.895.000,00 sarung tangan bua}l 1s,0000 15,0000 30.100,00 451.500,00 masker pemafasan pak 2,0000 2,0000 40.500,00 81.000,00 5 1,21 lLs Manajemen Mutu r,0000 1,0000 Laporm Kendali Mutu (biayajilid) unit s,0000 s,0000 50.400,00 252.000,00 6 2.3.(1sl 1m' Goroog-gorong Kotak Beton Bertutdg, ukuru dalm 100 m xl0Om 33,0000 Pekerja (LOU hari 0,0410 1,3530 90.000,00 121.770,0O Tukang lw2l hari o,0246 0,8r l8 130.000,00 r05.s34,00 Mandor lL03l hari 0,0041 0,1353 145.000,00 19.618,50 Beton 30 Mpa (Mse) M3 o,4622 t5,2526 3.574.294,49 54.5t7.244,t9 Baja Tulangan (M3e) btg 7,2633 239,6903 15.098,00 3.614.444,37 pasir urug [Er-24r) M3 o,2940 9,7020 269.000,00 2.609.838,00 Mat. Pilihan (M0e) M3 3,1400 103,6200 413.000,00 42.795.060,OO Cetakan ukuran IOO x IOO bh/M' 1,0000 33,0000 3 13.500,00 10.345.500,00 Lantai Kerja Fc' l0 mpa m47 m3 0,1 300 4,2900 1.528.635,69 6.557.447,Lt Tamper (E2s) Jam 3,8540 t27,t820 44.900,00 5.710.471,80 FIat Bed Truck (El rl Jam o,0287 0,947 t 470.000,00 445.t37,OO 7 2.3.(22l, 1m' Salure berbentuk U Tipc DS I l. 100,0000 Pekerja (LOl) hari 0,5737 631,0700 90.000,00 56.796.300,00 Tukang ln2l hari 0,2869 3 I 5,5900 130.000,00 4t.026.700,oo Mandor (r03) hari 0,0574 63,1400 145.000,00 9.1s5.300,00 Semen lM12) zak o,9239 l.O16,3010 90.300,00 9t.77 t.980,30 Pasir Beton (M01) M3 0,09 t 5 100,6500 413.000,00 4 r.s68.450,00 Agglegat Kasar (M03) M3 o,LL92 131,1200 512.000,00 67.133.440,00 Fomworks (M19s) M2 1,0000 1.100,0000 313.500,00 344.850.000,00 Air (Mr70) Ltr 27,7500 30.525,0000 7,AO 238.095,00 Ilntai Kerja B€ton Fc' 10 mpa M47 m3 0,0600 66,0000 1.528.635,69 100.889.955,54 Plastik Cor roll 0,0560 61,6000 391.000,00 24.085.600,00 Besi Beton M57al kg 26,7232 29.395,5243 15.098,00 443.8 1 3.626,1 5 Kawat beton (M141 Ks 0,01s0 r6,s000 30. l00,oo 496.650,00 Beton Mixer (E06) Jam 0,4016 441,7600 86.400,00 38.168.064,00 Water Tanker lE23l Jam 0,0557 61,2700 308,900,00 18.926.303,00 Concrete vibrator lE20) Jam 0,40t6 441,7600 61.300,00 27.O79.48a,N Exavator (El0) lam o,0240 26,4000 712.300,oo 18.804.720,00 I 3.1.(l) 1m3 Ga.lian Biasa 165,0000 Pekerja (L0l) hari 0,001I 0,1815 90.000,00 16.335,00 Mandor L03l hari 0,0006 0,0990 145.000,00 14.355,00 Excavator (El0) Jam 0,0038 o,6270 7 12.300,00 446.612,1O Dump Truck (E0el bulan 0,0007 0, l20l 15.434.900,00 L854.096,16 9 3. l.(91 lm3 Galim Perkerasan berbutir 495,0000 Pekerja (Lol) hari 0,0060 2,9700 90.o00,00 267.3@,OO Mandor (L03) hari 0,0010 0,4950 145.000,00 7 t.77S,OO Excavator (E10) Jam 0,0070 3,4650 712.300,00 2.468. I 19,50 Dump Truck (E0e) bulan 0,0008 o,3729 15.434.900,00 5.755.394,35 t0 3.2.(2al lm3 Timbunm Piliha doi sumber calim 222,7456 Pekerja L0 1) hari 0,0023 0,5123 90.000,00 46.108,33 Mandor (103) hari 0,0006 0,1336 145.000,00 19.378,86 Bahan pilihan urug (M09)/pasir (M161 M3 1,2000 267,2947 399.000,00 106.650.570,30 Wheel Loader {E1s) Jam 0,008s 1,8933 295.500,00 559.481,14 Dump Truck (E0e) bulan 0,0008 o,1726 15.434.900,00 2.663.548,3s Motor Grader (Er3) Jam 0,0040 0,8910 688.900,00 6t3.797,64 Tandem (Er7) Jam 0,01 12 2,4948 400.100,00 998.149,55 Water Tanker (E23) Jam 0,0341 7,5956 308.900,00 2.346.2Aa,O4 / ASB Konstruksi Jalan dan Jembatan - Halaman 100 NO. KODE URAIAI KODE AATUAIT KOEFIAIET AITALIAA voLt ilE IIARGA AATUAIY lRPl .,I'UIAII IIAROA (Rpl 1 2 3 4 5 6 7 t 9 11 3.3.(1) lm2 Penyiapan Badan Jdm 4.400,oo00 Pekeda hari o,oo05 2,1634 90.ooo,oo 194.738,L4 Mmdor (LO3 hili o,oo02 1,o819 14s.O00,oo 156.872,39 Motor Grader (E13 Jm 0,oor7 7,4800 688.900,OO 5.t52.972,OO Tandem / vibro Roller IEtTl Jm o,0244 107,3600 400.100,00 42.954.736,OO 12 s. l.{11 lm3 Lapis Pondai AgreSat Keltr A 495,OOO0 Peke{a (ro1) hili 0,011 I 5,4945 90.o00,0c 494.505,00 Mandor (L03) hili 0,0014 0,6930 145.000,00 100.485,00 Agregat A M26 M3 t,2490 638,0550 494.O00,O0 315.199.170,00 Wheet loader E15 JM o,oo87 4,3066 295.500,OO r.272.587,55 Dump Truck (Eoe) bulm o,0013 0,6283 15.434.900,OO 9.697.137,42 Motor Grader E13 lm 0,0009 o,4567 688.900,00 314.614,86 Vibratory Roller jam 0,0097 4,8t99 544.700,00 2.625.413,83 11 s.1.(2) 1m3 lapis Ponddi Agrcgat Kel6 B 825,0000 Pekeda L0 r) hari 0,011I 9,1811 90.000,00 826.296,43 Mandor (1031 hari 0,0014 r,t432 145.000,00 t65.766,07 ARregat B M26 M3 |,27 t4 1.048,9050 532.000,00 5s8.O17.460,00 Wheel Loader (E1s jam 0,0086 7,0950 295.500,00 2.096.s72,sO Dump Truck lpuv bulan 0,0015 t,2271 15.434.900,00 ra.939.767,20 Motor Grader (Er3) jam o,oo27 2,2275 688.900,00 t.534.524,75 Vibratory Roller (El9a) jam 0,oo97 8,0025 544.700,00 4.35E.961,75 13 6.1 (ll I liter lEpis Resp Pengikat Cair/ Emulsi AspaI 2.640,0000 eke{a (LO1 hili 0,0002 0,5280 90.000,00 47.520,OO Mandor hari 0,000r o,2640 145.OO0,00 38.280,00 ,spal Emulsi CSS-l (M3la) Liter 1,7t67 4.532,0880 16.900,00 76.592.287,20 Asp. Distributor/mpalt sprayer E41 Jam 0,0002 0,5280 155.000,00 81.840,00 Compressor E05 Jam 0,0007 1,8480 343.300,00 634.418,40 L4 6.1 l2al I liter Lapis Perekat - Aspal Cair/ Emulsi 660,0000 Pekerja (rc1 hari 0,0002 0,1320 90.000,00 l r.880,00 Mandor (r.,03) hari 0,0001 0,0660 145.000,00 9.570,00 Aspal Emulsi CRS-1 1 Liter 1,7t67 l. r33,0220 16.900,00 r9.148.071,80 Asp. Distributor E41 Jam 0,0002 0,1320 3s 1.863,00 46.445,92 Compressor E05 Jam 0,0010 0,6600 343.300,00 226.578,OO Power Broom E03 Jam 0,0008 0,5280 15 6.3l7al I ton Laston Lapis Antara (AC-BC) 459,3600 Pekerja (101) hari o,24to I 10,6892 90.000,00 9.962.024,1O Mandor (103) hari o,o241 I 1,0689 145.000,00 1.604.w2,77 Aer Pch Mesin 5-10 & 10-20 (Me2) M3 o,3720 170,8610 527.000,o0 90.043.768,08 Agr Pch Mesin 0 - 5 (Me1) M3 0,3719 fi0,a245 225.000,00 38.435.512,50 S€men (Ml2) ?AK 0, r918 88,0869 90.300,00 7.954.244,69 Aspal {Mr0) Kg 56,6100 26.0o4,3696 16.900,00 439.473.A46,24 Wheel Loader El5 Jam 0,0054 2,4663 295.500,00 724.802,27 AMP E0l Jam o,o24t 1 1,0689 9.788.900,00 108.352.508,53 Genset Et2 Jam o,o24t 1 1,0689 57.t42,A6 632.509,47 Dump Truck E09 bulan 0,0006 o,2723 15.434.900,00 4.203.427,35 Asphalt Finisher EO2 Jam 0,0083 3,8030 380.800,00 t.444.t69,42 Tandem Roller E17a Jam 0,0084 3,8726 400.100,00 t.549.440,62 P.'IYre Roller Er8 Jam 0,0056 2,s527 534.200,00 1.363.639,76 AIat Bantu Ls r,0000 459,3600 16 6.3(6a) I ton Laston Lapis Aus (AC-WC) 382,8000 Pekefa (Lo 1) hari o,0287 10,9825 90.000,00 9AA.427,A8 Mandor lLo3) hari 0,0029 1,1 101 145.000,00 t60.967,40 Agr Pch Mesin 5-10 & f0-15 M3 0,3206 122,7 t35 527.000,00 64.670.014,50 Agr Pch Mesin 0 - 5 (Mel) M3 0,4193 160,5020 225.000,00 36. r r2.938,75 Semen r) nJ< 0,1936 74,1254 90.300,00 6.693.522,90 Aspal M10 Kg 62,3 r50 23.854, r820 16.900,00 403.135.675,80 Wheel Loader E15 Jam 0,0054 2,0553 295.s00,00 607.335,22 AMP EOI Jm 0,0201 7,6467 9.788.900,00 75.244.797,59 Genset E12 Jam 0,0201 7,6867 57.t42,46 439.242,69 Dump Truck E09 bulan 0,0004 o,v2a 15.434.900,00 2.203.957,53 Asp. Finisher EO2 Jam 0,0125 4,7952 380.800,oo 1.826.021,99 Tandem Roller ElTa Jam 0,o128 4,8831 400.100,00 1.953.7t6,O7 P. Tyre Roller El8 Jam 0,0084 3,2tA7 534.200,00 1.719.436,60 17 7.1 (7al lm3 Beton strukur, fc20 MPa l65,OOOO Pekerja (L01 hari 0,4590 7s,73 l5 90.000,00 6.8t5.434,77 Tukang hili 0,6885 t13,5972 130,000,00 14.767.642,00 Mandor (1,03) hari 0,0574 9,4664 145.000,00 t.372.633,39 Semen (M12) ?AK 5,4590 900,7350 90.300,00 81.336.370,50 Pasir Beton (M01a) M3 0,6343 104,6669 413.000,00 43.227.428,28 A$egat Kasar M3 o,7922 130,7141 s12.000,00 66.925.638,62 I(ayu Perancah lmbr 4,4444 733,3333 40. loo,00 29.406.666,67 Paku KC 0,2305 34,0292 30.600,00 l.163.693,52 Air Ltr 190,5500 3 1.440,7500 7,ao 245.237,85 Plastizier Kg 0,8189 135, I 103 69.400,00 9.376.65 1,35 Concrete Mixer (E06) lam 0,4016 66,265t 86.400,00 5.725.30t,20 Concrete vibrator lam 2,4096 397,5904 61.300,00 24.372.289,16 Wat€r Tanl(Truck (E231 lam 0,0382 6,2952 308.900,00 1.944.581,33 ( ASB Konstruksi Jalan dan Jembatan - Halaman l0l ll.or) (LO3t lwzl ro. KODE I'RAIAX KODE AATUAIT KOEFIAIEil AITALISA VOLUUE IIARGA 8ATUAIT lRpl JT'UI.AII HARGA I 2 3 4 5 6 7 t I 18 7.e.lll 1m3 Pawgm Batu 799,5075 Pekeda Biae (rol) htri o,4590 366,9625 90.ooo,oo 33.026.628,OO Tukang lw2l htri o,tt47 9t,7378 l30.ooo,oo I 1.925.91 1, l3 Mandor (Lo3) hri o,o574 45,8689 145.000,oo 6.650.988,90 Batu Kali M3 1,o238 81E,4958 231.OOO,00 149.O72.536,9t Semen (rc) M12) ak 3,4600 2.766,2960 90.300,oo 249.7 .532,72 Pasir (M01a) M3 o,4362 364,7408 413.000,oo 150.637.970,08 Conc. Mixer (Eo6l jam 0,4016 321,O874 86.400,00 27.741.947,92 Water Tmker E23l Jam 0,00r4 l,1238 308.900,00 347.t43,60 l9 e.2.(sl I buah Patok Pengarah 150,0000 Pekerja Biasa (L0r) hari 0,1795 26,9277 90.000,00 2.423.493,9A Tukang (w2l hari o,0239 3,5904 r30.000,00 466.746,99 Mandor (Los) hari 0,0120 1,7952 145.000,00 260.301,20 Beton fc 20 Mpa (M186) M3 0,0338 5,0625 1.654.019,26 4373.472,50 Baja Tulangan (Ms7a) btng o,7260 108,89s9 15.098,00 1.644. I 10,99 Cat lm42l Kg 0,1000 15,0000 78.300,00 1.174.500,00 Dump Truck E08 bulan 0,0005 0,0690 15.434.900,00 1.065.709,04 JumLh Totrl 4.970.443.624,20 PcDbuLtu 4.97O.O45.OOO,OO
16.Rekonstruksl Jalan Lebar 4 Meter (Datarf Satuan: Km ilo. KODE I'RAIAIT KODE AATUAIT KOETISIEN ATALIAA VOLI'XE HARGA AATUAT (Rpl JUXIAH HARGA lRpl 1 2 3 4 5 6 7 E 9 I r.2 lLs Mobilissi l,oooo 1,0000 Sewa Direksi Keet + gudang (swa stand) m2 56,OOOO 56,OOOO 4 t.700,00 2.335.200,00 Demobilisasi ls 0,3000 o,3000 623.O40,00 186.912,00 Mobilisasi alat (s€wa truck dobell E06 ls 1,0000 r,0000 6.230.400,OO 6.230.400,00 2 1.8. I lLs Mmajemm dm Keslmato L€.lu Lintas 1,0000 1,0000 Pekeda (Flagman) OH 260,0000 286,0000 90.000,00 18.s90.000,00 Koordinator / Pengatur OK 90.000,00 3 1. I 7.(l a) lbh Pengujian PH buah 9,0000 9,0000 74.000,00 666.000,00 4 l,l9 lLs Ke*lmatm ds Keshata Kerja 1,0000 1,0000 Penyiapan RKK (biaya jilid) ls 1,0000 r,0000 44.700,OO 44.700,00 Personel K3 Konstruksi bulan 5,0000 5,0000 5.132.750,00 25.663.750,00 Fasilitas sarana keshatan ls 1,0000 1,0000 39.400,00 39.400,00 sepatu boot keda buah 1s,0000 15,0000 r62.000,00 2.430.000,00 topi proyek buah 15,0000 15,0000 193.000,oo 2.895.000,00 srung tangan buah 15,0000 15,0000 30. loo,00 451.500,OO masker pernafasan pak 2,0000 2,0000 40.500,00 81.000,00 5 |,21 lLs Manajemen Mutu 1,0000 I,OO00 Lapord Kendali Mutu (biayajilid) unit 5,0000 5,0000 50.400,00 252.000,00 6 2.3.( ls) 1m' Gorong-gorong Kotak Beton BertulmS, ukuro da.lm 100 cm x lO0 cm 33,0000 Pekerja LOl) hari 0,0410 1,3530 90.000,00 12t.770,oo Tukang lw2l hili o,0246 0,81 18 130.000,o0 105.534,00 Mandor (103) hari 0,0041 0, r3s3 145.000,00 19.618,50 Beton 30 Mpa M3 0,4622 t5,2526 3.574.294,49 54.5t7.244,t9 Baja Tulmgan (M39) bts 7,2633 239,6903 1s.o98,00 3.618.844,37 pasir urug (Er-24r) M3 o,2940 9,7020 269.000,00 2.609.838,00 Mat. Pilihan M3 3,1400 103,6200 413.000,00 42.795.060,OO Cetakil ukuran 100 x IOO bh/M' 1,0000 33,0000 313.500,00 10.345.500,OO Lantai Kerja Fc' l0 mpa m47 m3 0, I 300 4,2900 1.528.635,69 6.557 .447,tl Tamper (E2sl Jam 3,8540 t27,t420 44.900,00 5.710.471,80 Flat Bed Truck (El ll Jam o,0287 0,947t 470.000,00 445. I 37,00 2.3..22], 1m' Salurm berbentuk U Tipe DS 1 1.100,0000 Pekerja {L0l} hari o,5737 631,0700 90.000,00 56.796.300,00 Tukang lw2l hari o,2869 315,5900 130.o00,00 41.026.7@,OO Mandor (Lo3) hari 0,0574 63,1400 145.000,00 9.155.300,00 Semen (M12) zak o,9239 1.016,3010 90.300,00 91.771.980,30 Pasir Beton (M01) M3 0,0915 100,6500 4 13.000,00 4 r.568.450,00 Aggregat Kasar (M03) M3 0, I 192 13 1,1 200 512.000,o0 67.133.440,00 Formworks (M les) M2 1,0000 1.100,oo00 313.500,o0 344.850.000,00 Air (M170) Ltr 27,7500 30.525,0000 7,AO 238.095,00 Iatai Kerja Bcton Fc' 10 mpa M47 m3 0,0600 66,0000 1.528.635,69 100.889.955,54 Plastik Cor roll 0,0560 61,6000 391.000,00 24.085.600,00 Besi Beton b€ton kg Kg 26,7232 29.395,5243 16,5000 15.098,00 443.813.626,15 Beton Mixer 806) Jam 0,4016 44t,7600 86.400,00 38.168.064,00 Water Tanker (E2sl Jam 0,0557 61,2700 308.900,00 18.926.303,00 6 ASB Konstruksi Jalan dan Jembatan - Halaman 102 (M57al 0.0150 30.100,00 496.650,00 NO. KODE URAIA.![ KODE AATUAII KOEFIAIEIT AlIALlAA VOLUUE HARGA AATUAIT (npl .,U[I.AII IIARGA lRpl I 2 3 4 5 6 7 a 9 Concrete Vibmtor E2Ol Jm 0,4016 441,7600 61.300,00 27.O79.888,OO Exavator {Elol JM o,0240 26,4000 7 12.300,00 18.804.720,00 8 3. l.(ll 1m3 Galian Bias l65,OOOO Pekerja (Lo 1) hili o,oo1r o,1815 90.ooo,oo 16.335,OO Mmdor (ro3) hili o,0006 0,0990 145.000,oo 14.355,OO Excavator (E1o) Jm o,o038 o,627O 712.300,O0 446.612,1O Dump Truck (E09) bulm 0,ooo7 o,l20l 15.434.900,O0 1.854.096,16 9 3.1.(9) 1m3 Galim Perkemsan berbutir 660,0000 Pekerja L0 l) hari 0,0060 3,9600 90.000,00 356.400,00 Mmdor (103) hari 0,001o 0,6600 145.000,00 95.700,00 Excavator E1O) Jm o,oo70 4,6200 712.300,00 3.290.826,00 )ump Truck (Eoe) bulm o,oo08 o,4972 15.434.900,00 7.673.8s9, l3 l0 3.2.12a1 lm3 Timbunm Pilihan dari sumber galian 222,7488 Pekeda (rc1) hari 0,0023 0,5123 90.oo0,00 46.109,00 Mandor (L03) hari 0,0006 0,1336 145.000,00 t9.379,t4 Balan pilihan urug (M091/pasir (Mr6) M3 1,2000 267,2985 399.000,00 106.652.t20,65 Wheel Loader (Els) Jam 0,0085 1,8934 295.500,OO 559.449,27 Dump Truck (E09) bulm 0,0008 o,t726 15.434.900,OO 2.663.s47,O7 Motor Grader (El3l Jm 0,0040 0,8910 688.900,OO 613.806,57 Tandem (Er7l Jam 0,0112 2,4948 400.100,00 998. r64,06 Water Tmker (E231 Jam 0,0341 7,5957 308.900,00 2.346.322,r5 1t 3.3.(l) lm2 Penyiapm Badm Jalan 5.500,0000 Pekerja (L0l) htri 0,0005 2,7047 90.000,00 243.422,67 Mandor (Lo3) hari 0,0002 1,3523 145.000,00 196.090,48 Motor Grader (E13) Jam 0,0017 9,3500 688.900,00 6.44 1.2 15,00 Tandem / vibro Roller (El7) Jm o,0244 134,2000 400.100,00 53.693.420,00 12 s.1.{ll 1m3 lapis Pondoi Agregat Kel6 A 660,0000 Pekerja (Lo1) hari o,0l l1 7,3260 90.000,00 659.340,00 Mandor (103) hili o,o0l4 o,9240 145.000,00 133.980,00 Agregat A M26 M3 1,2890 850,7400 494.000,00 420.265.560,00 Wheel t-ader (E1s) Jam 0,0087 5,7421 295.500,00 1.696.783,40 Dump Truck (Eoel bulan 0,0013 o,4377 15.434.900,00 t2.929.5t6,56 Motor Grader (E131 iam 0,0009 0,6089 688.900,00 419.486,49 Vibratory Roller (E19a) jam 0,0097 6,4265 544.700,00 3.500.551,78 11 s. r.(2) 1m3 Lapis Ponddi Aarcgat Kelo B 1.100,0000 Pekerja (101) hari 0,01 I I t2,24t4 90.000,00 r.tot.72a,57 Mandor (103) hari 0,0014 t,5243 145.0oo,0o 221.O2t,43 Agregat B M26 M3 |,2714 1.398,5400 532.O00,00 744.O23.280,OO wheel Loader (E1s) Jm 0,0086 9,4600 29s.500,00 2.795.430,OO Dump Truck (E0e) bulan 0,00 l5 1,6361 15.434.900,00 25.253.O22,93 Motor Grader (Er3) jam o,oo27 2,9700 688.900,00 2.046.033,00 Vibratory Roller (E19al Jam 0,0097 10,6700 544.700,00 5.811.949,00 r3 6.1 (11 I liter lapis Resap PenBikat - Aspal Cair/Emulsi 3.520,0000 Pekerja LOl) hari 0,0002 o,7040 90.000,00 63.360,00 Mmdor (Lo3l hari 0,0001 o,3520 145.000,oo 51.o40,00 Aspal Emulsi CSS-l (M31a) Liter 1,7167 6.O42,7840 16.900,00 102.t23.O49,60 Asp. Distributor/ 4palt sprayer 841 Jam 0,0002 o,7040 155.000,00 109.120,00 Compressor 805 Jam 0,0007 2,4640 343.300,00 845.891,20 14 6.r (2al I liter Lapis Perekat - Aspa.l Cair/Emulsi 880,0000 Pekerja (Lol) hari 0,0002 0,1760 90.000,00 15.840,00 Mandor (Lo3) hari 0,0001 0,0880 14s.000,00 12.760,OO Aspal Emulsi CRS-I (M3la) Liter r,7 t67 1.510,6960 16.900,00 25.530.762,40 Asp. Distributor E4t Jam 0,0002 0,1760 351.863,00 6t.927,89 Compressor E05 Jam 0,0010 0,8800 343.300,00 302.104,00 Power Broom E03 Jam 0,0008 o,7040 15 6.3(7al I ton Laston Lapis Antara (AC-BC) 612,44OO Pekerja (Lo 1) hari o,24lo 147,S55 90.000,oo 13.282.698,80 Mandor (103) hari o,o241 14,7586 145.000,oo 2.t39.990,36 Agr Pch Mesin 5-10 & 10-20 (Me2) M3 o,3720 227,4147 527.000,00 120.058.357,44 Agr Pch Mesin 0 - 5 (Mel) M3 0,3719 227,7660 225.000,00 5l.247.350,00 S€men (M12) nk 0,19 l8 tt7,4492 90.300,00 10.605.659,58 Aspal (M10) Kg 56,6100 34.672,4928 16.900,00 585.965. wheel Loader E15 Jam 0,o054 3,2A84 295.500,00 97 L. AMP E01 Jam o,o24L t4,7586 9.788.900,00 I Genset Et2 Jam o,o24t 14,7586 57.1 5.604.569,81 Dump Truck E09 bulan 0,0006 0,3631 I EO2 Jam o,0083 5,0706 380.800,o0 I l0 Tandem Roller E17a Jam 0,0084 s,1635 400.100,oo 2.065.920,83 P. Tyre Rotler E18 Jam 0,0056 3,4036 534.200,00 1.818.186,35 Alat Bantu Ls 1,0000 612,4800 16 .3(6a) I ton Laston Iapis Aus (Ac-wC) 510,4000 Pekerja (10 1) hari o,0287 t4,6434 90.000,00 1.317.903,84 6ASB Konstruksi Jalan dan Jembatan - Halaman 103 Asphalt Finisher Ito. KODE URAIAIT KODE AATUAIT KOEFI6IEI{ AITALIAA VOLUUE IIARGA SATUAIf (Rpl JI'UI.AH IIARGA lRPl I 2 3 4 5 6 7 t 9 Mmdor LO3 htri o,oo29 1,4802 145.OOO,OO 214.623,20 Agr Pch Mesin 5-lO & 10-15 (Me2) M3 o,3206 163,6 180 527-O00,00 86.226.686,OO Agr Pch Mesin 0 - 5 (M9r) M3 o,4193 214,0026 225.OOO,OO 48.150.585,00 Semen M12 ak 0,1936 98,8339 90.300,00 4.924.697,20 Aspal (M10) KC 62,3150 3 1.805,5760 16.900,00 537.514.234,40 Wheel Loader Et5 Jm o,0054 2,740,4 295.500,00 809.780,30 AMP EO1 Jm o,o20l 1o,2490 9.788.900,00 1oo.326.396,79 Censet E12 Jam 0,o201 1o,2490 57.142,86 585.656,91 Dump Truck E09 bulm 0,0004 0, I 904 15.434.900,OO 2.938.6r0,O4 Asp. Finisher EO2 Jam 0,o125 6,3936 380.800,00 2.434.695,99 Tandem Roller ELTa Jam 0,0128 6,5 108 400.100,00 2.604.954,75 P. TYre Roller El8 Jam 0,0084 4,29t6 534.200,00 2.292.5A2,h t7 7.t l7al 1m3 Beton strukur, fc20 MPa 165,0000 Pekeia (Loll hili o,4590 75,7315 90.000,00 6.815.834,77 Tukang lw2l hili 0,6885 1t3,5972 l30.ooo,o0 14.767.642,OO Mmdor LO3 hari 0,0574 9,4664 145.000,00 t.372.6s3,39 Semen (M12) zak 5,4590 900,7350 90.300,00 I 1.336.370,s0 Pasir Beton M3 o,6343 104,6669 413.000,00 43.227.428,28 Agregat Kasar M3 o,7922 130,7141 512.000,00 66.925.638,62 Kalu Perancah lmbr 4,4444 733,3333 40.100,00 29.406.666,67 Paku Ke 0,230s 38,0292 30.600,00 1.rffi.693,52 Air Ltr 190,5500 3 1.440,7500 7,80 245.237,45 Plastizier KC 0,E 189 135, r 103 69.400,00 9.376.651,35 Concrete Mixer jam o,4016 66,2651 86.400,00 5.725.30r,20 Concrete Vibrator jam 2,4096 397,5904 6l.3O0,0o 24.372.2A9,16 Water TankTruck (E231 jam 0,0382 6,2952 308.900,00 1.944.58 1,33 18 7.e.(l) 1m3 Pasangm Batu 799,5075 Pekerja Biam (rrr) hili o,4590 366,9625 90.ooo,00 33.026.628,00 Tukang lw2l htri o,ll47 9t,7374 130.000,00 l L925.91 l, 13 Mandor (1031 hari o,o574 45,8689 145.000,00 6.650.988,90 Batu Kali (M02) M3 1,0238 818,4958 23r.000,00 189.072.536,9 I Semen (PC) (M12) ?* 3,4600 2.766,2960 90.300,00 249.796.532,72 Pasir (M0lal M3 o,4562 364,7408 4r3.000,00 150.637.970,08 Conc. Mixer (E06) Jam 0,4016 321,O874 86.400,00 27.741.947,92 Water Tanker jam 0,0014 l,1238 308.900,00 347.143,60 I8 9.2.(11 tm2 Marka Jalan Termoplastik 87,t200 Pekeda Biasa (LOl hari o,0204 7,4857 90.o00,00 673.7t2,O5 Tukang lw2l hari 0,002s 0,9357 130.oo0,00 12t.642,45 Mmdor (Lo3) hari 0,002s o,9357 145.000,00 Cat Marka Thermoplastic (M17b) Kg 0,0339 t2,4257 34.600,00 429.92A,O3 Gtass Bead Kg 0,4635 170,087 I I18.000,00 20.o70.241,44 rump Truck (E08 bulan 0,000r 0,o360 15.434.900,00 555.484,94 Themoplotic Machine Road Making (E8s) Jam 0,o178 6,5500 19 e.2.lsl t buah Patok Pengarah 150,O000 Pekerja Biasa (rc1 hili 0,1795 26,9277 90.000,00 2.423.493,98 Tukang hili 0,0239 3,5904 130.000,00 466.746,99 Mmdor (ro3) hari 0,0120 1,7952 260.30 Beton fc 20 Mpa (M186) M3 0,0338 1.654.019,26 BajaTulmgan btng o,7260 r5.098,OO 1.644. I 10,99 Cat lm42 Kc 0,1000 15,0000 78.300,00 1.174. rump Truck E08 bulan 0,0005 o,0690 15.434.900,00 Jumlab 5.77t.332.631,51 -37ffi"oo
17.Rekorsttuksl Jalatr Lebar 5 Meter (Datarl Satuan: Km NO. KODE 2 I'RAIAX KODE 6ATUAI{ 5 KOEFIAIEil AI{ALI8A VOLI'XE EARGA BATUAI{ lRpl JI'UL,IUI HARGA lRpl 1 I t.2 lLs Mobilisasi 1,0000 1,0000 Se* Oit"tsi Keet + Sudmg (swa stmdl m2 56,0000 56,0000 41.700,00 2.335.200,00 fr-ouili*ia"t (""*a truck dobet) E06 ls 1,0000 1,0000 6.230.400,00 6.230.400,00 , 1.8.1 lLs M*"J*."" d; K*elamatil la'lu Lintm OK 1,0000 1,0000 3 4 1,19 lbh lLs GlJil"t* a* Keehata Kelja I,0000 1,0000 700,00 44; RKK Personel K3 bulan 5,0000 s,0000 s.132.750,00 sarana ls 1,0000 I,OO00 39.400,00 buah 15,0000 15,0000 162.000,00 2.430.000,oo GiTtlEot t.rja 2, buah 15,0000 15,0000 6ASB Konstruksi Jalan dan Jembatan - Halaman 104 MOIA) (E06) lt,o2l 5,0625 a373.472,50 1.065.709,04 75O,0O 39.400.00 NO. KODE I'RAIAIf KODE SATUAIT KOEFIAIEIT ATALIAA voLt uE IIARGA SATUAIT lRPl JUULAH HARGA lRPl I 2 3 4 5 6 7 t 9 smn8 tan8m buah 15,OO00 15,OO00 30.100,00 451.500,00 masker pemafasan p8k 2,OO00 2,OO00 40.500,00 8r.000,oo 5 t,2t lLs Manajemen Mutu 1,0000 I,OOOO Iaporo Kendali Mutu (biayajilid) unit 5,OOOO 5,OOOO 50.400,00 2s2.OOO,OO 6 2.3.( ls) lm' Oorong-gorong Kotg} Beton Bertulmg, ukurm dalm 100 cm x lO0 cm 33,0000 Pekerja (r,orl hari 0,o410 1,3530 90.000,00 t21.770,OO Tukang (w2l hari o,0246 o,8118 130.000,00 105.534,00 Mandor (Lo3l hari 0,0041 o,1353 145.000,00 r9.618,50 (Mse) M3 o,4622 t5,2526 3.574.294,49 54.5t7.284,19 (M3e) bts 7,2633 239,6903 15.098,00 3.618.844,37 )asir uru8 (EI-24r) M3 o,2940 9,7020 269.000,00 2.609.838,00 Mat. Pilihan (M0e) M3 3,1400 103,6200 413.000,00 42.795.060,OO Cetakan ukuran 100 x 100 bh/M' 1,0000 33,OOO0 3r3.500,oo 10.345.500,00 l^antai Kerja Fc' 10 mpa m47 m3 0, I 300 4,2900 1.528.63s,69 6.426.168,97 amper (E2s) Jam 3,8540 t27,1a20 44.900,00 5.710.471,80 Flat Bed Truck (El ll Jam o,o2a7 0,947 | 470.000,00 445.137,00 2.3..22]. 1m' Salum berbentuk U Tipe DS 1 r.100,0000 Pekeda (rc1) hari o,5737 631,070( 90.000,00 56.796.300,00 Tukang lw2l hari o,2869 315,5900 130.000,00 41.026.700,00 Mandor (Lo3) hari 0,0574 63,1400 145.000,00 9.155.300,00 Semen (Ml2) zak o,9239 1.O16,3010 90.300,00 9L.77t.9AO30 Pasir Beton (M0l) M3 0,091s 100,6500 413.OOO,00 4 1.568.450,OO M3 o,1192 I 3 1,1200 512.OOO,00 67.133.440,00 Fomworks (Mles) M2 1,0000 1.100,0000 3r3.500,00 344.850.000,00 Air M 170 Ltr 27,7500 30.525,O000 7,80 238.095,00 tntai Kerja Beton Fc' 10 mpa M47 m3 0,0600 66,0000 r.528.635,69 100.889.955,54 Plastik Cor roll 0,0560 61,6000 391.000,00 24.08s.600,00 Besi Beton (M57al kg 26,7232 29.395,5243 15.098,00 443.813.626, l5 Kawat beton (M14) KC 0,0150 16,5000 30.100,00 496.650,00 Beton Mixer (E06) Jam 0,4016 441,760,0 86.400,00 38.168.064,00 Water Tmker lE23l Jam 0,0s57 61,2700 308.900,00 1E.926.303,00 Concrete Vibmtor (E2o) Jam 0,4016 441,7600 61.300,00 27.O79.AAA,OO Exavator (El0l jam 0,0240 26,4000 712.300,00 r8.804.720,00 8 3.1.(1) 1m3 Galian Biasa 165,0000 Pekeda L0 ll hili 0,001 1 0, 18 15 90.000,00 16.335,00 Mandor (r,o3) hari o,o006 0,0990 145.000,oo 14.355,00 Excavator (El0) Jam 0,0038 o,6270 712.300,00 446.612,1O Dump Truck (E091 bulan 0,0007 0, l20l 15.434.900,00 1.854.096,16 9 3.1.(e) lm3 Galian Perkerasan berbutir 423,0934 Pekeda (Loll hari 0,0060 4,9386 90.000,00 444.470,44 Mandor (LO3) hari 0,0010 0,8231 145.000,00 I 19.348,54 Excavator (El0l Jam 0,0070 5,7617 712.300,00 4.104.026,00 Dump Truck (E09) bulan 0,0008 0,6200 15.434.900,00 76 l0 3.2..2a'l lm3 ii^Urm* PiUf,m dai sumber ealim 222,74a4 Pekerja (10 l) hari 0,0023 0,5123 90.000,00 Mandor (1031 hili 0,0006 0,1336 t9.379,14 Baha pilihm (MO9)/Pmir urug (Ml6l M3 1,2000 267,2985 106.652 wheel Loader (E1s) Jam 0,0085 1,8934 295.s00,00 559.449,27 Dump Truck (Eoel bulm o,0008 o,t726 15.434.900,00 2.663.s47,O7 613.806,s7 Motor Grader (E131 Jam o,o040 0,8910 688.900,OO Tandem (E17) Jm o,ol 12 2,4948 Water Tanker (E231 Jam 0,0341 7,5957 ll 3.3.(l) lm2 Fenyiapan Badan Jalan 6.600,0000 3,2456 90.000,00 292.1O7,20 Mandor -]: