4.PEKERJAAN I. BIAYA LANGSUNG PERSONIL PERENCANAAN REHABILATASI GEDUNG WISMA BOUGENVIL UPTD KESOS LANSIA BUDI AGUNG KUPANG NO TENAGA AHLI Pengalaman ORANG DURASI VOLUME (OB) SATUAN (Rp) JUMLAH (Rp) (tahun) A TENAGA AHLI 1 Ahli Teknik Cost 7.00 1.00 1.00 1.00 4,700.000 4,700,000 B TENAGA PENUNJANG 3.00 10,575,000 1 Surveyor 18.00 1.00 1.00 1.00 3,525,000 3,525,000 2 Drafter 13.00 1.00 1.00 1.00 3,525.000 3,525,000 3 Administrasi 5.00 1.00 1.00 1.00 3,525,000 3,525,000 BIAVA LANGSUNG PERSONIL 10,575,000 II. BIAYA LANGSUNG NON PERSON IL NO URAIAN SATUAN ORANG/ UNIT DURASI VOLUME SATUAN (Rp) JUMLAH (Rp) A PERLENGKAPAN & OPERASIONAL KANTOR 1,375,000 1 Komputer supplies LS 1.00 0.50 0.50 500,000 250,000 2 Sewa komputer & printer Unit/bulan 1.00 0.50 0.50 750,000 375,000 3 Baya Telepon /Fax Bin 1.00 0.50 0.50 500,000 250,000 4 Biaya ATK, Bahan Habis Pakai Ls 1.00 0.50 0.50 1,000,000 500,000 8 OPERASIONAL SURVERY LAPANGAN 2,500,000 2 Sewa Kendaraan roda 2 Unit Bulan 1.00 0.50 0.50 1.,000,000 500,000 3 Bahan Bakar dan Konsumsi Bulan 1.00 0.50 1.00 1,500,000 1,500,000 4 Dokumentasi LS 1.00 0.50 0.50 1,000,000 500,000 C PELAPORANIPRODUK PERENCANAAN 3,600,000 1 Gambar Rencana Lengkap Detail Buku 4.00 1.00 4.00 250,000 1,000.000 2 Engineering Estimate (EE) Buku 4.00 1.00 4.00 250,000 1,000,000 3 Bill of Quantity (800) Buku 4.00 1.00 4.00 200,000 800.000 4 Spesifkasi TeknkRencana Kerja dan Syarat-Syarat (RKS) Buku 4.00 1.00 4.00 200,000 800,000 BIAVA LANGSUNG PERSONIL 7,475,000 5
5.PEKERJAAN REHABILITASI LANTAI GUDANG NO URAIAN PEKERJAAN JUMLAH HARGA I PEKERJAAN PERSIAPAN Rp 11,027,850.00 II PEKERJAAN BETON Rp 7,877,174.08 - - - III PEKERJAAN GANTI PINTU GUDANG YANG RUSAK Rp 61,050,000.00 - - -- IV PEKERIAAN LANTAI DAN PENUTUP LANTAI Rp 119,512,220.42 JUMLAH TOT AL Rp 199,467,244.50 DIBULATKAN Rp 199,460,000.00
6.PEKERJAAN REHABILITASI GUDANG LOGISTIK BENCANA PENGECATAN GUDANG BENCANA NO URAIAN PEKERJAAN JUMLAH HARGA I PEKERJAAN PERSIAPAN Rp 8,325,000.00 - II PEKERJAAN PENGECATAN/FINISHING Rp 153,091,377.92 JUMLAH TOTAL Rp 161,416,377.92 DIBULATKAN Rp 161,410,000.00 6 1.3.03.01.01.0010 Bangunan Gedung Tempat Pendidikan
1.PEKERJAAN : PEMBANGUNAN 1 RUANG KELAS BARU BESERTA PARABOTNYA I NO I URAIAN I JUMLAH HARGA I I PEKERJAAN PERSIAPAN Rp 5.760.000,00 II PEKERJAAN TANAH / URUGAN Rp 12.486.932,45 III PEKERJAAN PONDASI Rp 16.504.956,49 IV PEKERJAAN BETON Rp 40.013.455,99 V PEKERJAAN PASANGAN DAN PLESTERAN Rp 72.202.200,27 VI PEKERJAAN KUSEN PINTU JENDELA BOVEN JELUSI Rp 24.125.000,00 VII PEKERJAAN PLAFOND DAN ATAP Rp 71.179.428,59 VIII PEKERJAAN LANTAl Rp 24.839.412,02 IX PEKERJAAN PENGECETAN Rp 18.170.878,51 X PEKERJAAN ELEKTRIKAL Rp 3.190.000,00 XII PEKERJAAN MEUBELER Rp 40.800.000,00 XII PEKERJAAN LAIN - LAIN Rp 728.000,00 I JUMLAH HARGA Rp 330.000.264,33 II JUMLAH HARGA TERMASUK PAJAK 11% 330.000.000,00 7
2.Pekerjaan : Jasa Konsultan Pengawasan Rehabilitasi Ruang Training Center NO. URAIAN JUMLAH HARGA (Rp.) I. BIAYA LANGSUNG PERSONIL A TENAGA AHLI 40,320,000.00 BTENAGAPENDUKUNG 29,280,000.00 - - - - - - - II. BIAVA LANGSUNG NON PERSONIL A FASILITAS KANTOR 6,800,000.00 B TRANSPORTASI 3,600,000.00 C KELUARAN/PRODUK HASIL PENGAWASAN 10,000,000.00 I JUMLAH HARGA PEKERJAAN ( A + B ) 90,000,000.00 II PPN (11 %) 9,900,000.00 Ill TOTAL HARGA PEKERJAAN 99,900,000.00 IV DIBULATKAN 99,900,000.00
3.PEKERJAAN JASA KONSULTAN PERENCANAAN REHABILITASI RUANG TRAINING CENTER No. URAIAN PEKERJAAN JUMLAH HARGA (RP) : •, A. BIAVA LANGSUNG PERSONIL % I Tenaga Ahli 55,176,000.00 II Tenaga Pendukung dan Penunjang 20,328,000.00 JUMLAH A 75,504,000.00 B BIAVA LANGSUNG NON PERSONIL I Biaya Kantor dan Lapangan 5,250,000.00 II Transportasi 2,200,000.00 Ill Biaya Pelaporan 6,625,000.00 JUMLAH B 14,075,000.00 Jumlah ( A + B ) 89,579,000.00 PPN 1 1 % 9,853,690.00 Total= Jumlah + PPN 11% 99,432,690.00 Dibulatkan 99,432,000.00 8
4.PEKERJAAN PEMBANGUNAN RUANG BINA DIRI DAN GERAK BESERTA PERABOTNYA SLBN A KONTRAK NO URAIAN PEKERJAAN VOLUME I SATUAN I HARGA I JUMLAH HARGA SATUAN (RP.) (RP.) 1.3 PEKERJAAN PEMBANGUNAN RUANG BINA DIRI DAN GERAK ( 1 RUANG ) A PEKERJAAN PERSIAPAN I JUMLAH TOTAL PEKERJAAN BONGKARAN I I 7.693.071,45 B PEKERJAAN TANAH I URUGAN I JUMLAH TOTAL PEKERJAAN TANAH / URUGAN I I 6.251.591,50 C PEKERJAAN PONDASI I JUMLAH TOTAL PEKERJAAN PONDASI I I 38.323.392 48 D PEKERJAAN STRUKTUR I JUMLAH TOTAL PEKERJAAN STRUKTUR I I 38.089.964,58 E PEKERJAAN PASANGAN I JUMLAH TOTAL PEKERJAAN PASANGAN I I 32.697.345,77 F PEKERJAAN LANTAI DAN DINDING I JUMLAH TOTAL PEKERJAAN LANTAI DAN DINDING I I 32.229.977 66 G PEKERJAAN PINTU JENDELA I JUMLAH TOTAL PEKERJAAN PINTU JEN DELA I I 8.421.122, 73 H PEKERJAAN ATAP DAN PLAFON I JUMLAH TOTAL PEKERJAAN ATAP DAN PLAFON I I 129.032.576, 16 I PEKERJAAN PENGECATAN I JUMLAH TOTAL PEKERJAAN PENGECATAN I I 9.358.053,32 J PEKERJAAN LISTRK I JUMLAH TOTAL PEKERJAAN LISTRK I I 4.845.762,00 K PEKERJAAN SALURAN DAN SELASAR KELILING I JUMLAH TOTAL PEKERJAAN SALURAN DAN SELASAR KELILING I I 3.945.718,50 L PEKERJAAN PENGADAAN MEUBELAIR RUANG BINA DIRI DAN GERAK I JUMLAH PEKERJAAN PENGADAAN MEUBELAIR RUANG BINA DIRI DAN GERAK I 6.500.000,00 I JUMLAH TOTAL PEKERJAAN PEMBANGUNAN GE DUNG BINA DIRI & GERAK ( 1 RUANG ) I 188.356.000,00 9
5.PEKERJAAN PEMBANGUNAN RUANG KANTIN BESERTA PERABOTNYA SLBN AM ROIT KONTRAK NO URAIAN PEKERJAAN VOLUME I SATUAN I HARGA I JUMLAH HARGA SATUAN (RP.) (RP.) 1.9 PEKERJAAN PEMBANGUNAN KANTIN ( 1 RUANG ) A PEKERJAAN PERSIAPAN I JUMLAH TOTAL PEKERJAAN BONGKARAN I I 7 .894.571,60 B PEKERJAAN TANAH / URUGAN I JUMLAH TOT AL PEKERJAAN TANAH / URUGAN I I 10.051.219,20 C PEKERJAAN PONDASI I JUMLAH TOTAL PEKERJAAN PONDASI I I 21.108.714,53 D PEKERJAAN STRUKTUR I JUMLAH TOTAL PEKERJAAN STRUKTUR I I 59.000.821,53 E PEKERJAAN PASANGAN I JUMLAH TOTAL PEKERJAAN PASANGAN I I 81.737.101,87 F PEKERJAAN LANTAI DAN DINDING I JUMLAH TOTAL PEKERJAAN LANTAI DAN DINDING I I 14.670.410,93 G PEKERJAAN PINTU JENDELA I JUMLAH TOTAL PEKERJAAN PINTU JENDELA I I 26.061.937,47 H PEKERJAAN ATAP DAN PLAFON I JUMLAH TOTAL PEKERJAAN ATAP DAN PLAFON I I 184.982.331,87 I PEKERJAAN PENGECATAN I JUMLAH TOTAL PEKERJAAN PENGECATAN I I 19.587.676,42 J PEKERJAAN LISTRK I JUMLAH TOTAL PEKERJAAN LISTRK I I 3.072.862,00 K PEKERJAAN SALURAN DAN SELASAR KELILING I JUMLAH TOTAL PEKERJAAN SALURAN DAN SELASAR KELILING I I 17.702.352,58 L PEKERJAAN PENGADAAN MEUBELAIR RUANG KANTIN JUMLAH TOTAL PERABOT PERLENGKAPAN GEDUNG I 19.000.000,00 I JUMLAH TOTAL PEKERJAAN PEMBANGUNAN KANTIN ( 1 RUANG) I I 464.870.000,00 1 0
6.PEKERJAAN PEMBANGUNAN RUANG UKS BESERTA PERABOTNYA SLBN AM ROIT KONTRAK NO URAIAN PEKERJAAN VOLUME I SATUAN I HARGA SATUAN I JUMLAH HARGA (RP.) (RP.) 1.8 PEKERJAAN PEMBANGUNAN RUANG UKS ( 1 RUANG ) A PEKERJAAN PERSIAPAN I JUMLAH TOTAL PEKERJAAN BONGKARAN I I 4.913.371,48 B PEKERJAAN TANAH / URUGAN I JUMLAH TOTAL PEKERJAAN TANAH / URUGAN I I 6.251.591,50 C PEKERJAAN PONDASI I JUMLAH TOTAL PEKERJAAN PONDASI I I 17.905.646,24 D PEKERJAAN STRUKTUR I JUMLAH TOTAL PEKERJAAN STRUKTUR I I 35.666.819,20 E PEKERJAAN PASANGAN I JUMLAH TOTAL PEKERJAAN PASANGAN I I 32.701.518,89 F PEKERJAAN LANTAI DAN DINDING I JUMLAH TOTAL PEKERJAAN LANTAI DAN DINDING I I 14.516.536,23 G PEKERJAAN PINTU JENDELA I JUMLAH TOTAL PEKERJAAN PINTU JENDELA I I 8.421.122,73 H PEKERJAAN ATAP DAN PLAFON I JUMLAH TOTAL PEKERJAAN ATAP DAN PLAFON I I 44.492.140,41 I PEKERJAAN PENGECATAN I JUMLAH TOTAL PEKERJAAN PENGECATAN I I 9.358.053,32 J PEKERJAAN LISTRK I JUMLAH TOTAL PEKERJAAN LISTRK I I 4.845.762,00 K PEKERJAAN SALURAN DAN SELASAR KELILING I JUMLAH TOTAL PEKERJAAN SALURAN DAN SELASAR KELILING I I 3.703.475,01 L PEKERJAAN PENGADAAN MEUBELAIR RUANG UKS 5.579.962,79 I JUMLAH TOTAL PERABOT PERLENGKAPAN RUANG UKS I I 5.579.962,97 I JUMLAH TOTAL PEKERJAAN PEMBANGUNAN RUANG UKS ( 1 RUANG) I I 188.356.000,00 1 1
7.PEKERJAAN PEMBANGUNAN RUANG KETERAMPILAN BESERTA PERABOTNYA SLBNAM ROIT KONTRAK NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (RP.) JUMLAH HARGA (RP.) 1.4 PEKERJAAN PEMBANGUNAN RUANG KETERAMPILAN ( 1 RUANG) A PEKERJAAN PERSIAPAN JUMLAH TOTAL PEKERJAAN BONGKARAN 4.490.600,06 B PEKERJAAN TANAH / URUGAN JUMLAH TOTAL PEKERJAAN TANAH IURUGAN 8.376.016,00 C PEKERJAAN PONDASI JUMLAH TOTAL PEKERJAAN PONDASI 17.590.595,44 D PEKERJAAN STRUKTUR JUMLAH TOTAL PEKERJAAN STRUKTUR 47.612.455,73 E PEKERJAAN PASANGAN JUMLAH TOTAL PEKERJAAN PASANGAN 32.701.518,89 F PEKERJAAN LANTAI DAN DINDING JUMLAH TOTAL PEKERJAAN LANTAI DAN DINDING 16.372.333,65 G PEKERJAAN PINTU JENDELA JUMLAH TOTAL PEKERJAAN PINTU JENDELA 13.781.133,27 H PEKERJAAN ATAP DAN PLAFON JUMLAH TOTAL PEKERJAAN ATAP DAN PLAFON 88.028.948,00 I PEKERJAAN PENGECATAN JUMLAH TOTAL PEKERJAAN PENGECATAN 9.358.053,32 J PEKERJAAN LISTRK JUMLAH TOTAL PEKERJAAN LISTRK 4.845.762,00 K PEKERJAAN SALURAN DAN SELASAR KELILING JUMLAH TOTAL PEKERJAAN SALURAN DAN SELASAR KELILING 7.912.583,63 L PEKERJAAN PENGADAAN MEUBELAIR RUANG KETERAMPILAN JUMLAH PEKER.JAAN PENGADAAN MEUBELAIR RUANG KETERAMPIL AN 5.400.000,00 JUMLAH TOTAL PEKERJAAN PEMBANGUNAN GEDUNG KETERAMPILAN ( 1 RUAN ) 256.470.000,00 1 2
8.PEKERJAAN PEMBANGUNAN RUANG KEPALA SEKOLAH BESERTA PERABOTNYA SDLB AM ROIT KONTRAK NO URAIAN PEKERJAAN ] ] ] JUMLAH HARGA VOLUME SATUAN SATUAN (RP.) (RP.) 1.5 PEKERJAAN PEMBANGUNAN RUANG KEPALA SEKOLAH ( 1 RUANG ) A PEKERJAAN PERSIAPAN I JUMLAH TOTAL PEKERJAAN BONGKARAN l I 750.000,00 B PEKERJAAN TANAH / URUGAN I JUMLAH TOTAL PEKERJAAN TANAH IURUGAN I I 3.335.271,81 C PEKERJAAN PONDASI I JUMLAH TOTAL PEKERJAAN PONDASI l I 9.620.725,08 D PEKERJAAN STRUKTUR I JUMLAH TOTAL PEKERJAAN STRUKTUR I I 12.297.857,86 E PEKERJAAN PASANGAN I JUMLAH TOTAL PEKERJAAN PASANGAN I l 12.204.784,54 F PEKERJAAN LANTAI DAN DINDING I JUMLAH TOTAL PEKERJAAN LANT Al DAN DINDING I l 6.784.970,04 G PEKERJAAN PINTU JENDELA I JUMLAH TOTAL PEKERJAAN PINTU JENDELA I I 4.674.724,78 H PEKERJAAN ATAP DAN PLAFON I JUMLAH TOTAL PEKERJAAN ATAP DAN PLAFON I I 12.267.390,54 I PEKERJAAN PENGECATAN I JUMLAH TOTAL PEKERJAAN PENGECATAN I I 6.063.893,40 J PEKERJAAN LISTRK I JUMLAH TOTAL PEKERJAAN LISTRK I I 4.845.762,00 K PEKERJAAN SALURAN DAN SELASAR KELILING I JUMLAH TOTAL PEKERJAAN SALURAN DAN SELASAR KELILING I 1 2.547.919,94 L PEKERJAAN PENGADAAN MEUBELAIR RUANG KEPALA SEKOLAH I JUMLAH PEKERJAAN PENGADAAN MEUBELAIR RUANG KEPALASEKOLAH I 7 4.600.000,00 I JUMLAH TOTAL PEKERJAAN PEMBANGUNAN RUANG KEPALA SEKOLAH ( 1 RUANG) I I 79.993.300,00 1 3
9.PEKERJAAN PEMBANGUNAN RUANG GURU BESERTA PERABOTNYA SLBN AM ROIT NO URAIAN PEKERJAAN KONTRAK VOLUME I SATUAN I HARGA SATUAN (RP.) JUMLAH HARGA (RP.) 1.6 PEKERJAAN PEMBANGUNAN GEDUNG RUANG GURU ( 1 RUANG) A PEKERJAAN PERSIAPAN I JUMLAH TOTAL PEKERJAAN BONGKARAN 750.000,00 B PEKERJAAN TANAH I URUGAN I JUMLAH TOTAL PEKERJAAN TANAH / URUGAN I 5.809.694,00 C PEKERJAAN PONDASI I JUMLAH TOTAL PEKERJAAN PONDASI I 15.542.765,24 D PEKERJAAN STRUKTUR I JUMLAH TOTAL PEKERJAAN STRUKTUR I 34.325.216,16 E PEKERJAAN PASANGAN I JUMLAH TOTAL PEKERJAAN PASANGAN I 32.701.518,89 F PEKERJAAN LANT Al DAN DINDING I JUMLAH TOTAL PEKERJAAN LANTAI DAN DINDING I 13.826.120,18 G PEKERJAAN PINTU JENDELA I JUMLAH TOTAL PEKERJAAN PINTU JEN DELA I 8.421.122,73 H PEKERJAAN ATAP DAN PLAFON I JUMLAH TOTAL PEKERJAAN ATAP DAN PLAFON I 64.847.780,02 I PEKER.JAAN PENGECATAN I JUMLAH TOTAL PEKERJAAN PENGECATAN I 9.358.053,32 J PEKERJAAN LISTRK I JUMLAH TOT AL PEKERJAAN LISTRK I 4.845.762,00 K PEKERJAAN SALURAN DAN SELASAR KELILING I JUMLAH TOTAL PEKERJAAN SALURAN DAN SELASAR KELILING I 5.161.967,45 L PEKERJAAN PENGADAAN MEUBELAIR RUANG GURU I JUMLAH PEKERJAAN PENGADAAN MEUBELAIR RUANG GURU I 21.500.000,00 I JUMLAH TOTAL PEKERJAAN PEMBANGUNAN RUANG GURU ( 1 RUANG ) I 217.090.000,00 14 1 0 . PEKERJAAN REHABILITASI RUANG KEPALA SEKOLAH DENGAN TINGKAT KERUSAKAN MINIMAL SEDANG BERAT BESERTA PERABOTNYA NO ITEM PEKERJAAN JUMLAH ( p . ) I PEKERJAAN UMUM DAN PERSIAPAN 3.550.000,00 II PEKERJAAN TANAH DAN PONDASI 5.732.972,86 Ill PEKERJAAN STRUKTUR 23.038.916,97 IV PEKERJAAN DINDING 1.837.009,29 V PEKERJAAN LANTAI - VI PEKERJAAN KOSEN, DAUN PINTU & BOVEN - VII PEKERJAAN FINISHING DAN PENGECATAN - VIII PEKERJAAN KUNCI DAN PENGGANTUNG - IX PEKERJAAN RANGKA ATAP, PENUTUP ATAP DAN LISPLANK 13.098.169,27 X PEKERJAAN PLAFOND 7. 1 5 4 . 9 3 1 , 6 l XI PEKERJAAN MEKANIKAL, ELEKTRIKAL - XII PEKERJAAN SANITASI - A JUMLAH ( I S / D X I I ) 54.412.000,00 D DIBULATKAN 54.412.000,00 1 5
11.PEKERJAAN REHABILITASI RUANG GURU DENGAN TINGKAT KERUSAKAN MINIMAL SEDANG BERAT BESERTA PERABOTNYA NO ITEM PEKERJAAN JUMLAH ( p . ) I PEKERJMN UMUM DAN PERSIAPAN 8.950.000,00 II PEKERJMN TANAH DAN PON DASI - Ill PEKERJAAN STRUKTUR 28.232.452,87 IV PEKERJAAN DINDING 20.619.799,59 V PEKERJMN LANTAl - VI PEKERJAAN KOSEN, DAUN PINTU & BOVEN 19.979.815,50 VII PEKERJAAN FINISHING DAN PENGECATAN 1 3 . 5 1 6 . 1 0 5 , 9 7 VIII PEKERJAAN KUNCI DAN PENGGANTUNG 2.439.517,50 IX PEKERJMN RANGKA ATAP, PENUTUP ATAP DAN LISPLANK 41.599.362,37 X PEKERJAAN PLAFOND 13.060.416,70 XI PEKERJAAN MEKANIKAL, ELEKTRIKAL 3.854.529,50 XII PEKERJAAN SANITASI - A JUMLAH ( I S/O XII ) 152.252.000,00 B DIBULATKAN 152.252.000,00
12.PEKERJAAN REHABILITASI RUANG PERPUSTAKAAN DENGAN TINGKAT KERUSAKAN MINIMAL SEDANG BERAT BESERTA PERABOTNYA NO ITEM PEKERJAAN JUMLAH ( R p . ) A PEKERJAAN UMUM DAN PERSIAPAN I 1.150.000,00 B PEKERJAAN REHAB. GEDUNG PERPUSTAKAAN I PERBAIKAN SENG DAN PLAFOND SEBAGIAN YANG RUSAK 7.924.488,84 II PEKERJAAN LANTAl 11.897.667,68 Ill PEKERJAAN FINISHING DAN PENGECATAN ULANG 14.612.067,97 IV PEK.RANGKA ATAP, PENUTUP ATAP DAN LISPLANK SELASAR 7.988.339,56 V PEKERJAAN PLAFOND SELASAR PERPUSTAKAAN 4.092.802,5 I C PEKERJAAN KAMAR MANDI & WC I PEKERJAAN TANAH DAN PONDASI 16.450.906,86 II PEKERJAAN STRUKTUR 12.075.804,15 Ill PEKERJAAN DINDING 18.746.282,27 IV PEKERJAAN LANT Al 2.978.484,30 V PEKERJAAN KOSEN, DAUN PINTU 5.730.000,00 VI PEKERJAAN FINISHING DAN PENGECATAN ULANG 5.422.210,40 VII PEKERJAAN KUNC DAN PENGGANTUNG 2.657.695,00 VIII PEKERJMN RANGKA ATAP, PENUTUP ATAP DAN LISPLANK 6.127.635,21 IX PEKERJAAN PLAFOND 6.504.219,0 I X PEKER]AAN MEKANIKAL, ELEKTRIKAL 3.758.471,50 XI PEKERJMN SANITASI & SANITAIR 19.762.924,74 1 JUMLAH ( I S / D X I I ) 157.880.000,00 2 DIBULATKAN 157.880.000,00 16
13.PEKERJAAN PEMBANGUNAN RUANG GURU BESERTA PERABOTNYA NO. U R A i A N (Rp) A PEMBANGUNAN RUANG GURU BESERTA PERABOTNYA I PEKERJAAN PENDAHULUAN Rp 4.801.700 II PEKERJAAN TANAH / URUGAN Rp 3.857.775 Ill PEKERJAAN PONDASI Rp 29.485.517 IV PEKERJAAN STRUKTUR Rp 20.442.440 - - V PEKERJAAN PASANGAN Rp 33.927.442 VI PEKERJAAN LANTAI DAN DINDING Rp 16.948.340 VII PEKERJAAN PINTU/ JENDELA Rp 5.767.850 VIII PEKERJAAN ATAP DAN PLAFOND Rp 33.611.329 IX PEKERJAAN PENGECATAN Rp 12.750.556 X PEKERJAAN LISTRIK Rp 5.106.790 - XI PEKERJAAN LAIN-LAIN Rp 497.559 XII PEKERJAAN PERABOT RUANG GURU Rp 19.100.000 JUMLAH A Rp 186.297.297 P P N 1 1 % x A Rp 20.492.703 C TOTAL PEKERJAAN ( A + B ) Rp 206.790.000 D DIBULATKAN Rp 206.790.000
14.PEKERJAAN PEMBANGUNAN RUANG KEPALA SEKOLAH BESERTA PERABOTNYA NO. U R A I A N (Rp) A PEMBANGUNAN RUANG KEPALA SEKOLAH BESERTA PERABOTNYA I PEKERJAAN PENDAHULUAN Rp 1.507.700,00 II PEKERJAAN TANAH / URUGAN Rp 1.377.033.25 Ill PEKERJAAN PONDASI Rp 6.966.861,17 IV PEKERJAAN STRUKTUR Rp 14.955.640,68 -- V PEKERJAAN PASANGAN Rp 17.391.691,09 VI PEKERJAAN PINTU/ JENDELA Rp 5.800.068,90 VII PEKERJAAN ATAP DAN PLAFOND Rp 9.151.914,27 VIII PEKERJAAN PENGECATAN Rp 4.873.357,73 - IX PEKERJAAN LAIN-LAIN Rp 145.149,45 I--- X PEKERJAAN PENGADAAN PERABOT RUAANG KEPALA SEKOLAH Rp 1.450.000,00 A JUMLAH A Rp 69.901.174,08 B PPN 1 1 % x A Rp 7.689.129,15 C TOT AL PEKERJAAN RKB ( A + B ) Rp 77.590.303,23 D DIBULATKAN Rp 77 .590.000,00 1 7
15.PEKERJAAN PEMBANGUNAN RUANG KETRAMPILAN BESERTA PERABOTNYA NO. U R A I A N (Rp) A PEMBANGUNAN RUANG KETRAMPILAN BESERTA PERABOTNYA I PEKERJAAN PENDAHULUAN Rp 4.857.770 II PEKERJAAN TANAH / URUGAN Rp 27.612.547 Ill PEKERJAAN PONDASI Rp 33.431.246 IV PEKERJAAN STRUKTUR Rp 21.886.703 V PEKERJAAN PASANGAN Rp 34.737.143 VI PEKERJAAN LANTAI DAN DINDING Rp 20.150.546 VII PEKERJAAN PINTU/ JENDELA Rp 8.357.199 VIII PEKERJAAN ATAP DAN PLAFOND Rp JUMLAH HARGA 37.501.032 - IX PEKERJAAN PENGECATAN Rp 12.875.374 X PEKERJAAN LISTRIK Rp 5.106.790 XI PEKERJAAN LAIN-LAIN Rp 429.595 XII PEKERJAAN PERABOT RUANG KETRAMPILAN Rp 16.000.000 JUMLAHA 222.945.945,95 PPN 1 1 % x A 24.524.054,05 C TOTAL PEKERJAAN ( A + B ) 247.470.000,00 D DIBULATKAN 247.470.000,00
16.PEKERJAAN PEMBANGUNAN RUANG PEMBELAJARAN KHUSUS BESERTA PERABOTNYA NO. U R A I A N (Rp) A PEMBANGUNAN RUANG PEMBELAJARAN KHUSUS BESERTA PERABOTNYA I PEKERJAAN PENDAHULUAN 4.191.670,00 II PEKERJAAN TANAH / URUGAN 3.724.935,64 - Ill PEKERJAAN PONDASI 19.720.280,35 IV PEKERJAAN STRUKTUR 18.884.865,22 V PEKERJAAN PASANGAN 29.665.812,36 Vl PEKERJAAN LANTAI DAN DINDING 15.292.206,94 VII PEKERJAAN PINTU/ JENDELA 7.466.089,35 VIII PEKERJAAN ATAP DAN PLAFOND 30.709.619,99 IX PEKERJAAN PENGECATAN 11.,368.492,84 X PEKERJAAN LISTRIK 5.106.790,13 XI PEKERJAAN LAIN-LAIN 483.426,39 XII PEKERJAAN PERABOT RUANG PEMBELAJARAN KHUSUS 10.750.000,00 A JUMLAHA 157.364.189, 19 B PPN 1 1 % x A 17.310.060,81 C TOTAL PEKERJAAN ( A + B ) 17 4.67 4.250,00 D DIBULATKAN 174.674.250,00 1 8
17.PEKERJAAN PEMBANGUNAN RUANG PERPUSTAKAAN BESERTA PERABOTNYA NO. U R A I A N (Rp) A PEMBANGUNAN RUANG PERPUSTAKAAN BESERTA PERABOTNYA I PEKERJAAN PENDAHULUAN Rp 6.111.700,00 II PEKERJAAN TANAH / URUGAN Rp 3.762.013,61 Ill PEKERJAAN PONDASI Rp 29.293.562, 70 IV PEKERJAAN STRUKTUR Rp 20.310.212,09 V PEKERJAAN PASANGAN Rp 32.526.696,44 VI PEKERJAAN LANTAI DAN DINDING Rp 16.963.286,73 VII PEKERJAAN PINTU/ JENDELA Rp 8.217.919,07 VIII PEKERJAAN ATAP DAN PLAFOND Rp 34.030.615,85 IX PEKERJAAN PENGECATAN Rp 12.499.753, 17 X PEKERJAAN LISTRIK Rp 5.106.790,13 XI PEKERJAAN LAIN-LAIN Rp 3.503.576,35 XII PEKERJAAN PERABOT PERPUSTAKAAN Rp 18.800.000,00 A JUMLAHA Rp 191.126.126,13 B PPN 11% x A Rp 21.023.873,87 C TOTAL PEKERJAAN ( A + B ) Rp 212.150.000,00 D DIBULATKAN Rp 212.150.000,00 18 PEKERJAAN PEMBANGUNAN RUANG TATA USAHA BESERTA PERABOTNYA NO. U R A i A N (Rp) A PEMBANGUNAN RUANG TATA USAHA BESERTA PERABOTNYA I PEKERJAAN PENDAHULUAN Rp 1.507. 700,00 II PEKERJAAN TANAH / URUGAN Rp 1.414.872,85 Ill PEKERJAAN PONDASI Rp 7.610.316,33 IV PEKERJAAN STRUKTUR Rp 14.688.298,98 V PEKERJAAN PASANGAN Rp 17.391.691,09 � VI PEKERJAAN PINTU/ JENDELA Rp 5.800.068,90 VII PEKERJAAN ATAP DAN PLAFOND Rp 9.151.914,27 VIII PEKERJAAN PENGECATAN Rp 4.435.160,64 IX PEKERJAAN LAIN-LAIN Rp 169.149,45 X PEKERJAAN PENGADAAN PERABOT RUAANG KEPALA SEKOLAH Rp 1.450.000,00 A JUMLAH A Rp 69.900.930,06 B PPN 1 1 % x A Rp 7.689.102,31 C TOTAL PEKERJAAN ( A + B ) Rp 77.590.032,36 D DIBULATKAN Rp 77.590.000,00 1 9
19.PEKERJAAN PEMBANGUNAN RUANG UKS BESERTA PERABOTNYA NO. U R A I A N (Rp) A PEMBANGUNAN RUANG UKS BESERTA PERABOTNYA I PEKERJAAN PENDAHULUAN 5.391.670,00 II PEKERJAAN TANAH / URUGAN 3.724.935,64 Ill PEKERJAAN PONDASI 21.200.860,74 IV PEKERJAAN STRUKTUR 20.036.981,33 V PEKERJAAN PASANGAN 29.764.475,88 VI PEKERJAAN LANTAI DAN DINDING 15.292.206,94 VII PEKERJAAN PINTU/ JENDELA 7.466.089,35 VIII PEKERJAAN ATAP DAN PLAFOND 30.709.619,99 IX PEKERJAAN PENGECAT AN 11.368.492,84 X PEKERJAAN LISTRIK 5.106.790,13 XI PEKERJAAN LAIN-LAIN 487.877,17 XII PEKERJAAN PERABOT RUANG UKS 12.450.000,00 A JUMLAHA 163.000.000,00 PPN 1 1 % x A 17 .930.000,00 B TOTAL PEKERJAAN ( A + B ) 180.930.000,00 D DIBULATKAN 180.930.000,00 I 20 Pekerjaan Pembangunan TOILET (Jamban) Siswa/Guru Beserta Sanitasinya NO. URAIAN PEKERJAAN JUMLAH HARGA (RP.) I. PEKERJAAN PERSIAPAN 996.697,00 II. PEKERJAAN TANAH 3.010.234,78 Ill. PEKERJAAN PASANGAN DAN PLESTERAN 49.156.727,15 IV. PEKERJAAN BETON 24.265.660,85 V. PEKERJAAN ATAP DAN PLAFOND 28.661.662, 10 VI. PEKERJAAAN KUSEN DAN PENGGANTUNG 9.896.033,59 VII. PEKERJAAAN MEKANIKAL ELEKTRIKAL 3.902.865,00 VIII. PEKERJAAAN KERAMIK LANT Al 15.986.900,40 IX. PEKERJAAN FINISHING 5.473.981,31 X. PEKERJAAN SANIT ASI 38.829.418,00 JUMLAH 180.180.180,18 PPN 1 1 % 19.819.819,82 JUMLAH TOTAL 200.000.000,00 DIBULATKAN 200.000.000,00 20 2 1 . Pekerjaa n : Pembangunan Gedung Bina Gerak SLB Bhakti Luhur Baumata No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah Harga (Rp) (Rp) I Pekerjaan Persiapan Jumlah Harga I Rp 12.950.000,00 II Pekerjaan Pondasi Jmlah Harga II Rp 29.823.181,88 III Pekerjaan Beton Jumlah Harga III Rp 24.425.681,89 IV Pekerjaan Dinding Jumlah Harga IV Rp 25.446.583,03 V Pekerjaan Kusen, Pintu & Jendela Jumlah Harga V Rp 12.093.450,29 VI Pekerjaan Lantai Jumlah Harga VI Rp 20.473.596,04 VII Pekerjaan Atap Jumlah Harga VII Rp 18.893.931,71 VIII Pekerjaan Plafond Jumlah Harga VIII Rp 17.514.384,00 IX Pekerjaan Elektrikal Jumlah Harga IX Rp 2.418.623,00 X Furniture & Perabotan Jumlah Harga X Rp 10.120.000,00 XI Pekerjaan Lain - Lain Jumlah Harga XI Rp 6.770.568,17 Total Harga (Rp) Rp 180.930.000,00 21 1.3.03.01.01.0018 Bangunan Gedung Terminal/Pelabuhan/Bandara DAERAH JENIS A. KEGIATAN FISIK: Provinsi Nusa Tenggara Timur Penugasan - - OUTPUT METODE LOKASI KEGIATAN KEBUTUHAN NO. 1 . PEKERJAAN DETAIL KEGIATAN DANAPENGADAAN KEGIATAN Volume Satuan 1 . 1 0 . 0 1 . 0 1 10.01 .01 . 0 1 - Penahan Gelombang Penyedia 3 8 - P P 2500 Meter RD Pembangunan/Rehabilitasi (breakwater) Waingapu Kubik 7.500.000.000 Sarana dan Prasarana (Kecamatan, Pelabuhan Perikanan Desa ) Pelaksana: Komponen;
2.10.01.01 .03 - Dermaga Penyedia 3 8 - P P 170 Meter Waingapu Persegi 6.120.000.000 (Kecamatan, Desa) Komponen; r- 3 Penyedia 3 9 - P P 135 Meter Tulandale Persegi 4.860.000.000 (Kecamatan, Desa ) Komponen; ..___
4.10.01 .01 .04 - Kolam Pelabuhan Penyedia 3 9 - P P 17667 Meter Tulandale Kubik 5.300.100.000 (Kecamatan, Desa) I Komponen; >-- --
5.10.01 . 0 1 . 1 0 - Pera Iatan dan Mesin Penyedia 3 9 - P P 1 Paket 200.500.000 Menunjang Pendataan dan Tulandale Penangkapan lkan Terukur (Kecamatan, Desa) Komponen; 22 OUTPUT NO. DETAIL KEGIATAN METODE LOKASI KEGIATAN KEBUTUHAN
2.PEKERJAAN PENGADAAN KEGIATAN DANA Volume Satuan 6 1 0. 0 1 . 0 2 - Pembangunan/ 10.01.02.01 - Rehabilitasi kolam Penyedia 85 - BBIP 400 Meter 840.000.000 ] Rehabilitasi Unit Perbenihan atau bak pemijahan/induk/pakan Tablolong Persegi I (UPTD Provinsi) alami/tandon (Kecamatan, Pelaksana: Desa) Komponen; - 7 10.01.02.03 - Rehabilitasi Saluran Penyedia 8 5 - BBIP 350 Meter 588.000.000 Air Pasok dan/atau Buang Tablolong (Kecamatan, Desa) Komponen;
8.10.01.02.05 Penyedia 8 5 - BBIP 1 Paket 203.000.000 Pembangunan/Rehabilitasi Sarana Tablolong dan Prasarana Biosecurity (Kecamatan, Desa) Komponen; OUTPUT I NO 3. PEKERJAAN DETAIL KEGIATAN METODE LOKASI KEGIATAN KEBUTUHAN I PENGADAAN KEGIATAN DANA Volume Satuan
9.10.01 .03-Pengadaan Sarana 10.01 .03.01 - Sarana prasarana Penyedia 1 2 8 - KKD 1 Paket 440.000.000 dan Prasarana Pengawasan dan pusat informasi kawasan Flores Timur Kawasan Konservasi Provinsi konservasi (Kecamatan, Pelaksana: Desa ) Komoonen; ,_ _ 1 0 Penyedia 1 2 9 - KKD 1 Paket 440,000.000 Lembata (Kecamatan, Desa) Komponen; ,--- 1 1 . 10.01.03.02 - Sarana monitoring Penyedia 1 2 8 - K K D 1 Paket 420.000.000 biofisik target konservasi Flores Timur (Kecamatan, I Desa) L Korponen; 23
4.Pekerjaan : Pengerjaan Pelabuhan Penyeberangan semau NO URAIAN JUMLAH HARGA A PEKERJAAN PERSIAPAN Rp. 238.404.281,79 - 8 BIAYA PENERAPAN SMK3 Rp. 71.441.500,00 - - C PEKERJAAN PERKERASAN DAERAH PARKIRAN Rp. 3.401.853. 715, 73 - D PEKERJAAN PAGAR BRC PELABUHAN Rp. 85.616.326,46 - - - - - - - E PEKERJAAN PAGAR TEMBOK PAGAR PELABUHAN Rp. 785.580.637,08 - - - - - - - - - Sub. Total Rp. 4.582.896.461,06 PPN 11% Rp. 504.118.610,72 Total Rp. 5.087.015.071,78 Pembulatan Rp. 5.087 .015.000,00 Pembulatan Rp. 5.087.015.000,00
5.PEKERJAAN PENGAWASAN REHABILITASI PELABUHAN RAKYAT SEMAU NO U R A I A N JUMLAH HARGA (Rp) I BIAVA LANGSUNG PERSONIL 98.460.000,00 II BIAVA LANGSUNG NON PERSONIL 41.049.600,00 JUMLAH TOTAL 139.509.600,00 PPn 1 1 % 15.346.056,00 JUMLAH TOTAL 154.855.656 00 DIBULATKAN 154.855.000 00 24 1.3.03.01.01.0029 Bangunan Peternakan/Perikanan DAE A [ENIS A KEGIATAN FIS1K' Provinsi Nusa Tenggara Timur Penugasan OUTPUT NO 1 PEKERJAAN DETAIL KEGIATAN METODE LOKASI KEGIATAN KEGIATAN KEBUTUHAN PENGADAAN DANA Volume Satuan 1 09.01.08 - Pembangunan/Renovasi Unit 09.01.08.01 - Renovasi Balai Benih Tanaman Penyedia 00178 - BBH Oetubapa 1 Unit Rp. 47.500.000 Produksi Perbenihan Tanaman Pangan dan Pangan dan Hortikultura (Kecamatan, Desa ) Hortikultura serta sarana pendukungnya Komponen; Pelaksana : UNIT PELAKSANA TEKNIS 006 - Green House/Screen House 1 - U n i t ..___ DAERAH PERBENIHAN TANAMAN PANGAN 2 HORTIKULTURA PROVINSI NUSA TENGGARA Penyedia 00179 - 88H Nonbes 1 Unit Rp. 95.000.000 MUIR (Kecamatan, Desa ) omponen; 005- Gudang Promosi/Koleksi 1 I Benih Unit n 09.01 .08.02 - Pembangunan sumber-sumber Penyedia 00178 - BBH Detubapa 1 Unit Rp. 95.000.000 air (Kecamatan , Desa ) Komponen; 005- perbaikan pintu air berikut 1 . sarana pendistribusiannya (pipa, Unit selang, dan pompa air) dan sarana pengairan lainnya ' 09.01.08.03 - Renovasi lantai jemur/UV Penyedia 00170 - 88U Buisan 1 Unit Rp. dryer/Box Dryer (Kecamatan, Desa) 225.625.000 Kompoonen, 001 - Renovasi Lantai Jemur 1 . (termasuk atap lantai jemur) Unit 1-- 5 09.01.08.04 - Sarana alsln produksi dan Penyedia 00170 · BBU Bulsan 1 Unit Rp. 95.000.000 proscessing/pengemasan benih/pengangkut (Kecamatan, Desa) Benih serta sarana pendukung Balal Benih Komponen; 020- Pengangkutan (Roda 3) 1 - U ni t ' Penyedia 00172 · BBi Noelbakl 1 Unit Rp. 95.000.000 (Kecamatan, Desa) Korponen; 020-Pengangkutan (Roda 3) 1 - U n i t - 7 Penyedia 00173-BBU Lembor 1 Unit Rp. (Kecamatan, Desa) 142.500.000 Korponen; 005- transplanter 1 - U n i t 1-- 8 09.01.08.05- Penyediaan kelengkapan Penyedia 00 1 7 1 - U P T Perbenihan Tanaman Pangan dan 2 Unit Rp. laboratorium kultur jaringan Balai Benih Hortikultura 209.000.000 (Kecamatan, Desa) Komponen; 001- Autoclave bakar/steam all 2 america model 1925x Unit 005- meja laminar dan kursi kerja 2 Unit 006- Rak lnkubasi Kultur Jaringan 2 Unit 010-timbangan analitic digital 0,001 4 (3 digit) portable Unit 0 1 1 - w a t e r distilator 2 Unit 0 1 2 - pengaduk 2 Unit 9 09.01.08.06 • Jalan Produksi lingkup Balai Penyedia 00170 · BBU Buisan 1 Unit Rp. Benih (Jalan Produksi/jalan usaha tani, jalan (Kecamatan, Desa ) 285.000.000 ..___ lingkungan lingkup BBi) Komponen;
10.Penyedia 00179 · BBH Nonbes 1 Unit Rp. (Kecamatan, Desa ) 285.000.000 t Komponen; 11 Penyedia 00180 - BBH Oelbubuk 1 Unit Rp. j I (Kecamatan, Desa) 285.000.000 i Korponen; 25 OUTPUT NO 2 PEKERJAAN DETAIL KEGIATAN METODE LOKASI KEGIATAN KEGIATAN KEBUTUHAN PENGADAAN DANA [ I Volume Satuan 09.01.09- Pembangunan/Renovasi Balai 09.01.09.04- Ruang laboratorium benih Penyedia 00175 - Sub Laboratorium pengujian benih 1 Unit Rp. Pengawasan dan Sertifikasi Benih Tanaman (Kota Waikabubak) 475.000.000 dan Hortikultura serta Sarana (Kecamatan, Desa ) Pendukungnya Kompoonen; Pelaksana : UNIT PELAKSANA TEKNIS 002- Ruang Laboratorium Kering 1 - R u a n g DAERAH PENGAWASAN DAN SERTIFIKASL 3 BENIH PROVINS NUSA TENGGARA TIMUR Penyedia 00176 -Sub Laboratorium pengujian benih 1 Unit Rp. (Ende Tengah) 475.000.000 (Kecamatan, Desa) Komponen; ' 002- Ruang Laboratorium Kering 1-Ruang n 09.01.09.08 - Penyediaan peralatan Penyedia 00177-UPT Pengawasan dan sertifikasi benih 1 Unit Rp. laboratorium tanaman pangan 726.000.000 (Kecamatan , Desa) Komoonen; 0 1 0-Desi kator 1 0 Unit 032- Meja kemurnian lengkap 2 dengan magnifier Lamp Unit 025- germinator elektrik/non 2 elektrik Unit 029-AC 1 1 Unit 004- Anak timbangan tipe E2 1 8 2 2000g Unit 015-termocouple 3 Unit 028 - Refrigrator/cool storage benih 2 Unit 005- analis set 1 2 Unit 009 - cawan aluminium 100 Unit 0 0 1 - Stick tryer 30 Unit 26 1.3.03.01.01.0030 Bangunan Gedung Tempat Kerja Lainnya PEKERJAAN PEMBANGUNAN GEDUNG STUDIO MUSIK No. JENIS PEKERJAAN TOTALHARGA I. PEKERJAAN PERSIAPAN Sub Jumlah 6,250,000.00 II. PEKERJAAN GALIAN TANAH DAN URUGAN Sub Jumlah 17,022,566.95 Ill. PEKERJAAN PASANGAN & PLESTERAN Sub Jumlah 105,399,088.93 IV. PEKERJAAN SETON Camp. 1PC:2Psr:3Krl Sub Jumlah 28,365,073.88 V. PEKERJAAN KUSEN Sub Jumlah 15,252,245.84 VI. PEKERJAAN ATAP DAN PLAFOND Sub Jumlah 32,218,105.60 VII. PEKERJAAN LANTAI & KERAMIK Sub Jumlah 14,587,599.07 VIII. PEKERJAAN PENGECATAN / FINISHING Sub Jumlah 7,220,721.85 VIII. PEKERJAAN DESAIN INTERIOR PENGEDAP SUARA Sub Jumlah 60,000,000.00 IX PEKERJAAN LAIN - LAIN Sub Jumlah 29,000,000.00 Jumlah 315,315,402.12 PPN 11% 34,684,694.23 Jumlah Total 350,000,096.35 Dibulatkan 350,000,000.00 1.3.03.01.01.0032 Bangunan Fasilitas Umum PEKERJAAN PEMBANGUNANPOSJAGA No. JENIS PEKERJAAN TOTAL HARGA I. PEKERJAAN PERSIAPAN Sub Jumlah 5.000.000,00 II. PEKERJAAN GALIAN TANAH DAN URUGAN Sub Jumlah 1.690.036,80 Ill. PEKERJAAN PASANGAN & PLESTERAN Sub Jumlah 15.394.881,63 IV. PEKERJAAN BETON Camp. 1PC:2Psr:3Krl Sub Jumlah 6. 707.271,08 V. PEKERJAAN KUSEN Sub Jumlah 3.025.439,21 VI. PEKERJAAN ATAP DAN PLAFOND Sub Jumlah 10.094.462,16 VII. PEKERJAAN LANT Al & KERAMIK Sub Jumlah 4.462.876,17 VIII. PEKERJAAN PENGECATAN / FINISHING Sub Jumlah 1.840.676,26 IX PEKERJAAN LAIN -LAIN SubJumlah 5.750.000,00 Jumlah 53.965.643,31 PPN 1 1 % 5.936.220,76 Jumlah Total 59.901.864,07 Dibulatkan 60.000.000,00 27 1.3.03.01.01.0033 Bangunan Parkir PEKERJAAN PEMBANGUNAN TEMPAT PARKIR TAMAN BUDAYA No. JENIS PEKERJAAN TOTAL HARGA I. PEKERJAAN PERSIAPAN Sub Jumlah 3.500.000,00 II. PEKERJAAN GALIAN TANAH DAN URUGAN Sub Jumlah 6.229.080,00 Ill. PEKERJAAN PASANGAN & PLESTERAN Sub Jumlah 7.091.446,47 IV. PEKERJAAN BETON DAN BESI Camp. 1 PC:2Psr:3Krl Sub Jumlah 16.400.000,00 VII. PEKERJAAN LANTAI Sub Jumlah 8.242.611,54 IX PEKERJAAN LAIN - LAIN Sub Jumlah 21.600.000,00 Jumlah 63.063.138,01 PPN 1 1 % 6.936.945,18 Jumlah Total 70.000.083, 19 Dibulatkan 70.000.000,00 1.3.03.01.01.0036 Taman PEKERJAAN : PEMBANGUNAN TAMAN LAN SCAPE PLASA NO URAIAN PEKERJAAN JUMLAH HARGA A. PEKERJAAN PERSIAPAN Rp 86.776,42 B. PEKERJAAN GALIAN DAN URUGAN Rp 8.316.093,61 C. PEKERJAAN PASANGAN DAN PONDASI Rp 53.573.714,91 D. PEKERJAAN COR BETON Rp 988.183,76 E. PEKERJAAN PAPAN NAMA KANTOR Rp 8.000.000,00 F PEKERJAAN FINISHING Rp 4.109.923,51 JUMLAH HARGA KONSTRUKSI Rp 75.074.692,21 PERENCANA 5% Rp 3.753.734,61 PENGAWAS3% Rp 2.252.240, 77 TOTAL Rp 81.080.667,58 PPN 1 1 % Rp 8.918.873,43 TOTAL SEMUA Rp 89.999.541,02 DIBULATKAN Rp 90.000.000,00 28 1.3.03.01.02.0005 Asrama PEKERJAAN PEMBANGUNAN ASRAMA SLBN NUSA BUNGTILU NO URAIAN PEKERJAAN JUMLAH HARGA 1 PEKERJAAN PERSIAPAN Rp 11.194.377,68 2 PEKERJAAN TANAH DAN URUGAN Rp 17.766.922,61 3 PEKERJAAN PASANGAN DAN PLESTERAN Rp 245.480.488,09 4 PEKERJAAN BETON Rp 78.928.050,50 5 PEKERJAAN ATAP Rp 102.332.282,26 6 PEKERJAAN PLAFOND Rp 52.4 78.445,69 7 PEKERJAAN KUSEN, PINTU, JENDELA DAN BOVEN Rp 48.296.353,45 8 PEKERJAAN LANTAI DAN KERAMIK Rp 61.015.484,24 9 PEKERJAAN INSTALASI LISTRIK Rp 27.300.222,45 10 PEKERJAAN PENGECATAN V FINISHING DAN LAIN - LAIN Rp 42.083.688,00 1 1 PEKERJAAN PAGAR TAMAN DEPAN Rp 2.215.,320,87 12 PEKERJAAN SANITASI Rp 58.833.614, 16 1 3 PENGADAAN MEUBELAIR Rp 64.518. 750,00 B TOT AL JUMLAH HARGA Rp 812.444.000,00 1.3.04.01.01.0002 Jalan Provinsi PAKET PEKERJAAN PEMBANGUNAN JALAN PRODUKSI MENUJU RUMAH PRODUKSI BERSAMA INSTALASI SUMLILI KAB. KUPANG URAIAN VOLUME SATUAN ANGGARAN Penyesuaian O E D P e m b a n g u n a n J a l a n Produksi Menuju R u m a h 1 Paket Produksi Bersama lnstalasi 85.000.000 S u m l i li Kab. Kupang P e m b a n g u n a n J a l a n Produksi M e n u j u R u m a h Produksi 1 Paket 1.000.000.000 Bersama lnstalasi S u m l i l i Kab. Kupang Pengawasan J a l a n Produksi Menuju R u m a h Produksi 1 Paket 65.000.000 Bersama lnstalasi S u m l i l i Kab. K u p a n g 29 1.3.04.03.05.0009 Instalasi Pembangkit Listrik Tenaga Surya (PLTS) PAKET PEKERJAAN PEMBANGUNAN PLTS TERPUSAT OFF-GRID DAK NO URAIAN SPESIFIKASI VOLUME SATUAN ANGGARAN Pembangunan Pl TS terpusat Dusun Uma Jawa Desa Haray Off Grid 120 Kwp di Kee. Mahu, 30 Kwp, Dusun Kalimbu 1 Paket 15.048.000.000 Kab. Sumba Timur Marada Desa Lahiru 30 Kwp, 1 Jasa Konsultasi Pembangunan dusun Ndalar Kabihu Desa Pl TS terpusat Off Grid 120 Kwp Lulundilu 30 Kwp, Dusun Opangmadangu Desa Patawai 1 Paket 411.840.000 di Kee. Mahu, Kab. Sumba 30Kwp Timur Pembangunan PLTS terpusat Off Grid 40 Kwp di Kee. 1 Paket 4.588.500.000 Umalulu, Kab. Sumba Timur Dusun Katikupelang dan 2 Hambalolang Desa Petawang Jasa Konsultasi Pembangunan 40Kwp PLTS terpusat Off Grid 40 Kwp 1 Paket 125.580.000 di Kee. Umalulu, Kab. Sumba Timur Pembangunan PL TS terpusat Off Grid 40 Kwp di Kee. Lewa 1 Paket 4.588.500.000 Tidahu, Kab. Sumba Timur Dusun 1 dan 2 Desa Kangeli 40 3 Jasa Konsultasi Pembangunan Kwp PLTS terpusat Off Grid 40 Kwp 1 Paket 125.580.000 di Kee. Lewa Tidahu, Kab. Sumba Timur Pembangunan PLTS terpusat Off Grid 80 Kwp di Kee. 1 Paket 11.115.000.000 Pahunga Lodu, Kab. Sumba Dusun Matawai dan Timur Hangganaha 40 Kwp, Dusun 4 Jasa Konsultasi Pembangunan Waikudu 20 Kwp, Dusun PLTS terpusat Off Grid 80 Kwp Mburung 20 Kwp Desa Tamma di Kec. Pahunga Lodu, Kab. 1 Paket 304.200.000 Sumba Timur Pembangunan PLTS terpusat Off Grid 110 Kwp di Kee. Umbu 1 Paket 13.010.250.000 Ratu Nggay, Kab. Sumba Dusun Wiri Dolli desa Lenang Tengah Selatan 40 Kwp, Dusun 5 Kikuhuru Mbay Desa Lenang Jasa Konsultasi Pembangunan Selatan 40 Kwp, Dusun Lakoka PL TS terpusat Off Grid 110 Kwp Desa Praikaroku Jangga 30 Kwp 1 Paket 356.070.000 di Kee. Umbu Ratu Nggay, Kab. Sumba Tengah 30 Pembangunan PLTS terpusat Off Grid 75 Kwp di Kee. 1 Paket 4. 778.500.000 Katikuna Selatan, Kab. Sumba Tengah 6 Desa Manurara 75 Kwp Jasa Konsultasi Pembangunan PLTS terpusat Off Grid 75 Kwp 1 Paket 130.780.000 di Kee. Katikuna Selatan, Kab. Sumba Tengah Pembangunan PLTS terpusat Off Grid 60 Kwp di Kee. Umbu 1 Paket 7.476.500.000 Ratu Ngay Ba rat, Kab. Sumba Dusun Melandi Desa Umbu Tengah Kawolu 30 Kwp, Dusun 7 Jasa Konsultasi Pembangunan Pandangi Desa Umbu Pabal 30 PL TS terpusat Off Grid 60 Kwp Kwp 1 Paket 204.620.000 di Kee. Umbu Ratu Ngay Ba rat, Kab. Sumba Tengah Pembangunan PLTS terpusat 1 Paket 10.165.000.000 Off Grid 70 Kwp di Kee. Wanukaka, Kab. Sumba Barat Dusun 2 Desa Pahola 40 Kwp, 8 Dusun 1 Desa Parirara 10 Kwp, Jasa Konsultasi Pembangunan Dusun 3 Desa Parirara 20 Kwp PL TS terpusat Off Grid 70 Kwp 1 Paket 278.200.000 di Kec. Wanukaka, Kab. Sumba Ba rat Pembangunan PLTS terpusat Off Grid 30 Kwp di Kee. 1 Paket 4.973.250.000 Wewewa Selatan, Kab. Sumba Ba rat Daya Dusun 3 Desa Bondo Bela 30 9 Jasa Konsultasi Pembangunan Kwp PLTS terpusat Off Grid 30 Kwp 1 Paket 136.110.000 di Kee. Wewewa Selatan, Kab. Sumba Barat Daya Pembangunan PLTS terpusat Off Grid 30 Kwp di Kee. Kodi 1 Paket 4.023.250.000 Bangedo, Kab. Sumba Barat Daya Dusun 1 Desa Rada Loko 30 10 Jasa Konsultasi Pembangunan Kwp PLTS terpusat Off Grid 30 Kwp 1 Paket 110.110.000 di Kec. Kodi Bangedo, Kab. Sumba Barat Daya Pembangunan PLTS terpusat 1 Paket 3.833.250.000 Off Grid 30 Kwp di Kee. Loura, Kab. Sumba Ba rat Daya Dusun 1 dan 2 Desa Loko 11 Jasa Konsultasi Pembangunan Kalada 30 Kwp PL TS terpusat Off Grid 30Kwp 1 Paket 104.910.000 di Kee. Loura, Kab. Sumba Ba rat Daya 31 8.1.02.02.13.0001 Beban Kursus Singkat/Pelatihan Standar Kontribusi Pelatihan No Uraian Speslflkasl Satuan Standar Harga 1 Pelatihan Orientasi PPPK Pengenalan Etika dan Nilai Organisasi Orang/ Kegiatan 2.230.287 2 Pelatihan Dasar Cal on Pegawai Golongan II & Ill Secara Klasikal Orang/ Kegiatan 11.386.000 Negeri Sipil 3 Pelatihan Dasar Calon Pegawai Golongan II & Ill Secara Blanded Learning Orang / Kegiatan 5.587.000 Negeri Sipil 4 Pendidikan dan Pelatihan Biaya Kontribusi Bimtek Kepegawaian Orang / Kegiatan 4.500.000 5 Pendidikan dan Pelatihan Biaya Kontribusi Bimtek Perencanaan Orang / Kegiatan 4.500.000 6 Pendidikan dan Pelatihan Biaya Kontibusi Pelatihan Arsiparis Orang/ Kegiatan 7.000.000 7 Beban Kursus Biaya Konsumsi dan Penginapan Balai Orang/ Bulan 2.000.000 Singkat/Pelatihan Pelatihan Vokasi Cianjur 8 Beban Kursus Biaya Konsumsi dan Penginapan Balai Orang/ Hari 250.000 Singkat/Pelatihan Pelatihan Vokasi Cianjur 9 Beban Kursus Uang Saku Peserta Magang Guru Produktif Orang/ Bulan 1.300.000 Singkat/Pelatihan SMK 10 Biaya Kontribusi Peserta Provinsi NTT Orang/ Kegiatan 1.328.735 Pelatihan Orientasi PPPK 11 Biaya Kontribusi Peserta Kabupaten Alor Orang/ Kegiatan 1.759.893 Pelatihan Orientasi PPPK 12 Biaya Kontribusi Peserta Kabupaten TTU Orang/ Kegiatan 1.601.783 Pelatihan Orientasi PPPK 13 Biaya Kontribusi Peserta Kabupaten Malaka Orang / Kegiatan 1.664.813 Pelatihan Orientasi PPPK 14 Biaya Kontribusi Peserta Kabupaten Nagekeo Orang / Kegiatan 1.715.173 Pelatihan Orientasi PPPK 15 Biaya Kontribusi Peserta Kabupaten Lembata Orang/ Kegiatan 1.695.328 Pelatihan Orientasi PPPK 16 Biaya Kontribusi Peserta Kabupaten Sumba Barat Daya Orang/ Kegiatan 1.815.503 Pelatihan Orientasi PPPK 17 Biaya Pelatihan Pusdiklatwas Pelatihan Penjenjangan Auditor Ahli Muda Orang / Kegiatan 9.600.000 BPKP 18 Pendidikan dan Pelatihan Biaya Kontribusi Bimtek Pengelolaan Barang Orang/ Kegiatan 4.500.000 Milik Daerah 32 No Uraian Speslflkasl Satuan Standar Harga Pelatihan Kepemimpinan 19 Administrator Lingkup Orang/ Kegiatan 28.600.125 Pemerintah Kabupaten/Kota Dan lnstansi Vertikal Pelatihan Kepemimpinan 20 Administrator Lingkup Orang/ Kegiatan 31.600.125 Pemerintah Provinsi NTT Pelatihan Kepemimpinan 21 Pengawas Lingkup Pemerintah O r a n g / Kegiatan 30.490.000 Kabupaten/Kota Dan lnstansi Vertikal Pelatihan Kepemimpinan 22 Pengawas Lingkup Pemerintah Orang/ Kegiatan 33.490.000 Provinsi NTT 8.1.02.02.13.0002 Beban Sosialisasi No Uraian Speslflkasi Satuan Standar Harga 19 Pendampingan an S0salsas aplikas Kegiatan 2.500.000 SIMBA , PJ. GUBERNUR NUSA TENGGARA TIMUR, PARAF HIERARKI PENETAPAN SEKRETARIS DAERAH ASISTEN PEMERINTAHAN DAN KESRA 1-------- KEPALA BIRO H UKUM 33