a.Uji Lapangan
1.Pemboran tangan 75.000 100.000 Per meter Dinas Pekerjaan Umum Provinsi Kalimantan Tengah
b.Laboratorium mekanika tanah
1.Kadar air tanah
2.Berat jenis tanah
3.Atterberg limit
4.Analisa Saringan
5.Pemadatan/ standard
6.Pemadatan modified
7.CBR laboratorium
8.Hidrometer (Grand Size)
9.Shrinkage limit
10.Unconfined Comp. test
11.Konsolidasi
12.Berat Isi
13.Kuat geser langsung 14.Permeabilitas (Constant head)
15.Permeabilitas (Falling head)
16.Triaxial (U.U)
17.Triaxial (C.U) 6.000 10.000 15.000 20.000 50.000 75.000 65.000 50.000 15.000 30.000 50.000 6.000 50.000 40.000 40.000 50.000 65.000 30.000 50.000 50.000 50.000 100.000 125.000 140.000 40.000 45.000 40.000 75.000 50.000 75.000 75.000 70.000 230.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
2.PEMUKIMAN Lingkungan Uji Kualitas Air Baku / air bersih
a.Agregat halus / pasir
1.Analisa Fisis
a.Analisa Ayak
b.Berat Jenis
c.Bobot Isi
d.Kadar air
e.Kadar Lumpur
f.Kekekalan
g.Penyerapan air 21.000 16.000 12.000 12.000 12.000 48.000 12.000 50.000 50.000 50.000 30.000 30.000 50.000 50.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel 5 1 2 3 4 5 6
b.Agregat Kasar / Kerikil
1.Analisa Fisis
a.Analisa Ayak
b.Berat Jenis
c.Bobot Isi
d.Kadar air
e.Kadar Lumpur
f.Kekekalan
g.Kekerasan
h.Penyerapan air 21.000 16.000 12.000 12.000 12.000 48.000 35.500 12.000 50.000 50.000 50.000 30.000 30.000 50.000 75.000 50.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
c.Beton
1.Beton Segar
a.Analisa Ayak
b.Berat Jenis
c.Job Mix
d.Mix. Design
e.Slump 18.000 15.000 150.000 100.000 85.000 50.000 50.000 250.000 115.000 90.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
2.Beton Keras
a.Core Drill
b.Hammer Test
c.Kuat Lentur
d.Kuat tekan 175.000 25.000 8.000 5.000 350.000 60.000 30.000 30.000 Per Sampel Per Sampel Per Sampel Per Sampel
3.Struktur dan Konstruksi Bangunan
a.Layanan Jasa Pengujian
1.Laboratorium Mekanika Tanah
a.Pemadatan Proktor
1.Modified
2.Standart 90.000 85.000 125.000 100.000 Per Sampel Per Sampel
b.Sondir 175.000 300.000 Per Sampel
c.CBR Laboratorium 100.000 140.000 Per Sampel
3.PRASARANA TRANSPORTASI Bahan dan Perkerasan Jalan.
a.Pengujian Bahan di laboratorium.
1.Aspalt Keras
a.Destilitas
b.Titik lembek
c.Titik nyala
d.Daktilitas
e.Loss On Heating (LOH)
f.Penetrasi LOH
g.Titik lembek LOH
h.Kelarutan dalam trichloor etyleen (C2HCL3)
i.Berat Jenis
j.Kekentalan
k.Kadar paraffin
l.Kelekatan
m.Kadar air
n.Viscositas absolute
o.Perkiraan suhu pencampuran dan pemadatan 75.000 35.000 60.000 38.500 38.500 55.000 31.500 350.000 31.000 50.000 500.000 37.500 87.500 60.000 175.000 100.000 50.000 65.000 50.000 50.000 60.000 50.000 450.000 50.000 60.000 600.000 50.000 100.000 65.000 200.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
2.Campuran beraspal
a.Ekstraksi (teknis)
b.Penetrasi
c.Titik lembek
d.Daktilitas
e.Kadar aspal
f.Analisa saringan 175.000 55.000 35.000 60.000 5.000 38.500 250.000 60.000 50.000 50.000 15.500 50.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel 6 1 2 3 4 5 6
3.Agregat kasar untuk campuran beton aspal dan semen
a.Analisa saringan
b.Berat jenis dan penyerapan
c.Berat isi
d.Kelekatan terhadap aspal
e.Abrasi
f.Impact
g.Kepipihan
h.Lolos saringan no. 200
i.Soundness agregat kasar 45.000 45.000 45.000 45.000 45.000 45.000 45.000 45.000 450.000 50.000 50.000 50.000 50.000 75.000 50.000 50.000 50.000 500.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
4.Agregat halus untuk campuran beton aspal dan semen
a.Analisa saringan
b.Berat jenis dan penyerapan
c.Berat isi
d.Sand equivalent
e.Atterberg limit
f.Soudness agregat halus 45.000 45.000 45.000 100.000 35.000 450.000 50.000 50.000 50.000 110.000 50.000 500.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
5.California Bearing Ratio (CBR) dengan Dynamic Cone Penetrimeter (DCP) 40.000 65.000 Per Sampel
6.California Bearing Ratio (CBR) In-situ (tanpa penggalian) 59.000 80.000 Per Sampel
7.Kepadatan dengan sand cone 45.000 70.000 Per Sampel
4.Geoteknik Jalan.
a.Pengujian Tanah di laboratorium
1.Index Protis
a.Analisa saringan
b.Hydrometer
c.Atterberg limit
d.Shinkage limit
e.Berat isi
f.Berat jenis tanah
g.Kadar air 45.000 19.000 35.000 17.000 45.000 35.000 7.000 50.000 40.000 50.000 45.000 50.000 50.000 30.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
2.Soil Copaction
a.Pemadatan standart
b.Pemadatan modified
c.CBR Standart soaked
d.CBR Standart unsoaked
e.CBR Modified soaked
f.CBR Modified unsoaked 45.000 83.700 50.000 40.000 60.000 50.000 100.000 125.000 130.000 120.000 140.000 130.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
3.Mechanical properties (sifat teknis)
a.Kuat tekan bebas
b.Kuat geser langsung manual
c.Kuat geser langsung automatic
d.Triaxial unconsolidated undrained manual
e.Triaxial unconsolidated undrained automatic
f.Triaxial consolidated undrained manual
g.Triaxial consolidated undrained automatic 25.000 30.000 40.000 45.000 55.000 145.000 210.000 40.000 50.000 55.000 65.000 70.000 165.000 230.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel 7 1 2 3 4 5 6
h.Konsolidasi manual
i.Konsolidasi automatic
j.Permeability falling head
k.Permeability constant head
l.Organik impurities 65.000 75.000 35.000 40.000 75.000 75.000 80.000 75.000 75.000 90.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
4.Rencana Campuran beton aspal
a.Berat jenis campuran
b.Analisa saringan agregat kasar (1 unit)
c.Berat jenis agregat kasar
d.Analisa saringan agregat halus (2 unit)
e.Berat jenis agregat halus (2 unit)
f.Briket marshall (15 unit) 45.000 45.000 45.000 90.000 9.000 453.900 65.000 50.000 50.000 50.000 50.000 600.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
5.Beton Aspal
a.Kepadatan mutlak
b.Marshall imerssion 75.000 30.000 90.000 50.000 Per Sampel Per Sampel
6.Agregat untuk base dan sub base
a.Analisa saringan
b.Berat jenis dan penyerapan
c.Berat isi
d.Abrasi
e.Atterberg limit
f.Pemadatan modified
g.CBR modified 45.000 45.000 45.000 45.000 35.000 83.700 109.500 50.000 50.000 50.000 75.000 50.000 125.000 140.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
7.Tanah untuk sub base
a.Berat jenis
b.Atterberg limit
c.Analisa saringan
d.Pemadatan standart
e.CBR standart
f.UCS 35.000 35.000 45.000 45.000 104.700 35.400 50.000 50.000 50.000 100.000 130.000 40.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
b.Pengujian Perkerasan dilapangan
1.Lendutan dengan Benkelman Beam (BB) 11.900 100.000 Per Titik
c.Pengujian Tanah dan batuan dilapangan
1.CBR Lapangan
2.DPC
3.Sand Cone
4.Sondir ringan, kapasitas 2,5 ton
5.Sondir berat, kapasitas 10 ton
6.Pemboran mesin tanah < 10 ton
7.Pemboran mesin tanah ≥ 10 ton
8.Pengambilan contoh tanah dengan tabung
9.Standart penetration test (SPT)
10.Pemboran tangan 59.000 40.000 45.000 220.000 350.000 120.000 140.000 38.200 38.500 75.000 80.000 65.000 70.000 300.000 400.000 150.000 170.000 60.000 60.000 100.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel 8 1 2 3 4 5 6 5. Jembatan dan Bangunan Jalan
a.Pengujian Bahan di laboratorium
1.Agregat kasar untuk campuran beton aspal dan semen
a.Analisa saringan
b.Berat jenis dan penyerapan
c.Berat isi
d.Abrasi
e.Impact
f.Kepipihan
g.Lolos saringan no. 200
h.Kadar lempung
i.Soudness 45.000 45.000 45.000 45.000 45.000 45.000 45.000 75.000 450.000 50.000 50.000 50.000 75.000 50.000 50.000 50.000 30.000 500.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
2.Agregat halus untuk campuran
a.Analisa saringan
b.Berat jenis dan penyerapan
c.Berat isi
d.Soudness
e.Organic impurities 45.000 45.000 45.000 450.000 75.000 50.000 50.000 50.000 500.000 90.000 Per Sampel Per Sampel Per Sampel Per Sampel Per Sampel
3.Pengujian Baja
a.Kuat tarik 75.000 100.000 Per Sampel
4.Pengujian mutu beton
a.Kuat tekan kubus
b.Kuat tekan silinder
c.Kuat lentur 15.000 22.500 15.000 30.000 30.000 30.000 Per Sampel Per Sampel Per Sampel
b.Pengujian Beton dan Jembatan dilapangan
1.Pengujian mutu beton dan cacat beton
a.Hammer Test 37.500 60.000 Per titik FASILITAS PERHUBUNGAN DAN TELEKOMUNIKASI
1.Tanah dan Gedung Pengujian Kendaraan Bermotor (PKB) Jalan. Tjilik Riwut Km. 7 yang pinjam pakai Po DAMRI dengan luas 614 m2 3.000.000 10.000.000 /tahun Dinas Perhubungan, Komunikasi dan Informasi Provinsi Kalimantan Tengah
2.Asrama/ Mess Jln. Cilik Riwut Km. 3,5 Palangka Raya 50.000 200.000 /bulan FASILITAS PENDIDIKAN
1.Aula Provinsi 500.000 750.000 /hari Dinas Pendidikan Provinsi Kalimantan Tengah
2.Guess House (Sekretariat) 250.000 300.000 /hari
3.Ruang Makan 250.000 300.000 /hari